! <br /> 1 ! 2 3 4 <br /> ` 1 <br /> GROUNDING PLAN LEGEND: GROUND BUSS BAR NOTE: <br /> • <br /> ---EXISTING GROUND WIRE Illhk <br /> ---NEW GROUND WIRE (:� COPPER 1. BURNDY GROUNDING CLAMP REQUIRED TO BOND BUSS BAR TO TOWER <br /> GROUND ROD STEEL.ATTACH BURNDY CLAMP(GAR3B03TC,TESSCO#542362)TO G P D GROUP <br /> ROUND MEMBER BELOW BUSS BAR OR PARALLEL TO GROUND BUSS BAR. <br /> I EXOTHERMIC WELD BURNDY CLAMP SHALL NOT BE INSTALLED ABOVE BUSS BAR. Professional Corporation <br /> GROUND <br /> TESTWELL O2. IF EXISTING BUSS BAR IS TO BE RE-USED,INSTALL BURNDY BONDING ,P <br /> • MECHANICAL CONNECTION STRAP FROM BUSS BAR TO TOWER STEEL AS NOTED ABOVE. szo south Main s ., <br /> 330.5712100 Fax 330.E _ <br /> GENERAL NOTES: <br /> 1. CONTRACTOR SHALL HAVE A COMPLETE <br /> UNDERSTANDING OF THE CONTENTS OF AT&T • ^ <br /> STANDARD TP-76416. Mtsct <br /> 2. ALL GROUNDING CONDUCTORS SHALL PROVIDE A <br /> STRAIGHT DOWNWARD PATH TO GROUND WITH <br /> GRADUAL BEND AS REQUIRED.GROUND WIRES SHALL - MECHANICAL LUG CONNECTION(rYP,) - Mobility <br /> NOT BE LOOPED OR SHARPLY BENT. C1 -SEE DETAIL 6 ON SHEET G-2 19801 SW 72ND AVENUE,STE.200 <br /> 3. KOPR-SHIELD ANTI-OXIDATION COMPOUND SHALL BE <br /> USED ON ALL COMPRESSION GROUNDING TUALATIN,OR 97062 <br /> CONNECTIONS. s.P. <br /> 4. ALL EXOTHERMIC CONNECTIONS SHALL BE INSTALLED <br /> UTILIZING THE PROPER CONNECTION/MOLD AND NEW#2 AWG GROUND LEAD - - <br /> MATERIALS FOR THE PARTICULAR APPLICATION. FROM NEW NOKIA TRI RRH _ <br /> 5. ALL BOLTED GROUNDING CONNECTIONS SHALL BE 4T4R B12/14/29 370W AHLBBA `� GAMMA <br /> INSTALLED WITH AN EXTERNAL TOOTHED LOCK 35' <br /> WASHER.GROUNDING BUS BARS MAY HAVE RRH TO EXISTING SECTOR , C2 <br /> PRE-PUNCHED HOLES OR TAPPED HOLES.ALL GROUND BAR(TYP.)G-2 -\ O 4.14 <br /> • C� <br /> -SEE DETAIL 3 ON SHEET G-2 J ` .. <br /> HARDWARE SHALL BE SECURITY TORQUE HARDWARE .. Network Solutions <br /> 3/8"STAINLESS STEEL. +, <br /> \ <br /> 6. EXTERNAL GROUNDING CONDUCTOR SHALL NOT BE it <br /> INSTALLED OR ROUTED THROUGH HOLES IN ANY 22263 68TH AVENUE SOUTH <br /> METAL OBJECTS,CONDUITS,OR SUPPORTS TO \\ .��`\ KENT.WA 98032 <br /> PRECLUDE ESTABLISHING A MAGNETIC CHOKE POINT. <br /> 7. PLASTIC CLIPS SHALL BE USED TO FASTEN AND <br /> SUPPORT GROUNDING CONDUCTORS.FERROUS �\ ,,/\/, C3 <br /> METAL CLIPS WHICH COMPLETELY SURROUND THE �/ '' m <br /> GROUNDING CONDUCTOR SHALL NOT BE USED. S <br /> }" <br /> E. CONTRACTOR SHALL REPAIR/PLACE EXISTING ® !