My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7511 BEVERLY BLVD 2024-12-02
>
Address Records
>
BEVERLY BLVD
>
7511
>
7511 BEVERLY BLVD 2024-12-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 8:00:01 AM
Creation date
11/20/2024 10:53:57 AM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
7511
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PC - PSE PRESSURE CONTROL WILL PROVIDE ITEM <br /> PO - NON STOCK ITEM <br /> CONSTRUCTION NOTES: CR = CONTRACTOR WILL PROVIDE ITEM <br /> 1. ALL UNDERGROUND CONNECTION PIPING TO BE WRAPPED PER GAS OPERATING STANDARD 2600.1100 <br /> 5 6 TO THE FIRST FITTING. <br /> 7 8 2. DO NOT PRE-FABRICATE THE INLET OR OUTLET PIPING. PLEASE CONTACT PROJECT MANAGER. PIPING <br /> SLOPE WILL VARY PER SITE GRADE. <br /> 3. REFER TO STANDARD DRAWING ST3D3-181 FOR DETAILS ON CABINET AND FOUNDATION INSTALLATION. <br /> 4. COAT VERTICAL STEEL RISER PIPES AND SENSE LINES WITH BRUSH APPLIED POWERCRETE R60. <br /> FOLLOW ALL MANUFACTURER'S DIRECTIONS FOR SURFACE PREPARATION AND CURE TIME. <br /> 5. LOCATION OF RELIEF STACK TO BE SHOWN ON CONSTRUCTION DRAWINGS. A MINIMUM OF 5'-0"TO BE <br /> 0 MAINTAINED FROM THE EDGE OF RELIEF FOUNDATION AND CA OF STACK. <br /> o LL 6. CONCRETE SUPPORT FOR RELIEF STACK IS TO BE 1'-6"DIAMETER, EXTEND 2'-0"MINIMUM BELOW <br /> GRADE AND SLOPED AT THE TOP OF THE SURFACE AS TO ALLOW WATER TO DRAIN AWAY FROM PIPE. <br /> i <br /> 7. INSTALL A DOWNSTREAM TAP FOR THE BLEEDLINE IF THERE IS NO OUTLET BODYTAP ON THE RELIEF <br /> 1 VALVE. <br /> 13 13 8. REFER TO PROJECT SPECIFIC DRAWINGS FOR CONTROL LINE INSTALLATION AND MATERIALS. <br /> 14 15 14 15 PRESSURE CONTROL NOTES: <br /> 1. PRESSURE CONTROL TO SET THE RELIEF VALVE AT XX PSIG. <br /> 2'-8 1/8" <br /> 4'-10" <br /> (REF) 15 2 PLUG, 3/4" X CLASS 6000, THD 7200024 <br /> 14 2 VALVE, BALL, 3/4" X 2000PSIG, THD 9996141 <br /> 13 2 NIPPLE, 3/4" X 3" X 0,154", GR B, SCH80, THD 9996424 <br /> 12 1 CAP 4" EG WEATHER 5200708 <br /> 11 10' PIPE, 4" X 0.237", ALUMINUM 5700900 <br /> 10 1 COUPLING, 4"PVC SCH 80 5800520 <br /> 9 1 NIPPLE, 4" X 12" X 0.377, GR-B, THD 9995883 <br /> 8 1 RESTRICTOR, 1/4" MOONEY TYPE 24 7400372 <br /> 7 1 FILTER, 1/4" FISHER P594-1 6200376 <br /> RELIEF PLAN VIEW 12 6 1 PILOT, 1/4" MOONEY SERIES 20 7400371 <br /> SCALE:3/4"=1'-O" 5 1 REGULATOR, 4" X ANSI 150, FISHER EZR 9996624 <br /> XX CAPACITY CAGE, XX SPRING <br /> 4 2 BOLT KIT 4" 15FFSVX 5000042 <br /> 3 2 FLANGE, 4" X ANSI 150, WIN RF 9996834 <br /> 2 5 ELL, 4" X 90'X 0,237", Y52, WELD LR 9996779 <br /> 1 20'f PIPE, 4" X 0.237", X42, WELD, BARE 7000435 <br /> ITEM QTY DESCRIPTION PART