Laserfiche WebLink
RS-2839 <br /> ABOVE GRADE CABINET <br /> 2 <br /> PROPOSED ERX <br /> SEE SHEET 2 FOR DETAILS <br /> 3/4"CONTROL LINE <br /> PROP 6"STW IP OUTLET PIPING <br /> I <br /> 3/4"CONTROL LINE <br /> r <br /> i <br /> 3/4"OUTLET SENSE LINE <br /> 3/4" INLET SENSE LINE <br /> PROP 4" STW HP INLET PIPING L� <br /> PROJECT PHASE NOTIFICATION # ORDER # <br /> SAP SUPERIOR 11612326 109128151 <br /> SERVICE/METER <br /> SERVICE/METER <br /> SERVICE/METER <br /> GAS IND SERVICE <br /> PLAN VIEW IND MSA <br /> SCALE:3/4" =1'—O" DIS REG/FT <br /> HP SVC/MSA <br /> RELOCATE <br /> RETIREMENT <br /> a <br /> M <br /> N GAS MAIN PRESSURE AND TESTING <br /> 0 <br /> o TEST TYPE ❑ SOAP ERETSULTS <br /> ❑ NITROGEN❑ WATER <br /> DATE ON TIME TESTED BY <br /> o DATE OFF / / E <br /> N PRESSURE LTS❑ P ❑ F <br /> TEST TYPE ❑ SOAP ❑ NITROGEN❑ WATER <br /> DATE ON / / E TESTED BY <br /> DATE OFF / / E <br /> m PRESSURE LTS❑ P ❑ F <br /> w ❑ TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 <br /> o DESIGN PRESSI I SYSTEM MAOP <br /> a 2023 03/10 <br /> i <br /> CALL(800)424-5555 <br /> 2 BUSINESS DAYS BEFORE YOU DIG <br /> o THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES <br /> MI REAL ESTATE/EASEMENT PERMIT <br /> FITTER'S CHECKLIST (CHECK BOX TO CONFIRM COMPLETION) N/A N/A <br /> N <br /> ❑ INSPECTED STEEL AND PE PIPE PER GOS 2450.1400 AND 2450.1500. PROJECT MANAGER CONTACT INFO FUNCTION NAME PHONE DATE <br /> n <br /> i ❑ REVIEWED AND COMPLIED WITH ALL CONSTRUCTION NOTES. JEFF KIESZ PROJECT MGR J.KIESZ 206-716-2715 <br /> 206-348-2347 CELL PHONE ENGINEER J.SPADONI 425-424-7822 <br /> PROJECT CONTACT LIST FOR JOB#XXXX)OOCX ❑ RECORDED ALL REQUIRED INFORMATION ON THE AS—BUILT PER GOS 2500.1700. jeff.kiesz@pse.com EMAIL DRAWN BY P.DAO 253-395-6343 <br /> ❑ COMPLETED POST INSTALLATION INSPECTION PER GOS 2525.1200 AND 2525.2700. CHECKED BY R.NAKANO 253-395-6340 <br /> TITLE NAME OFFICE CELLULAR EMAIL ❑ LEFT THE WORK AREA IN A CLEAN AND SAFE CONDITION. COUNTY EMER SECTION GAS WK CTR APPROVED BY J.EWING 425-424-7824 <br /> PROJECT MANAGER JEFF KIESZ 206-716-2715 206-348-2347 jeff.kiesz®pse.com SNOHOMISH 76 PGRPC017 CP APP M.GALLARDO 206-716-2743 <br /> a FOREMAN'S SIGNATURE: 1/4 SECTION OP MAP PLAT MAP <br /> PROJECT ENGINEER JOE SPADONI 425-424-7822 425-256-0463 joseph.spadoni®pse.com <br /> 9 FOREMAN'S NAME(PRINTED): NE-07-28-05E 144.080 146.081 MAPPING <br /> CORROSION ENGINEER MICHELLE GALLARDO 206-716-2743 425-749-9500 michelle.gallardo®pse.com JOINT FACILITIES ARRANGEMENTS <br /> 3 PRESSURE CONTROL TECH ERIC CANNON 206-396-4428 206-396-4428 eric.cannon®pse.com COMPANY: DATE: UTILITY <br /> .o CATHODIC PROTECTION TECH RICK KESSLER 425-748-6328 206-571-7908 richard.kessler®pse.com 4680 06/11 CONTACT <br /> 9 ENGINEERING SPECIALIST PHUONG DAD 253-395-6343 425-698-5846 phuong.dao®pse.com PHONE <br /> ISSUED FOR CONSTRUCTION SAP ORDER NUMBER <br /> CONSTRUCTION MANAGER JOE GRAHAM 206-716-2711 206-396-7413 joe.graham®pse.com PER WO#1 091 281 51 ®p���7 RS-2839-ERX <br /> 3 GAS CONTROL SUPERVISOR BOB FORBES 425-462-4657 425-495-6319 bob.forbes®pse.com ' SOUND DWG NUMBER REV <br /> REV DESCRIPTION BY CKR CP ENG APP PM DATE BEVERLY BLVD&75 ST <br /> 9 QUALITY ASSURANCE& ZAK MOHAMED 425-462-3723 425-247-6751 zak.mohamed®pse.com ENERGY EVERETT E3D12-593 <br /> INSPECTION SUPERVISOR SCALE:3 4"= 1'-0" 1/2 <br />