Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 3/15/2021 <br />City of Everett Permit Services <br />Public Works Permit #: PW2103-031 <br />3200 Cedar Street, 2"d Floor Associated Bldg Permit #: B2103-049 <br />E V E R E T T <br />Everett, WA 98201 Planning Reference #: REV120-036 <br />WASHINGTON everettwa.gov/permits Public Works Fee: $15,954.52 <br />PermitSeryices@everettwa.gov Schedule Inspections at: onlinepermits.everettwa.gov <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />UNDERWOOD GARTLAND 64 LLC SHANNON UNDERWOOD <br />PO Box 3513 PO Box 3513 <br />Bellevue, WA 980093513 BELLEVUE, WA 98009 <br />PHONE: 4258812113 PHONE: 4259413182 <br />SITE ADDRESS: 815 SIEVERS DUECY BLVD TAX PARCEL ID #: 28040100304100 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: SITE DEV FOR NEW COMMERCIAL TILT UP <br />PERMIT CONDITIONS: <br />1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov. Available inspection dates are shown in the dropdown <br />menu. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and Specifications <br />for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans, SWPPP, and drainage report approved by the City of Everett Public Works Department dated XX/XX/2021. <br />Approved plans must remain on job -site at all times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br />required inspections. A handout is provided at permit issuance with instructions on how to request an inspection online. <br />6. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW <br />Inspector. <br />7. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense. This work to be under a <br />separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department. Work shall be scheduled 3- <br />4 weeks in advance. <br />8. As-builts of storm, sanitary sewer, and water systems will be required to be submitted to the PW Inspector per City Design and Construction <br />Standards and Specifications for Development prior to final approval/close out of the permit. <br />9. A 1-year Warranty Bond in the amount of 10% of the construction costs for all public improvements shall be submitted to the City prior to final <br />approval/close out of the permit. <br />10. A 2-year Warranty Bond in the amount of 10% of the construction costs for all Stormwater Infrastructure shall be submitted to the City prior <br />to final approval/close out of the permit. <br />11. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. To schedule a planning <br />inspection, contact Planning@everettwa.gov and request an inspection with the permit number, site address, and inspection type listed. Please <br />allow up to one week for the inspection to be scheduled. <br />12. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained from <br />the City's Traffic Engineering Division. This permit can be applied for online at pw.everettwa.gov and requires a traffic control plan to be <br />submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br />13. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br />PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br />14. Revise the Declaration of Covenant to include check boxes for the project BMPs. Provide a recorded copy of the Declaration of Covenant to <br />the City. <br />15. Provide a copy of the Ecology approval letter to the City for the Construction Stormwater General Permit. <br />Public Works Permit Fee Breakdown: <br />Erosion Control .................................................. <br />$200.000 <br />Grade/Fill/Excavate (5,000CY) ............................. <br />$290.00 <br />Paving(19,953SF)................................................... <br />$99.77 <br />PW Plan Review ................................................... <br />$957.23 <br />PW Site Inspection ............................................ <br />$1,914.45 <br />Stormwater System Development Fee ........... <br />$12,493.07 <br />Page 1 of 2 <br />APPLICANT/JOB SITE COPY ADDRESS FILE TREASURER <br />