�/ \�- � Z <br /> GROUNDING SYSTEM COMPONENTS DAMAGED DURING MI . `s 3 <br /> CONSTRUCTION AT THE CONTRACTORS EXPENSE. 1,, I♦�., ,■■ \. OZ r o m <br /> 9. ALL DETAILS ARE SHOWN IN GENERAL TERMS.ACTUAL -.`,'1,\ .,.... '.■.1. F _' W g <br /> INSTALLATION AND CONSTRUCTION MAY VARY DUE TO O a > <br /> SITE SPECIFIC CONDITIONS. B2 _��. <br /> 10. GROUND ALL ANTENNA BASES,FRAMES,CABLE RUNS. "'` �♦•0 ,'��■\••. ' <br /> AND OTHER METALLIC COMPONENTS USING GROUND / <br /> WIRES AND CONNECT TO SURFACE MOUNTED BUS 11 <br /> \\ �J♦.........� -'I..b. CI n z a <br /> BARS.FOLLOW ANTENNA AND BTS MANUFACTURER'S 'MOM <br /> p O ❑ <br /> PRACTICES FOR GROUNDING REQUIREMENTS. /\Al :�.: �� �\ ❑ w O w <br /> GROUND COAX SHIELD AT BOTH ENDS AND EXIT FROM •♦.4 1�11MW > <br /> TOWER OR POLE USING MANUFACTURERS PRACTICES. NEW#2 AWG GROUND LEAD -- �"I \111b ,�.. W m �- <br /> 11. ALL WIRES SHALL BE COPPER THHN/rHWN.ALL . ,. <br /> FROM NEW NOKIA ♦. <br /> GROUND WIRE SHALL BE GREEN INSULATED WIRE ANTENNA TO EXISTING I- Q ` O <br /> ABOVE GROUND. SECTOR GROUND BAR(TYP.) `,• <br /> \ �'� ' , ~ <br /> 12. CONTRACTOR TO VERIFY AND TEST GROUND SOURCE. \ :1�`\r� • <br /> 1 .�..� o o S <br /> -SEE DETAIL 3 ON SHEET G-2 r. <br /> GROUNDING AND OTHER OPERATIONAL TESTING WILL BETA B2 <br /> I <br /> BE WITNESSED BY WIRELESS REPRESENTATIVE, 1 �♦•t w a m o <br /> 13. REFER TO DIVISION 16 GENERAL ELECTRIC;GENERAL 250° 1 Q'.•, • <br /> ELECTRICAL PROVISION AND COMPLY WITH ALL II I 0,"t'-SL <br /> 14. E ECTRICAREQUIREME CONTRACTOR TO PROVIDE DETAILED NTS OF GROUNDING STANDARDS. I �zC�,F,01‘\qsH!1�.76 <br /> • <br /> DESIGN OF GROUNDING SYSTEM,AND RECEIVE ® <br /> ��g G <br /> APPROVAL OF DESIGN BY AUTHORIZED WIRELESS ,\• y YU"'' <br /> REPRESENTATIVE,PRIOR TO INSTALLATION OF DD+ .'` / - <br /> GROUNDING SYSTEM.PHOTO DOCUMENT ALL <br /> CADWELDS AND GROUND RINGS. <br /> 15. NOTIFY CONSTRUCTION MANAGER IF THERE ARE ANY !i'B7 h7� O �� <br /> DIFFICULTIES INSTALLING GROUNDING SYSTEM DUE Ilk''� ASk is <br /> TO SITE SOIL CONDITIONS. B1 /MI& SS7(kV AL F."" <br /> 16. USE PANT SCHEME FOR LOADING GROUNDS ON MGB A...,• <br /> AS DISCUSSED IN NSTD 119,33 8 36. ,.