Laserfiche WebLink
GENERAL STRUCTURAL NOTES ABBREVIATIONS SPECIAL INSPECTIONS SCHEDULE <br /> DESIGN CRITERIA HELICAL PILES AB ANCHOR BOLT FTG FOOTING 4 <br /> CODE:2018 IRCIIBC&AMENDMENTS AS ADOPTED BY THE REVIEWING AGENCY/COUNTY. 1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2018 INTERNATIONAL ABV ABOVE GA GAUGE SPECIAL INSPECTIONS TABLES PER THE 2018 IBC.ALL ITEMS NON-APPLICABLE ITEMS HAVE BEEN _ <br /> ROOF 25 PSF SNOW(GROUND) BUILDING CODE(IBC). AFF ABOVE FINISH FLOOR GALV GALVANIZED MARKED WITH A"-" ITEMS REQUIRING SPECIAL INSPECTION HAVE BEEN MARKED WITH AN'X'. <br /> FLOORS 2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY IDEAL MANUFACTURING,INC.,AND SHALL BE ALT ALTERNATE GLB GLULAM BEAM <br /> RESIDENTIAL 40 PSF IN ACCORDANCE WITH ESR-3750. ALUM ALUMINUM GR GRADE TABLE 1705.3 <br /> REQUIRED SPECIAL INSPECTIONS AND PESTS OF CONCRETE CONSTRUCTION <br /> BALCONY/DECK 60 PSF 3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH ESR-3750. APPROX APPROXIMATE GYP GYPSUM WALL BOARD <br /> 4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE AYC ALASKAN YELLOW CEDAR HOG HOT-DIPPED GALVANIZED CONTINUOUS PERIODIC SPECIAL REFERENCED IBC <br /> TYPE <br /> GENERAL CONDITIONS CRITERIA FOR CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER(EAA) BB BOX BEAM HDR HEADER INSPECTION INSPECTION STANDARD REFERENCE <br /> 1. THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS AND SHALL NOTIFY THE STRUCTURAL COATINGS AC228. BF BOTTOM FLUSH HF HEM FIR 1.Inspect reinforcement.noludrg prestressing _ - ACI 316 Ch 20 252 t9oe4 <br /> ( ) tendons and verity pacement 253.2651-2653 <br /> ENGINEER OF ANY DISCREPANCIES HE MAY FIND BEFORE PROCEEDING WITH THE WORK. 5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE BLDG BUILDING HGT HEIGHT 2 Reinforcing oar w 14119 _ <br /> 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE REINFORCING STEEL.BUILDING STRUCTURAL STEEL,OR ANY OTHER METAL BUILDING COMPONENTS PER BLKG BLOCKING HT HEIGHT a.VB9yweldabNM of reinforcing oars - - <br /> other Irian ASTM A 706, AWS Of 4 <br /> STARTING WORK.THE ARCHITECT/ENGINEER SHALL IMMEDIATELY BE NOTIFIED IN WRITING OF ANY AC358 SECTION 3.9. BM BEAM IN INCH o.Inspect single-pass Metwems.maximum ACI318 2654 <br /> DISCREPANCIES. 6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. BOT BOTTOM IT JOINT ` am <br /> . . <br /> 3. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING DRAWINGS SHALL 7. ONLY MANUFACTURER-APPROVED CONNECTORS,ADAPTORS,AND ACCESSORIES MAY BE USED. BP BOTTOM PLATE MAX MAXIMUM c Inspect an other wells - - <br /> 3 Inspect anchors can In concrete - - ACI 31e:17 82 - <br /> BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE STRUCTURAL ENGINEER BEFORE 8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF BRG BEARING MIN MINIMUM e.lnspeet anchors posurmaied in hardened U J <br /> PROCEEDING WITH ANY WORK SO INVOLVED. INCLINATION OF H-1 DEGREE FROM VERTICAL PER SECTION 4.2.1 OF ESR-3750. BTWN BETWEEN MISC MISCELLANEOUS concrete members 0 -. <br /> Iowan"SMT BASEMENT a Adheswe anchors Installed iIowan"4. IN CASE OF CONFLICT, NOTES AND DETAILS OF THESE STRUCTURAL DRAWINGS SHALL TAKE 9. MONITOR AND RECORD DEPTH OF PILE PENETRATION.PROVIDE TORQUE MONITORING DEVICE AS PART OF NB NON-BEARING or upwardq inclined orientations to resist - - ACI 318.17 824 - D