My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans and Associates, Inc. 11/18/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans and Associates, Inc. 11/18/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2026 11:40:47 AM
Creation date
11/19/2024 2:15:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans and Associates, Inc.
Approval Date
11/18/2024
Council Approval Date
11/13/2024
End Date
12/31/2027
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Merrill and Ring Creek Bridge Replacement Project
Public Works WO Number
3829-001
Tracking Number
0004588
Total Compensation
$4,024,383.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
David Evans and Associates, Inc. 1/26/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 31 of 59 <br /> <br />City of Everett Merrill & Ring Bridge Replacement <br />WORK ELEMENT 7 CONSTRUCTABILITY REVIEW, CONSTRUCTION <br />SCHEDULE, AND ESTIMATION <br /> <br />This work element is performed by Ott-Sakai & Associates (OS), to provide constructability <br />review, construction schedule, and construction estimation services. <br /> <br />The work element includes the following activities: <br /> <br />7.1 Constructability review <br /> <br />OS will provide constructability review of the design team’s prepared Plans, Estimate, and <br />Specification (PS&E) package at the TS&L, 30%, 60%, & 90% design levels. <br /> <br />7.2 Construction CPM Schedule <br /> <br />OS will prepare Construction Schedule at 60% and 100% PS&E design levels. <br /> <br />7.3 Construction Estimation <br /> <br />OS will provide construction estimation cost of the design team’s prepared PS&E package at <br />60%, 90% and 100% levels. <br />Assumptions: <br /> <br />Deliverables: <br />x Constructability Review comments for PS&E packages at TS&L, 30%, 60%, & 90% <br />design levels. <br />x Construction schedule at 60% and 100% levels. <br />x Construction estimation for PS&E packages at 60%, 90%, & 100% design levels. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.