Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 49 <br />7. Contract Plans, <br />8. City’s Standard Drawings (if any) <br />9. WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal <br />Construction, <br />10. WSDOT/APWA Standard Plans for Road, Bridge and Municipal Construction. <br />Revise the seventh paragraph of 1.04.2 to read as follows: <br />In case of any ambiguity or dispute over interpreting the Contract, the Engineer’s <br />decision will be final as provided in 1-05.1 AUTHORITY OF THE ENGINEER. <br />1-04.3 Reference Information <br />Revise 1-04.3 to read as follows: <br />Reference Information provided to the Contractor is not part of the Contract. The City of <br />Everett does not guarantee the accuracy of the Reference Information and is not <br />responsible for the content of the Reference Information in any manner. Any use of <br />Reference Information by the Contractor is done solely at the Contractor’s risk. <br />1-04.4 Changes <br />Delete 1-04.4 and substitute the following: <br />1-04.4 Changes <br />1-04.4(1) City’s Right to Direct Changes to the Work <br />(******) <br />The City reserves the right to change the Work at any time. Such changes shall not <br />invalidate the Contract nor release the Surety, and the Contractor agrees to perform the <br />Work as changed. Among others, these changes and alterations may include: <br />1. Deleting or omitting any part of the Work, Equipment or material to be <br />provided under this Contract, <br />2. Increasing or decreasing quantities, <br />3. Altering Specifications, designs, or both, <br />4. Altering the way the Work is to be done, <br />5. Adding new Work or Extra Work, <br />6. Altering facilities, Equipment, materials, services, or sites, provided by the <br />City, and <br />7. Ordering the Contractor to accelerate or Delay the Work. <br />If the Contractor and City do not agree upon scope of Work changed or adjustment to <br />the Contract Sum and Contract Time, the City may, at its sole option, unilaterally direct <br />the Contractor to implement City directed change by notice. The City shall not pay or <br />be responsible or liable for changes implemented by the Contractor without explicit <br />notice from the City to proceed. <br />1-04.4(2) Extra Work <br />(******) <br />At its sole option, the City may (1) perform Extra Work itself, (2) employ others to do it, <br />(3) direct the Contractor to perform the Extra Work at existing unit Bid price, (4) direct <br />the Contractor to perform the Extra Work at a mutually agreed upon price, or (5) direct <br />the Contractor to perform the Extra Work on a Force Account basis.