Laserfiche WebLink
3/10/2021 https://waenergycodes.com/print_project_summary_form.php?k=aWQ9MTYzOSZmdmk9MTYmY3RpPTMx&print=1 <br /> Project Title UG 64-2018 WSEC Date Mar 09,2021 <br /> SHGC a A Calculation NENV BUILDING -SEMI-HEATED COMPLIES <br /> Fenestration and Opaque Door Assemblies PROPOSED TARGET <br /> Glazed Doors-South/East/WestFacing Assembly IU PF Glazed Door Rough Opening SHGC x A Glazed Door Rough Opening ! SHGC x A <br /> SHGC (SF) SHGC (SF) <br /> Swinging entrance door See Sheet A2.1&A3.1 0.2<PF<0.5 0.40 42.0 16.8 0.46 (1) i. 19.= <br /> Horizontal Assembly ID PF Skylight Rough Opening SHGC x A Skylight Rough Opening SHGC x A <br /> SHGC (SF) SHGC (SF) <br /> Skylights See Sheet A2.2 0.35 288.0 100.8 0.35 2(8)0 100.8 <br /> Vertical Fenestration-South/East/West Facing Assembly ID PF Fenestration Rough Opening SHGC x A Fenestration Rough Opening SHGC x A <br /> SHGC (SF) SHGC (SF) <br /> • <br /> 814.0 <br /> Fixed See A2.1&A3.1-Non-North PF<0.2 0.38 814.0 309.3 0.38 (1) 309.3 <br /> Proposed Area Proposed SHGC x A Target Area Target SHGC x A <br /> Project Totals 1,144 427 1,144 429 <br /> .` <br /> iv <br /> httgs•(/waenergycodes.com/print_project_summary_form.php?k=aWQ9MTYzOSZmdmk9MTYmY3RpPTMx&print=1 4/4) <br />