My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3618 FRIDAY AVE 2025-01-10
>
Address Records
>
FRIDAY AVE
>
3618
>
3618 FRIDAY AVE 2025-01-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 10:09:02 AM
Creation date
11/20/2024 9:00:57 AM
Metadata
Fields
Template:
Address Document
Street Name
FRIDAY AVE
Street Number
3618
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> East side of house only.West end not inspected due to revisions being submitted and currently under review. <br /> Note: Incorrect side mentioned in notes.***West side of house only. ***East end not inspected due to revisions being submitted and currently under <br /> review. <br /> 12/12/2023 12/12/2023 BLDG 12- RAKEEB KHAN PARTIAL <br /> INSULATION APPROVAL <br /> Notes: <br /> 425-770-2824 <br /> devlars@frontier.com <br /> West end walls only. <br /> 1/4/2024 1/4/2024 BLDG 02- RAKEEB KHAN PARTIAL <br /> FOOTING/SETBACK APPROVAL <br /> Notes: <br /> 425-770-2824 <br /> devlars@frontier.com <br /> Contractor adding 1 additional vertical and updating ties to math detail 7/s06.Need engineer stamped updated drawings regarding removal of holdown <br /> and new footing in crawl space. <br /> 1/4/2024 1/4/2024 BLDG 08-FRAMING RAKEEB KHAN PARTIAL <br /> APPROVAL <br /> Notes: <br /> Deck post and braces not in place.Need additional screws at deck ledge.Need updated stamped drawings regarding changes to framing in crawl space. <br /> Main floor walls ok.Anchor bolt for holdown not installed waiting for special inspection.Ok to insulate walls on main floor after anchor bolt is installed <br /> 1/8/2024 1/8/2024 BLDG 12- RAKEEB KHAN PARTIAL <br /> INSULATION APPROVAL <br /> Notes: <br /> 425-770-2824 <br /> devlars@frontier.com <br /> Walls on east end addition.Ok to drywall mud and tape. <br /> 3/12/2024 3/12/2024 BLDG 08-FRAMING RAKEEB KHAN APPROVAL <br /> Notes: <br /> Holdown installed.See attached engineering. <br /> 3/12/2024 3/12/2024 BLDG 12- RAKEEB KHAN APPROVAL <br /> INSULATION <br /> Notes: <br /> Attic and crawl insulation complete. <br /> 3/12/2024 3/12/2024 BLDG 16-FINAL RAKEEB KHAN APPRVD-PERMIT as noted <br /> FINAL <br /> Notes: <br /> 3/6/2024 7:37 AM Fabian Lopez <br /> Contact Name:Fabian Lopez <br /> Site Address:3618 FRIDAY AVE <br /> Phone:4253513234 <br /> e-Mail:salaslopez.fabian@gmail.com <br /> Contractor is extending landing to be minimum 3 feet and adding screws in pickets where missing. <br /> I <br /> Printed:Wednesday, 13 March, 2024 2 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.