■.,• - .' <br /> GROUND ROD NOTES: ■■,' `RES f i(,LUL4 <br /> AWN,' <br /> 1. ELECTRICAL CONTRACTOR SHALL ORDER GROUND i���r 07/01 2022 <br /> RESISTANCE TESTING ONCE THE GROUND SYSTEM •■•, • <br /> HAS BEEN INSTALLED:A QUALIFIED INDIVIDUAL, �•■■•••. r <br /> UTILIZING THE FALL OF POTENTIAL METHOD,SHOULD 4•11111, - —I Q <br /> PERFORM THE TEST.THE REPORT WILL SHOW THE I1111.1 r� J cc, 00 <br /> LOCATION OF THE TEST AND CONTAIN NO LESS THAN B 4..., • J C <br /> TEST POINTS ALONG THE TESTING LINE,GRAPHED OUT ,■•/,' . / /, Q J N <br /> TO SHOW THE PLATEAU. ' Q m <br /> 2. POINT GROUND TEST OR 3 POINT 62%TESTS WILL NOT S. _ <br /> BE ACCEPTED AS ALTERNATIVES TO THE AFORE `1'i / . r?> z rZ MENTIONED GROUND TESTS.TEST SHALL BE - ,r Al <br /> F OM THE NC SYSPERFORMED TEM EM GRIDS AND ETHE XISTING ING IS ISOLATED /�/ •./ W w I- O <br /> COMMUNICATIONS FACILITY. / / <br /> w� <br /> ` w (e ♦/1 <br /> re 0 <br /> A •^ \ LOCATED AT EACH SECTOR(TYP.) / V) , v v <br /> CELL REFERENCE GROUND BAR:POINT OF GROUND U7 W <br /> REFERENCE FOR ALL COMMUNICATIONS EQUIPMENT <br /> FRAMES.ALL BONDS ARE MADE WITH#2 STRANDED GREEN �• (FIELD VERIFY LOCATION) W m <br /> INSULATED COPPER CONDUCTORS.BOND TO GROUND ALPHA -SEE DETAIL 5 ON SHEET 0-2 <br /> RING WITH 7.SOLID TINNED COPPER CONDUITS / 125' <br /> (ATT-TP-76416 7.6.7). <br /> HATCH PLATE GROUND BAR:BOND TO THE INTERIOR <br /> GROUND RING WITH(2)#2 STRANDED GREEN INSULATED ISSUED FOR: <br /> COPPER CONDUCTORS.WHEN A HATCH-PLATE AND A CELL i <br /> REFERENCE GROUND BAR ARE BOTH PRESENT,THE CELL A3 REVIEW 01/04/22 <br /> SITE REFERENCE GROUND BAR MUST BE CONNECTED TO <br /> • <br /> THE HATCH-PLATE AND TO THE INTERIOR GROUND RING PERMIT - <br /> USING(2)#2 STRANDED GREEN INSULATED COPPER <br /> CONDUCTORS. <br /> CONSTRUCTION - <br /> EXTERIOR CABLE ENTRY PORT GROUND BARS:LOCATED <br /> RECORD <br /> AT THE ENTRANCE TO THE CELL SITE BUILDING.BOND TO <br /> GROUND RING WITH A#2 SOLID TINNED COPPER (PROJECT MANAGER DESIGNER <br /> CONDUCTORS WITH AN EXOTHERMIC WELD AND <br /> INSPECTION SLEEVE(ATT-TP-76418 7.6.7.2). CB ORB <br /> DURING ALL DC POWER SYSTEM CHANGES INCLUDING DC <br /> SYSTEM CHANGE OUTS,RECTIFIER REPLACEMENTS OR <br /> ADDITIONS.BREAKER DISTRIBUTION CHANGES.BATTERY GPD JOB NO. <br /> ADDITIONS.BATTERY REPLACEMENTS AND INSTALLATIONS 2021723.06.44617.01 <br /> OR CHANGES TO DC CONVERTER SYSTEMS IT SHALL BE f IE,, <br /> REQUIRED THAT SERVICES CONTRACTORS VERIFY ALL DC <br /> POWER SYSTEMS ARE EQUIPPED WITH MASTER DC ANTENNA GROUNDING DIAGRAM = <br /> SYSTEM RETURN GROUND CONDUCTOR FROM THE DC Cl ) <br /> POWER SYSTEM COMMON RETURN BUS DIRECTLY SCALE: NOT TO SCALE <br /> o <br /> CONNECTED TO THE CELL SITE REFERENCE GROUND BAR <br /> PER TP76300 SECTION H 8 AND TP7641B FIGURE 7.11 Z <br /> REQUIREMENTS. <br />