Laserfiche WebLink
GENERAL NOTES AERIAL VIEW <br /> CODE AND STANDARDS 1� <br /> 1.ALL WORK SHALL COMPLY WITH 2O17 NATIONAL ELECTRIC CODE(NEC),2015 INTERNATIONAL BUILDING CODE BLUE RAVEN <br /> (IBC),2015 INTERNATIONAL RESIDENTIAL CODE(IRC),2015 INTERNATIONAL PLUMBING CODE(IPC),AND ALL STATE <br /> AND LOCAL BUILDING,ELECTRICAL,AND PLUMBING CODES. <br /> 2.DRAWINGS HAVE BEEN DETAILED ACCORDING TO UL LISTING REQUIREMENTS. <br /> • 1403 N. Research Way <br /> SITE NOTES/OSHA REGULATION Orem, UT 84097 <br /> 1.A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 800.377.4480 <br /> 2.THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM. WWW.BLUERAVENSOLAR.COM <br /> 3.THE SOLAR PV INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING,MECHANICAL,OR BUILDING ROOF VENTS. <br /> 4.ROOF COVERINGS SHALL BE DESIGNED,INSTALLED,AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND CONFIDENTIAL-THE INFORMATION <br /> THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SHALL SERVE TO PROTECT • HEREIN CONTAINED SHALL NOT BE <br /> THE BUILDING OR STRUCTURE. • USED FOR THE BENEFIT OF ANYONE <br /> EXCEPT BLUE RAVEN SOLAR NOR <br /> LL IT BEWHOLE <br /> SOLAR CONTRACTOR SHA N PART DO O ISC0 ERSSEDIOUTS DE OR <br /> 1.MODULE CERTIFICATIONS WILL INCLUDE UL1703,IEC61646,IEC61730. _ — RECIPIENTS ORGANIZATION,EXCEPT <br /> 2.IF APPLICABLE,MODULE GROUNDING LUGS MUST BE INSTALLED AT THE MARKED GROUNDING LUG HOLES PER low IN CONNECTION WITH THE SALE AND <br /> THE MANUFACTURER'S INSTALLATION REQUIREMENTS. USE OF THE RESPECTIVE EQUIPMENT, <br /> 3.AS INDICATED BY DESIGN,OTHER NRTL LISTED MODULE GROUNDING DEVICES MAY BE USED IN PLACE OF WITHOUT THE WRITTEN PERMISSION <br /> STANDARD GROUNDING LUGS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. OF BLUE RAVEN SOLAR LLC. <br /> 4.CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO ,�•' <br /> LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. <br /> 5.CONDUIT POINT OF PENETRATION FROM EXTERIOR TO INTERIOR TO BE INSTALLED AND SEALED WITH A `' � NAB C E P <br /> SUITABLE SEALING COMPOUND. _ <br /> 6.DC WIRING LIMITED TO MODULE FOOTPRINT W/ENPHASE AC SYSTEM. TMi <br /> 7.ENPHASE WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/SUITABLE WIRING CLIPS. ^ C E RTI F I E D <br /> 8.MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC UNLESS NOT �' - • PV INSTALLATION <br /> AVAILABLE. r <br /> 9.ALL INVERTERS,MOTOR GENERATORS,PHOTOVOLTAIC MODULES,PHOTOVOLTAIC PANELS,AC r PROFESSIONAL <br /> PHOTOVOLTAIC MODULES,DC COMBINERS,DC-TO-DC CONVERTERS,SOURCE CIRCUIT COMBINERS,AND Scott Gurney <br /> CHARGE CONTROLLERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND • _ _ #PV-011719-015866 <br /> LISTED FOR THE APPLICATION PER NEC 690.4(B). <br /> 10.ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. <br /> CONTRACTOR: <br /> 11.TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE SPECIFICATIONS(WHEN PROVIDED) , • { - _ 1' _ <br /> IN ACCORDANCE WITH NEC CODE 110.14(D)ON ALL ELECTRICAL CONNECTIONS. \� BRS FIELD OPS <br /> 800-377-4480 <br /> EQUIPMENT LOCATIONS <br /> 1.PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT �`��}� • _ • <br /> WILL BE PROVIDED AS PER SECTION NEC 110.26. M <br /> 2.EQUIPMENT INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS •: '� <br /> SPECIFIED BY NEC 690.31(A)AND NEC TABLE 310.15(B). �� •' :>' - <br /> 3.ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC • - U <br /> APPLICABLE CODES. <br /> 4.ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. O Q <br /> Y <br /> 00 LO <br /> do < O') coPROJECT INFORMATION: � � �� '' C: rn ti <br /> > o co <br /> NUMBER OF STORIES: 2 i 0 Q Ijj Ijj <br /> CONDUIT RUN: Interior LL N N <br /> ECOBEE QTY: 1 _ v <br /> N <br /> LIGHT BULB QTY: 18 <br /> PV METER: Not Required DESIGN CRITERIA SITE SPECIFICATIONS SHEET INDEX (D 0 I— H H <br /> ROOF TYPE (1) INFORMATION: O O � W >. Cl) <br /> WIND SPEED: 110 mph CONSTRUCTION -V-B PV1 -COVER SHEET F- _ � <br /> ROOF TYPE: Comp Shingle GROUND SNOW LOAD: 35 Ib/ft2 ZONING: RESIDENTIAL PV2-SITE PLAN U) �o Of Cl)W Cl) <br /> FRAMING TYPE: Rafter :3 I` � U U <br /> WIND EXPOSURE FACTOR: C PV3- ROOF PLAN <br /> SHEATHING TYPE: TONGUE AND GROOVE SEISMIC DESIGN CATEGORY: D PV4-STRUCTURAL U Y cy) W Q ID <br /> ATTACHMENT: SFM Infinity Flashkit PV5- ELECTRICAL 3-LINE DIAGRAM <br /> RACKING: Unirac SFM Infinity @ 48" OC Portrait/72"OC Landscape DRAWING BY: <br /> NUMBER OF ATTACHMENTS: 30 SCOPE OF WORK PV6- ELECTRICAL CALCULATIONS <br /> PV7-WARNING LABELS AND LOCATIONS PremiumCAD <br /> ROOF TYPE (2) INFORMATION (IFAPPLICABLE): INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM AND ANY (ALL OTHER SHEETS AS REQUIRED) <br /> *SEE PV4.2 <br /> NECESSARY ADDITIONAL WORK NEEDED FOR INSTALLATION. SS- PRODUCT SPEC. SHEETS PLOT DATE: <br /> March 1, 2023 <br /> PROJECT NUMBER: <br /> SYSTEM TO BE INSTALLED INFORMATION: UTILITY COMPANY: 699177 <br /> DC SYSTEM SIZE: 6.715 kW DC Snohomish County Public Utilities District <br /> AC SYSTEM SIZE: 4.93 kW AC (PUD) SHEET NAME: <br /> MODULE TYPE: (17)QCells Q.PEAK DUO BILK ML-G10+ 395 COVER SHEET <br /> INVERTER TYPE: Enphase IQ8PLUS-72-2-US <br /> MONITORING: Enphase IQ Combiner 4 X-IQ-AM1-240-4 PERMIT ISSUER: REVISION: PAGE NUMBER: <br /> City of Everett 0 PV 1 <br />