My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
29 E INTERCITY AVE 2025-01-10
>
Address Records
>
E INTERCITY AVE
>
29
>
29 E INTERCITY AVE 2025-01-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 1:37:47 PM
Creation date
11/21/2024 11:45:56 AM
Metadata
Fields
Template:
Address Document
Street Name
E INTERCITY AVE
Street Number
29
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2208-116 Description:ADD KITCHEN&BATHROOM,STORAGE TO BEDRM& <br /> RELOCATE FURNACE <br /> Applied:8/30/2022 Approved: 11/28/2022 Site Address: 29 E INTERCITY AVE <br /> Issued: 1/23/2023 Finaled: City,State Zip Code: EVERETT,WA <br /> Status: EXPIRATION NOTICE SENT Applicant:JOEY PEREZ <br /> Parent Permit: Owner:ALL ABOUT COMFORT LLC <br /> Parent Project: Contractor: REH GROUP LLC <br /> Details: <br /> ADD KITCHEN&BATHROOM,STORAGE TO BEDRM&RELOCATE FURNACE <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 1/24/2023 1/24/2023 BLDG 01- RAKEEB KHAN OTHER <br /> CONSULTATION <br /> Notes: <br /> ROY 678-682-5354 <br /> REHGROUPI@OUTLOOK.COM <br /> *FYI-GC IS AWARE HE NEEDS PLUMBING&ELECTRICAL PERMITS* <br /> rfk changed Inspection Type from BLDG 08-FRAMING to BLDG 01-CONSULTATION <br /> rfk changed Inspection Type from BLDG 08-FRAMING to BLDG 01-CONSULTATION <br /> rfk changed Inspection Type from BLDG 08-FRAMING to BLDG 01-CONSULTATION <br /> rfk changed Inspection Type from BLDG 08-FRAMING to BLDG 01-CONSULTATION <br /> Discussed with the contractor about updating drawings and resubmitting new drawings for changes.Also discussed needing rough in approvals first <br /> before framing inspection can be completed.Apply for mechanical plumbing and electrical permits. <br /> 2/21/2023 2/21/2023 BLDG 08-FRAMING I RAKEEB KHAN I APPROVAL see notes <br /> Notes: <br /> ROY <br /> 678-6825354 <br /> UN097@HOTMAIL.COM <br /> Provide updated floor plan layout. Keeping location of furnace and existing walls that impact hallway and bedroom sizes. Fire stopping not complete <br /> BLDG 09-FIRE <br /> 2/22/2023 2/22/2023 STOPPING/BLOCKIN RAKEEB KHAN APPROVAL <br /> G <br /> Notes: <br /> Foamed penetration and added rock wool as discussed <br /> I <br /> Printed:Thursday,21 November,2024 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.