My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 44 <br />b. Any of the unit prices are excessively unbalanced (either above or below the <br />amount of a reasonable Bid) to the potential detriment of the City, as <br />determined by the City; <br />c. Receipt of Addenda is not acknowledged; <br />d. A member of a joint venture or partnership and the joint venture or partnership <br />submit Proposals for the same project (in such an instance, both Proposals <br />may be rejected); or <br />e. Proposal form entries are not made in ink. <br />1-02.14 Disqualification of Bidders <br />Revise 1-02.14 to read as follows: <br />A Bidder will be deemed not responsible if the Bidder does not meet the mandatory <br />bidder responsibility criteria in RCW 39.04.350(1), as amended, and noted in 1-02.1(1). <br />The City will verify that the Bidder meets the mandatory bidder responsibility criteria in <br />RCW 39.04.350(1). To assess bidder responsibility, the City reserves the right to request <br />documentation as needed from the Bidder and third parties concerning the Bidder’s <br />compliance with the mandatory bidder responsibility criteria. <br />If the City determines the Bidder does not meet the mandatory bidder responsibility <br />criteria in RCW 39.04.350(1) and is therefore not a responsible Bidder, the City shall <br />notify the Bidder in writing, with the reasons for its determination. If the Bidder disagrees <br />with this determination, it may appeal the determination within two business days of the <br />City’s determination by presenting its appeal and any additional information to the City. <br />The City will consider the appeal and any additional information before issuing its final <br />determination. If the final determination affirms that the Bidder is not responsible, the <br />City will not execute a contract with any other Bidder until at least two business days <br />after the Bidder determined to be not responsible has received the City’s final <br />determination. <br />If the Contract Documents contain supplemental responsibility criteria, then a Bidder will <br />be deemed not responsible if the Bidder does not meet those criteria: <br /> <br />1-02.15 Pre-Award Information <br />Revise 1-02.15 to read as follows: <br />Before awarding any contract, the City may require one or more of these items or actions <br />of the apparent lowest responsible Bidder: <br />1. A complete statement of the origin, composition, and manufacture of any or <br />all materials to be used, <br />2. Samples of these materials for quality and fitness tests, <br />3. A progress schedule, in a form the City requires, showing the order of and <br />time required for the various phases of the Work, <br />4. A breakdown of costs assigned to any bid item, <br />5. Attendance at a conference with the Engineer or representatives of the <br />Engineer, <br />6. Obtain, and furnish a copy of, a business license to do business in the City of <br />Everett. <br />7. A copy of State of Washington Contractor’s Registration, or <br />8. Any other information or action taken that is deemed necessary to ensure that <br />the Bidder is the lowest responsible bidder.
The URL can be used to link to this page
Your browser does not support the video tag.