Laserfiche WebLink
REQUEST FOR INFORMATION <br /> Project: Price Remodel <br /> Address: 3618 Friday Ave Everett WA <br /> RFI#: 01 <br /> TO: BTL Engineering DATE: 12/5/2023 <br /> SUBJECT: Holdown Replacement <br /> DRAWING REF: Main Floor Framing Plan—S02 <br /> DETAIL REF: NA <br /> DESCRIPTION OF REQUEST: <br /> The foundation below the wall at the entrance to the building jogs differently than how it is shown on plan. <br /> Here are a few pictures from Price job. Notice the all-thread hanging through the floor with no foundation to <br /> attach to. It is drilled through the floor in the corner of the bedroom but there is no stemwall for it to attach <br /> to. Please provide a solution. <br /> C) <br /> / Ni <br /> s, <br /> !h � <br /> RESPONSE: <br /> Please see attached SK-1 and SK-2 regarding this issue. • <br /> �F WAS <br /> Y Z <br /> 5626U <br /> F�/STER�� � <br /> RESPONSE BY: Aiden Bernhardt <br /> RESPONSE FIRM: BTL Engineering <br /> RESPONSE DATE: 12/7/2023 <br />