NO <br /> BILL OF MATERIALS <br /> 54"X 54" X 71" EL100-71 <br /> MULTI-PURPOSE BILL OF MATERIAL ASSOCIATED <br /> APPARATUS ENCLOSURE <br /> SOLELY WITH THIS SHEET OF THE <br /> DRAWING <br /> it <br /> I <br /> o � <br /> I a <br /> 0 0 0 0 0 0 0 0 0 n <br /> M <br /> 00000000 <br /> 0000000o O <br /> 0000 00 3 4 I o <br /> 3 4 ft 2 <br /> 2 GAS MAIN PRESSURE AND TESTING <br /> 0 <br /> TEST TYPE ❑ SOAP ❑ AIR ❑ NITROGEN ❑ WATER <br /> DATE ON / / START TIME TESTED BY <br /> DATE OFF / / STOP TIME <br /> THREAD END OF PRESSURE TEST RESULTS❑ P ❑ F <br /> 1 1 ALUMINUM VENT STACK TEST TYPE ❑ SOAP ❑ AIR ❑ NITROGEN❑ WATER o <br /> b DATE ON / / START TIME TESTED BY a <br /> M DATE OFF / / STOP TIME o <br /> 0 <br /> I PRESSURE TEST RESULTS❑ P ❑ F � <br /> iv 10 ❑ TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 <br /> 0._ DESIGN PRESS1 SYSTEM MAOP <br /> GRADE T� (MAX) 9 2023 03/10 <br /> n L CALL(800) 5 16 <br /> 0'-1" t 1" FITTER'S CHECKLIST YOU DI <br /> (CHECK BOX TO CONFIRM COMPLETION) PROJECT MANAGER CONTACT INFO 2 BUSINESS DAYS BEFORE YOU DIG a <br /> JEFF KIESZ THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES <br /> e (REF) o ❑ INSPECTED STEEL AND PE PIPE PER GOS 2450.1400 AND 2450.1500. 206-348-2347 CELL PHONE REAL ESTATE/EASEMENT PERMIT <br /> °° ° I ❑ REVIEWED AND COMPLIED WITH ALL CONSTRUCTION NOTES. 'ff.kiesz se.com EMAIL N/A <br /> N <br /> o z o z 1 ❑ RECORDED ALL REQUIRED INFORMATION ON THE AS-BUILT PER GOS 2500.1700. FUNCTION NAME PHONE DATE <br /> n ° ° ° 1n ❑ COMPLETED POST INSTALLATION INSPECTION PER GOS 2525.1200 AND 2525.2700. 3 -----N A----- PROJECT MGR J.KIESZ 206-716-2715 <br /> ❑ LEFT THE WORK AREA IN A CLEAN AND SAFE CONDITION. 2 -----N A----- ENGINEER J.SPADONI 425-424-7822 <br /> 1I-----N/A----- DRAWN BY P.DAO 253-395-6343 <br /> 1'-6"0 FOREMAN'S SIGNATURE: REV DATE BY IDESCRIPTION CHECKED BY <br /> O COUNTY EMER SECTION GAS WK CTR APPROVED BY J.ENlWG 425-424-7824 <br /> FOREMAN'S NAME(PRINTED): SNOHOMISH PGRPCO17 CP APR M.GALLARDO 206-716-2743 i <br /> IF <br /> COMPANY: DATE: j 1/4 SECTION OR MAP PLAT MAP °o <br /> 2 <br /> 2 4680 06/11 144.080 146.081 MAPPING <br /> 2 JOINT FACILITIES ARRANGEMENTS <br /> UTILITY w <br /> 0 1 1 CONTACT .o <br /> SECTION A RELIEF STACK ELEVATION VIEW PHONEI I I 9 <br /> SCALE:3/4" =1'-0" - SCALE:3/4"=1'-0" SAP ORDER NUMBER rn <br /> ®PUGET RS 109090338 Y <br /> REV DESCRIPTION BY CKR CP ENG APR PM DATE SOUND 4"RELIEF,FISHERR EZR EZR,AG CABINET DWG NUMBER REV 3 <br /> ENERGY gEVERLY BLVD&75 ST,EVERETT 3D12-593 <br /> REVISIONS SCALE:3 4" = 1'-O" 1/1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.