H V <br /> B/W BOTTOM OF WALL sustained lesson toads <br /> PRECEDENCE OVER THE"GENERAL NOTES"AND/OR"STANDARD DETAILS". THE INSTALLING UNIT.MONITOR AND RECORD TORQUE APPLIED DURING THE INSTALLATION OF EACH PILE NO NUMBER o Mechanical anemrs am adhesive anchors _ _ Z <br /> 5. IF A SPECIFIC DETAIL IS NOT SHOWN FOR ANY PART OF THE WORK,THE CONSTRUCTION SHALL BE THE AT SPECIFIC DEPTHS. CANT CANTILEVEROC ON CENTER not donned in 4 a W m <br /> CJ CONTROL JOINT 5 veren use w r ec,Ys.7a mu _ ACI 318.Cl 19. 19041 19042. - z <br /> SAME AS FOR SIMILAR WORK. 10. HELICAL PILES SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE THE CLG. CEILING PSF POUNDS PER SQUARE FOOT 09o" - 264 3.2644 9062 59083 <br /> 6 Prior to con[et p, D ae specimens IV <br /> 6. WORKING DIMENSIONS SHALL NOT BE SCALED FROM PLANS, SECTIONS, OR DETAILS ON THESE MINIMUM REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS PSI POUNDS PER SQUARE INCH tw wren m t b Ill air <br /> ASTM c 172 to <br /> N CEILING JOIST g - - ASTM C 31 190810 7 ILA <br /> DRAWINGS. THAN TWO(2).THE MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL CIA CLEAR PT PRESSURE TREATED c t le'- e 1en 'lore p1 ACI318'264 5 26.12 L Z '7 <br /> to enure, <br /> 7. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND THE STRUCTURAL ENGINEER OF ANY CAPACITY OF ANY INDIVIDUAL COMPONENT OF THE PILE ASSEMBLY. CMU CONCRETE MASONRY UNITRAF RAFTER T Inspect cm=: tie placement tor - - ACI 318 264 5 1908.6.19oe.7. 0 0 w <br /> 11. ALL BRACKETS AND HELICAL PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE REF REFERENCE p Pe aPp 1908 8 <br /> CONDITION WHICH IN HIS OPINION MIGHT ENDANGER THE STABILITY OF THE STRUCTURE OR CAUSE COL COLUMN avemye� s-�:feocunng - J <br /> temperance - _ - <br /> REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE FULLYRED REQUIRED ' inspect AI pre, <br /> a,r�r-r s..1 --Ix <br /> I r and - - ACI318 26921 <br /> 8. THE CONTRACTOR SHALL SUPERVISE AND DIRECT HIS WORK AND HE SHALL BE SOLELY RESPONSIBLE CONN CONNECTION REQD o qWf gw,Ompdedprest�essrtgtemore - - ACI 318 26.92E - <br /> FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES. PROVIDE ENGAGED WITH BOTTOM OF CONCRETE FOUNDATION. CONST CONSTRUCTION SF SQUARE FOOT 10 Inspect erection of precast concrete members - - Act 318 Ch 268 - <br /> ADEQUATE SHORING AND BRACING OF ALL STRUCTURAL MEMBERS DURING CONSTRUCTION. 13. ALL HELICAL PILE ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE TORQUE CONT CONTINUOUS SIM SIMILAR 11 Verity in-sau concrete strength.pnor to stress,ng <br /> REQUIRED FOR INSTALLATION AND ALL INDUCED STRESSES. of lemons m al of shores <br /> annedd <br /> concrete am - - ACI 318'26102 <br /> - 1/�• <br /> 9. ALL WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE LATEST EDITION OF THE CTR CENTER SPF SPRUCE PINE FIR pnwtoremnvaotlernioamrormsean <br /> INTERNATIONAL BUILDING CODE,AND ALL OTHER REGULATING AGENCIES EXERCISING AUTHORITY OVER 14. THE PILE QUANTITY,LAYOUT,AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT DET DETAIL STD STANDARD beams and structural stabs <br /> 12 Inspe<law an of Itkforshape location and <br /> ANY PORTION OF THE WORK. WRITTEN APPROVAL FROM THE ENGINEER-OF-RECORD PRIOR TO INSTALLATION. DF DOUGLAS FIR(SOUTH) SYP SOUTHERN YELLOW PINE Rained <br /> wine concrete member Deng - - ACI Sta 26.101011 - <br /> 10. