Laserfiche WebLink
2022 System Development Fee Calculations <br /> Permit#: PW2103-031 Additional Notes: <br /> Project Address: 815 Sievers Duecy BLVD <br /> Project Name: Site work for new commercial tilt-up <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: Thad Newport Date: 9/24/2022 <br /> Outside City Limits? No *Adds a 25%Surcharge 1 <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: Date: <br /> Fee Calculations: <br /> Water&Sewer System Development Fees: <br /> Domestic Meter: Fee Calculation(Before Credit): Credit Calculations(Up to 3 meters for Meter-Based Calculation or 3 previous building uses for Administrative Guidelines-Based Calculation): <br /> *Subject to Administrative Guidelines Proposed Building Use: Warehouse Previous Bldg Use#1: No Other Use Previous Bldg Use#2: No Other Use Previous Bldg Use#3: No Other Use <br /> ProposedUnit Measure: 26,666 Sq.Ft. Unit Measure for Use#1: - None Unit Measure for Use#2: - None Unit Measure for Use#3: - None <br /> Note:Meter Size Used for Proposed Meter Size: 1" Credited Meter#1 Size: None Credited Meter#2 Size: None Credited Meter#3 Size: None <br /> Calculation Water Fee: $7,200.00 Water Credit#1: $0.00 Water Credit#2: $0.00 Water Credit#3: $0.00 <br /> Sewer Fee: $9,318.00 Sewer Credit#1: $0.00 Sewer Credit#2: $0.00 Sewer Credit#3: $0.00 <br /> Total Fees Due:Add to Utility Permit for Domestic Meter <br /> Permit#:U Water Sys Dev Fee Total: $7,200.00 This fee reflects credit for existing water meter <br /> Sewer Sys Dev Fee Total: $9,318.00 This fee reflects credit for existing water meter <br /> Total: $16,518.00 <br /> Irrigation Meter: Fee Calculation(Before Credit): Credit Calculations: <br /> Proposed Meter Size: 1" Credited Meter Size: None <br /> Water Fee: $7,200.00 Water Credit: $0.00 <br /> No Sewer Fee: $0.00 No Sewer Credit: $0.00 <br /> Total Fees Due:Add to Utility Permit for Irrigation Meter <br /> Permit#:U Water Sys Dev Fee Total: $7,200.00 This fee reflects credit for existing water meter <br /> No Sewer Sys Dev Fee: $0.00 Irrigation meters are only subject to the water portion of system development fees <br /> Total: $7,200.00 <br /> Fire Meter: Proposed Meter Size: 3/4"Forinformational purposes only <br /> Permit#:U No Sys Dev Fees: $0.00 Fire meters are not subject to system development fees <br /> Stormwater System Development Fees: <br /> Permit#: B2103-049 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Building Permit <br /> Permit#: PW2103-031 Type of Construction: New Construction/Redevelopment <br /> Square Feet of New Plus Replaced Hard Surfaces: 46,619 SF <br /> Stormwater System Dev Fee: $12,493.07 Add this fee to the Public Works Permit <br />