My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Table of Contents - September 20, 2023 <br />WO No. – UP 3775 SP - iii <br /> <br />APPENDIX A – DEPARTMENT OF ECOLOGY SPECIFICATIONS INSERT ........................... <br />APPENDIX B – STANDARD DRAWINGS .................................................................................. <br />APPENDIX C – CHANGE ORDER FORMS ............................................................................... <br />APPENDIX D – PUGET SOUND CLEAN AIR AGENCY – EXCERPTS OF AIR QUALITY <br />RULES ........................................................................................................................................ <br />APPENDIX E – NOISE ORDINANCE ......................................................................................... <br />APPENDIX F – WSDOT STANDARD PLANS ............................................................................ <br />APPENDIX G – INADVERTENT DISCOVERY PLAN ................................................................ <br />APPENDIX H – UTILITY POTHOLE DATA................................................................................. <br />APPENDIX I – CONSTRUCTION STORMWATER SITE INSPECTION FORM .......................... <br />APPENDIX J – INDUSTRIAL DISCHARGE APPROVAL REQUEST FORM ............................. <br />APPENDIX K – UTILITY RELOCATION AS-BUILT PLANS ..................................................... <br />APPENDIX L – FILTERRA BIOSCAPE VAULT PLANT PALETTES ........................................ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.