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. 15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2015 AND 2012 IBC SECTION 1705.9 MUST BE DFL DOUGLAS FIR LARCH T/ TOP OF <br /> WHERE THE NOTES,DRAWINGS,AND/OR SPECIFICATIONS DIFFER,THE MORE STRINGENT REQUIREMENT PROVIDED FOR THE INSTALLATION OF THE HELICAL PILES AND FOUNDATION BRACKETS.ITEMS TO BE DIM DIMENSION T/C TOP OF CONCRETE TABLE 1706.7 <br /> SHALL APPLY. RECORDED AND CONFIRMED BY THE SPECIAL INSPECTOR MUST INCLUDE THE FOLLOWING: DJ DOUBLE JOIST REQUIRED SPECIAL INSPECTIONS AND TESTS OF DRIVEN DEEP FOUNDATION ELEMENTS <br /> T/P TOP OF PLATE <br /> 11. REFER TO THE ARCHITECTURAL DRAWINGS FOR INFORMATION NOT COVERED BY THESE GENERAL NOTES A. PRODUCT MANUFACTURER DIA DIAMETER T/S TOP OF STEEL 'TYPE CONTINUOUS SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION <br /> . <br /> OR THE STRUCTURAL DRAWINGS. B. MANUFACTURER'S CERTIFICATION OF THE INSTALLERS DN DOWN T/W TOP OF WALL 1 Veiny element maeros s¢es and lengths comply with <br /> tte requl,emenls. x - <br /> 12. NOTIFY ENGINEER OF ALL FIELD CHANGES PRIOR TO INSTALLATION. C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS,EXTENSIONS, DS DOWN SPOUT 2 Detemm d,ne capaces rot m test elements and Coutt x - <br /> TF TOP FLUSH manna'load tests.as required. <br /> BRACKETS,BOLTS,THREADED RODS,NUTS,WASHERS,AND TORQUES AS SPECIFIED IN THIS EA EACH 3 Inspect along operations and maintain complete am x <br /> 13. DISCREPANCIES FOUND BETWEEN STRUCTURAL DRAWINGS AND OTHER DOCUMENTS ARE TO BE NOTED EF EACH FACE TJ TRIPLE JOIST accurate recwas torearn element - <br /> REPORT AND THE CONSTRUCTION DOCUMENTS 4.von placement or ea s and t b confirm <br /> IN WRITING TO THE ENGINEER PRIOR TO CONSTRUCTION. T/BM TOP OF BEAM Verily plac p um ness,c <br /> D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT,INSTALLATION EQUIPMENT USED,AND EJ EXPANSION JOINT type and sae w hammer record number of blows per <br /> 14. ALL CONSTRUCTION SHALL BE DONE WITH MATERIALS,METHODS,AND WORKMANSHIP ACCEPTED AS ELEV ELEVATION T/SIABTOP OF SLAB root w penetration determine required penetrations Ile x - <br /> THE IDEAL FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS acheve design capaev record hp and bud elevations <br /> GOOD PRACTICE BY THE CONSTRUCTION INDUSTRY IN CONFORMANCE TO THE PROVISIONS OF THE EN EDGE NAILING(PANEL) TP TOP PLATE and document any damage td toumaron element <br /> E. ANTICIPATED AND ACTUAL PILING DEPTH 5 . <br /> °INTERNATIONAL BUILDING CODE"(IBC),AND STANDARDS REFERENCED THEREIN. EQ EQUAL TYP TYPICAL inspections <br /> For see meenss elenw+Its accordance wdh Secaon vs perform additional special - - <br /> F. REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION <br /> 15. STRUCTURAL STABILITY OF ALL NEW AND EXISTING STRUCTURES DURING CONSTRUCTION SHALL BE ES EACH SIDE UNO UNLESS NOTED OTHERWISE 6 For cororzle elements and concrete-tilled elements <br /> G. INCLINATION AND POSITION OF PILES,TOP OF PILE EXTENSION IN FULL CONTACT WITH BRACKET, perform tests am additional special Inspect011s In - - <br /> THE RESPONSIBILITY OF THE CONTRACTOR.THIS INCLUDES EXCAVATIONS,COLUMNS,EQUIPMENT EW EACH WAY UPA UNDER POST ABOVE accordance wen Section-roc_. <br /> LOADS,MATERIAL LOADS,AND OTHERS.OBSERVATIONS BY THE ENGINEER-OF-RECORD DO NOT TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS ARE INSTALLED FB FLUSH BEAM UWA UNDER WALL ABOVE 7 For specially eremems.perform adddonal e,specirons BY AN APPROVED IDEAL FOUNDATION SYSTEMS INSTALLER. as determined by the registered design protessonal in - <br /> - <br /> INCLUDE INSPECTIONS OF TEMPORARY LOADING AND STABILITY DURING CONSTRUCTION. FIN FINISH VERT VERTICAL responsl50 charge <br /> 16. