Laserfiche WebLink
voI1a <br /> 600A SWITCHBOARD PANEL P1 <br /> PROJECT NAME: Safeway#1484 PROJECT#: 22097 PROJECT NAME: Safeway#1484 PROJECT#: 22097 <br /> LOCATION: FED FROM: UTILITY LOCATION: SWITCHGEAR YARD FED FROM: MAIN SERVICE PANEL VIA XFMR <br /> NOTE CKT CIRCUIT NAME CB SIZE LOAD(KVA) NOTE CKT CIRCUIT NAME CB SIZE LOAD(KVA) <br /> NO. 0 AMP P R H M L EV 0 TOTAL PANEL DESCRIPTION NO. 0 AMP P R H M L EV 0 TOTAL PANEL DESCRIPTION <br /> 1 DC FAST STATION#1 A 300 3 60.00 60.00 PANEL AMPS : 600 1 REC-CHARGING AREA A 20 1 0.18 0.18 PANEL AMPS : 100 <br /> B - - 60.00 60.00 FEEDER AMPS : 600 3 LTS-CHARGING AREA B 20 1 0.35 0.35 FEEDER AMPS : 100 <br /> - C - - 60.00 60.00 L-L VOLTS : 480 5 VOLTA TV MONITOR C 20 1 1.20 1.20 L-L VOLTS : 208 <br /> 2 DC FAST STATION#2 A 300 3 60.00 60.00 L-N VOLTS : 277 7 VOLTA TV MONITOR A 20 1 1.20 1.20 L-N VOLTS : 120 <br /> - B - - 60.00 60.00 PHASE : 3 9 SPARE B 20 1 PHASE : 3 <br /> - C - - 60.00 60.00 WIRE : 4 11 SPARE C 20 1 WIRE : 4 <br /> 3 SPACE ONLY A - 3 AIC : 651 A AIC : 101 A <br /> - B - - <br /> C - <br /> 4 208Y/120V PANEL P1 A 50 3 0.18 1.20 1.38 M.L.O. M.L.O.- <br /> - B - - 0.35 0.35 MAIN CB X 600A MAIN CB X 100A <br /> - C - - 1.20 1.20 FLUSH FLUSH_ <br /> ` 5 SPACE ONLY A - 3 SURFACE X SURFACE X <br /> - B - - ISO GND - <br /> _ - C - - FEED-THRU FEED-THRU ISO GND_ LDC I E,e nee <br /> 6 SPACE ONLY A - 3 - ` Planning <br /> Bb <br /> - <br /> 7 SPACE ONLY A - 3 LOAD SUMMARY <br /> - B - - (TOTAL,ALL SECTIONS) LOAD SUMMARY <br /> C (TOTAL.ALL SECTIONS) <br /> 8 SPACE ONLY A - 3 REC KVA : 0.2 2 SPARE A 20 1 REC KVA : 0.18 <br /> - B - - HEAT KVA : <br /> C - - MOTOR KVA : 4 SPARE B 20 1 HEAT KVA : <br /> - <br /> 6 SPARE C 20 1 MOTOR KVA : 882B REGISTERED <br /> 9 SPACE ONLY A - 3 LIGHTING KVA : 0.4 ARCHITECT <br /> B - - EV KVA : 360.0 8 SPACE ONLY A LIGHTING KVA : 0.35 <br /> C - - OTHER KVA : 2.4 10 SPACE ONLY B EV KVA : <br /> 10 S-PACE ONLY A - 3 12 SPACE ONLY C OTHER KVA : 2.40 RICTE HAROFWASHIN GT <br /> IAONLI� <br /> STA <br /> - B - - PHASE A KVA : 121.4 E,I IRti e-zru ,eN <br /> - C - - AMPS : 438.2 PHASE A KVA : 1.38 <br /> 11 SPACE ONLY A - 3 PHASE B KVA : 120.4 AMPS : 11.5 <br /> - B - - AMPS : 434.5 PHASE B KVA : 0.35 JOB IJF,E <br /> - C - - PHASE C KVA : 121.2 AMPS : 2.9 SAFEWAY#1484 <br /> 12 SPACE ONLY A - 3 AMPS : 437.5 <br /> PHASE C KVA: 1.20 4128 RUCKER AVE, <br /> AMPS : 10.0 EVERETT,WA 98203 <br /> - B <br /> - C - - <br /> 13 SPACE ONLY A - 3 CONNECTED LOAD , <br /> - B - - KVA : 362.9 CONNECTED LOAD <br /> • <br /> - C - - AMPS : 436.5 KVA : 2.93 TITLE <br /> 14 SPACE ONLY A - 3 DEMAND LOAD AMPS : 8.1 PANEL SCHEDULE <br /> - B - - KVA : 453.0 DEMAND LOAD <br /> - C - - AMPS : 544.9 KVA : 3.02 <br /> NOTES/REMARKS: DEMAND/DIVERSITY FACTORS AMPS : 8.4 <br /> 1. LOAD DESCRIPTION DEMAND NOTES/REMARKS: DEMAND/DIVERSITY FACTORS <br /> 2. R RECEPTACLES-TO10KVA 100% = 0.2 1. LOAD DESCRIPTION DEMAND <br /> 3. REMAINING OVER 10KVA 50% = 2. R RECEPTACLES-TO 10KVA 100% = 0.18 <br /> H HEATING 100% = 3. REMAINING OVER 10KVA 50% = <br /> PROVIDE NEMA 3R ENCLOSURE M MOTORS 100% = H HEATING 100% = <br /> LM LARGEST MOTOR 125% = PROVIDE NEMA 3R ENCLOSURE M MOTORS 100% = <br /> L LIGHTING 125% = 0.4 LM LARGEST MOTOR 125% = <br /> 3 4-N-22 $81(CD100) <br /> EV ELECTRIC VEHICLE CHARGING 125% = 450.00 L LIGHTING 125% = 0.44 <br /> 2 3-15-2 REVISED IC0501 <br /> 0 OTHER 100% = 2.4 EV ELECTRIC VEHICLE CHARGING 125% = 1 12-7-21 PRELIMINARY[COS)) <br /> 0 OTHER 100% = 2.40 REV DATE DESCRIPTION <br /> DRAWN BY: PPK <br /> CHECKED BY: RBH <br /> PANEL SCHEDULE E-2 1 <br /> E-2.1 SCALE:N.T.S. <br />