My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 82 <br /> <br /> <br /> <br />City of Everett, Traffic <br />Public Works Department <br />3200 Cedar Street <br />Everett, Washington 98201 <br />Attn: Corey Hert <br />Tel. (425) 257-8800 <br />Email: CHert@everettwa.gov <br /> <br />Verizon <br />(425) 229-3123 <br />1 -800-483-1000 (emergency) <br />Brad.landis@verizon.com <br /> <br /> <br /> <br /> <br /> <br />1-07.17(1) Utility Construction, Removal or Relocation by Contractor <br />Delete all three paragraphs of 1-07.17(1) and substitute the following: <br />If the Work requires removing or relocating a utility, utility owners or their contractors <br />will furnish all work necessary to adjust, relocate, replace, or construct their <br />facilities. <br />1-07.17(2) Utility Construction, Removal or Relocation by Others <br />Revise the first paragraph of 1-07.17(2) as follows: <br />Any authorized agent of the City or utility owners may enter the City right-of-way or <br />easement to repair, rearrange, alter, or connect their equipment. The Contractor <br />shall cooperate with such effort and shall avoid creating delays or hindrances to <br />those doing the Work. The Contractor shall arrange to coordinate work schedules <br />as needed. <br />1-07.18 Public Liability and Property Damage Insurance <br />Delete 1-07.18 and substitute the following: <br />1-07.18 Insurance <br />(******) <br />1-07.18(1) General Requirements <br />A. The Contractor shall obtain the insurance described in this section from insurers <br />approved by the State Insurance Commissioner pursuant to RCW Title 48. The <br />insurance shall be provided by an insurer with a rating of A-: VII or higher in the A.M. <br />Best’s Key Rating Guide, that is licensed to do business in the state of Washington, or <br />issued as a surplus line by a Washington Surplus lines broker. The City reserves the <br />right to approve or reject the insurance provided, based on the insurer (including
The URL can be used to link to this page
Your browser does not support the video tag.