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION,MISALIGNMENT,OR FAILURE TO MEET OTHER <br /> 16. MINIMUM ASSUMED SOIL BEARING CAPACITY...............3,000 PSF FL FLOOR VIF VERIFY IN FIELD <br /> SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE.ABANDON REJECTED PILES AND FLSHG FLASHING W/ wm1 6202 2ND DR SE <br /> INSTALL ADDITIONAL PILES AS REQUIRED. <br /> FND FOUNDATION WC WESTERN CEDAR EVERETT <br /> FP FIREPLACE WP WATERPROOF WA 98203 <br /> CONCRETE ANCHORS HELICAL PILE PROOF TESTING FT FOOT WWF WELDED WIRE FABRIC <br /> 1. ALL SPECIFIED CONCRETE ANCHORS SHALL BE SIMPSON STRONG TIE,HILT],OR EQUIVALENT.SPECIAL THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE(3) <br /> INSPECTIONS REQUIRED. PERCENT OF PILES UP TO FIVE(5)PILES MAXIMUM(ONE(1)MINIMUM)IN ACCORDANCE WITH THE PROCEDURE <br /> OUTLINED IN ASTM D1143 AND/OR THE 2018 INTERNATIONAL BUILDING CODE(IBC).THE MAXIMUM TEST LOAD S220412-2XR <br /> STRUCTURAL AND MISC.STEEL SHALL BE TWO-HUNDRED(200)PERCENT OF THE SPECIFIED DESIGN LOAD. <br /> 1. REFERENCE STANDARDS:DESIGN,FABRICATION AND ERECTION ARE TO BE IN ACCORDANCE WITH THE JT <br /> LATEST EDITION OF THE AISC"CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES". PROOF TESTING SHALL BE IN ACCORDANCE WITH ASTM STANDARD D 1143-81 <br /> 2. MATERIALS: GEOTECHNICAL SPECIAL INSPECTOR SHALL BE CONTINUOUSLY PRESENT DURING PILE INSTALLATION AND <br /> M RT <br /> BOLTS-ASTM A307,UNLESS OTHERWISE NOTED LOAD TESTING <br /> WE BEAMS-ASTM A572-50(Fy=50,000 PSI) 06/27/2022 <br /> HSS ROUND COLUMNS-ASTM A500 Gr.B(Fy=42,000 PSI) <br /> HSS RECTANGULAR COLUMNS-ASTM A500 Gr.B(Fy=46,000 PSI) <br /> ALL OTHER STEEL-ASTM A36(Fy=36,000 PSI) <br /> STRUCTURAL STEEL WELDING <br /> 1. CONFORM TO THE AWS CODES Dl.1 AND D1.3.,AND USE ONLY CERTIFIED WELDERS.WELDS NOT <br /> SPECIFIED ARE TO BE 1/4°CONTINUOUS FILLET MINIMUM.USE DRY E70 ELECTRODES. <br /> ALTERNATES: <br /> 1. ALTERNATE ASSEMBLIES AND MATERIALS WILL BE CONSIDERED FOR REVIEW.ENGINEER MAY REQUEST <br /> PAYMENT FOR REVIEW;CONTRACTOR WILL BEAR BURDEN FOR ADDITIONAL PAYMENT AT NO ADDITIONAL <br /> COST TO OWNER. VT <br /> LLJ <br /> H <br /> JOBSITE SAFETY: 0 <br /> I. THE ENGINEER AND/OR ARCHITECT HAVE NOT BEEN RETAINED OR COMPENSATED TO PROVIDE DESIGN Z <br /> AND/OR CONSTRUCTION REVIEW SERVICES RELATED TO THE CONTRACTOR'S SAFETY PRECAUTIONS OR J <br /> TO MEANS,METHODS,TECHNIQUES,SEQUENCES OR PROCEDURES FOR THE CONTRACTOR TO PERFORM Q <br /> HIS WORK.THE UNDERTAKING OF PERIODIC SITE VISITS BY THE ENGINEER AND/OR ARCHITECT SHALL <br /> NOT BE CONSTRUED AS SUPERVISION OF ACTUAL CONSTRUCTION NOR MAKE HIM RESPONSIBLE FOR HU <br /> PROVIDING A SAFE PLACE FOR THE PERFORMANCE OF WORK BY THE CONTRACTOR,SUBCONTRACTORS, <br /> SUPPLIERS OR THEIR EMPLOYEES,OR FOR ACCESS,VISITS,USE,WORK,TRAVEL,OR OCCUPANCY BY ANY ce <br /> F- <br /> PERSON. L/) <br /> Q '1 <br /> ce in <br /> UJ <br /> z <br /> Lu <br />