My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
815 SIEVERS-DUECY BLVD 2025-05-05
>
Address Records
>
SIEVERS-DUECY BLVD
>
815
>
815 SIEVERS-DUECY BLVD 2025-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2025 7:46:45 AM
Creation date
11/19/2024 11:57:43 AM
Metadata
Fields
Template:
Address Document
Street Name
SIEVERS-DUECY BLVD
Street Number
815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC 'ORKS PERMIT )ate Applied: 3/15/2021 <br /> City of Everett Permit Services Public b„orks Permit#: PW2103-031 <br /> E V E R E T T 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: B2103-049 <br /> Everett, WA 98201 Planning Reference#: REVI20-036 <br /> WASHINGTON everettwa.gov/permits Public Works Fee: $15,954.52 <br /> PermitServices@everettwa.gov Schedule Inspections at:onlinepermits everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> UNDERWOOD GARTLAND 64 LLC SHANNON UNDERWOOD <br /> PO Box 3513 PO Box 3513 <br /> Bellevue,WA 980093513 BELLEVUE,WA 98009 <br /> PHONE:4258812113 PHONE:4259413182 <br /> SITE ADDRESS:815 SIEVERS DUECY BLVD TAX PARCEL ID#:28040100304100 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION:SITE DEV FOR NEW COMMERCIAL TILT UP <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits everettwa.gov.Available inspection dates are shown in the dropdown <br /> menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated XX/XX/2021. <br /> Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 7.City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be under a <br /> separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall be scheduled 3- <br /> 4 weeks in advance. <br /> 8.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to the PW Inspector per City Design and Construction <br /> Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 9. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior to final <br /> approval/close out of the permit. <br /> 10.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the City prior <br /> to final approval/close out of the permit. <br /> 11.A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.To schedule a planning <br /> inspection,contact Planning@everettwa.gov and request an inspection with the permit number,site address,and inspection type listed. Please <br /> allow up to one week for the inspection to be scheduled. <br /> 12. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained from <br /> the City's Traffic Engineering Division.This permit can be applied for online at pw.everettwa.gov and requires a traffic control plan to be <br /> submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 13.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br /> PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br /> 14.Revise the Declaration of Covenant to include check boxes for the project BMPs.Provide a recorded copy of the Declaration of Covenant to <br /> the City. <br /> 15.Provide a copy of the Ecology approval letter to the City for the Construction Stormwater General Permit. <br /> Public Works Permit Fee Breakdown: n n <br /> Erosion Control $200.000 3 v <br /> ED <br /> Grade/Fill/Excavate(5,000CY) $290.00 <br /> Paving(19,953SF) $99.77 NOV 0 4 2022 <br /> PW Plan Review $957.23 <br /> PW Site Inspection $1,914.45 CI <br /> TY O <br /> Stormwater System Development Fee $12,493.07 EVERETT <br /> Permit Services <br /> Page 1 of 2 <br /> _APPLICANT/JOB SITE COPY ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.