Laserfiche WebLink
ChargePoint"Charging Stations <br /> Follow These Steps <br /> 1. Install two nuts with two washers captured between them. Lock them together so the lower end of the nut is located <br /> 6"from the bottom of the bolt.This sets the length of the exposed threads. <br /> 2. Use the Installation Template to mark the hole locations. <br /> 3. Remove the template and drill four 3/4" diameter holes 6"deep into the concrete.When locating the template, <br /> consider the station's total footprint. For reference,a template is included in this kit <br /> NOTE: <br /> • Bolts must be parallel after installation.Therefore, ensure drill holes are plumb by using a bubble level to check <br /> the angle of the drill after drilling 1 to 1 1/2". <br /> • If installing over existing buried conduit, position the center of the template around the conduit stub-up. <br /> • You may need two drill bits-one for the concrete(with the pilot)and another for the rebar(without the pilot). <br /> Always start the hole using the standard drill bit,then switch to the rebar drill bit only if drilling through rebar. <br /> 4. Remove all dust from inside the drilled holes using compressed air, or a vacuum and/or a brush. <br /> 5. If the concrete slab is only 6"deep,insert a plug in each hole to keep the epoxy in place until it hardens.Place the plug <br /> over the long end of a bolt and then use the bolt to push the plug to the bottom of the hole. <br /> 6. Fill each hole with epoxy to about 2 1/2"to 3" below the top. Continue immediately to the next step because the <br /> epoxy sets within about eight minutes. <br /> NOTE: Inserting the threaded bolts displaces the epoxy, causing it to fill the holes to grade level. If the epoxy is below <br /> grade level,you can add more after the next step. <br /> 7. Place the Installation Template over the holes.This ensures the relative position of the bolts and that the flange of the <br /> pole fits over the bolts. <br /> 8. Insert the bolts through the template, into the holes. Rotate bolts as you insert them to draw epoxy into the threads. <br /> IMPORTANT:Epoxy is very thick.Therefore, it is important to rotate the bolts as you insert them.This allows the <br /> epoxy to fully coat the threads of the bolts, reducing the amount of trapped air. <br /> NOTE:You can leave the installation template in place. <br /> 9. If needed,top up the holes with epoxy to grade level. <br /> 10. Allow the epoxy to cure for at least 15 minutes* before removing the top nuts and washers and 45 minutes* before <br /> applying torque to the nuts. <br /> *Epoxy cure times may vary depending on the type of epoxy you are using. Refer to the cure times provided with the epoxy. <br /> You are now ready to install the CPF25's pedestal mount as described in Section 2 of this installation guide. <br /> B-4 <br />