My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7511 BEVERLY BLVD 2024-12-02
>
Address Records
>
BEVERLY BLVD
>
7511
>
7511 BEVERLY BLVD 2024-12-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 8:00:01 AM
Creation date
11/20/2024 10:53:57 AM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
7511
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REGULATOR CABINET REGULATOR CABINET <br /> IX 20 <br /> SOLAR PANEL 4"POST <br /> ,i 4" POST <br /> (SEE NOTE 21) <br /> 1FN <br /> J <br /> Q I X <br /> TI <br /> REGULATOR CABINET 23 24 ERX BOX w <br /> 4" POST 19 <br /> TI <br /> — — — — — — 5 4 5 4 <br /> C <br /> INSTRUMENTATION INSTRUMENTATION <br /> 7 TO TIE-IN TO ERX r, r,� TO TIE-IN TO ERX 7 <br /> AS NECESSARY �+z m z <br /> 22 0 o AS NECESSARY <br /> PSE INSTRUMENTATION 2 Z z Z z 2 <br /> TO INSTALL ERX AND w w <br /> TO DETERMINE HEIGHT INSTRUMENTATION w m m INSTRUMENTATION <br /> OF THE BOX o o <br /> 21 < <br /> z <� <br /> 1 ERX BOX /� CONTRACTOR CONTRACTOR <br /> L18 <br /> GRADE GRADE <br /> 3/8" TUBING ANDFITTINGS TO BESUPPLIED BYINSTRUMENTATION35 H35 TAPECOAT H35 25TAPECOAT <br /> 4,1s43/4"STW PIPE <br /> 7SEE NOTE 27 3/4"STW PIPE 15 <br /> \ \ S \ SECTION e SE ALE:1" 1 D" c <br /> /\ \\i SCALE:1" _i'_O. <br /> L� <br /> ELEVATION VIEW A GAS MAIN PRESSURE AND TESTING <br /> SCALE:1" =1'-0" 1 TEST TYPE ❑ SOAP ❑ AIR ❑ NITROGEN❑ WATER <br /> o DATE ON / / START TIME TESTED BY <br /> N DATE OFF / / STOP TIME <br /> n PRESSURE TEST RESULTS❑ P ❑ F <br /> TEST TYPE ❑ SOAP ❑ AIR ❑ NITROGEN❑ WATER <br /> DATE ON / / START TIME TESTED BY <br /> 0 <br /> DATE OFF / / STOP TIME <br /> PRESSURE TEST RESULTS❑ P ❑ F <br /> �^ ❑ TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 <br /> m <br /> DESIGN PRESSI I SYSTEM MAOP <br /> 0 2023 03/10 <br /> a <br /> i <br /> 0 <br /> CALL(800)4245555 <br /> v 2 BUSINESS DAYS BEFORE YOU DIG <br /> o THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES <br /> MI REAL ESTATE/EASEMENT PERMIT <br /> FITTER'S CHECKLIST (CHECK BOX TO CONFIRM COMPLETION) N/A N/A <br /> PROJECT MANAGER CONTACT INFO FUNCTION NAME PHONE DATE <br /> w <br /> ❑ INSPECTED STEEL AND PE PIPE PER 400 AND 2450.1500. JEFF KIESZ PROJECT MGR J.KIESZ 206-716-2715❑ REVIEWED AND COMPLIED WITH ALL CONSTRUCTION <br /> TRUCTIRUCTI ON NOTES. <br /> 206-348-2347 CELL PHONE ENGINEER J.SPADONI 425-424-7822 <br /> N ❑ RECORDED ALL REQUIRED INFORMATION ON THE AS-BUILT PER COS 2500.1700. jeff.kiesz@pse.com EMAIL DRAWN BY P.DAO 253-395-6343 <br /> ❑ COMPLETED POST INSTALLATION INSPECTION PER GOS 2525.1200 AND 2525.2700. CHECKED BY R.NAKANO 253-395-6340 <br /> E ❑ LEFT THE WORK AREA IN A CLEAN AND SAFE CONDITION. COUNTY EMER SECTION GAS WK CTR APPROVED BY J.EWING 425-424-7824 <br /> j SNOHOMISH 76 IPGRPCO17 CP <br /> OP MAP PLAT MAP APP M.GALLARDO 206-716-2743 <br /> o FOREMAN'S SIGNATURE: <br /> 1/4 SECTION <br /> 0 <br /> 9 FOREMAN'S NAME(PRINTED): NE-07-28-05E 144.080 146.081 MAPPING <br /> COMPANY: DATE: JOINT FACILITIES ARRANGEMENTS <br /> UTILITY <br /> 4680 06/11 CONTACT <br /> 0 <br /> g PHONE <br /> - QA ISSUED FOR PERMIT PUGET RS-2839-ERX SAP ORDER NUMBER <br /> s REV DESCRIPTION BY CKR CP ENG APP PM DATE '®SOUND BEVERLY BLVD&75 ST DWG NUMBER R V <br /> 9 REVISIONS ENERGY EM12-593 <br /> EVERETT <br /> SCALE:AS NOTED 1 2/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.