Laserfiche WebLink
r <br /> GENERAL CONSTRUCTION NOTES ELECTRICAL NOTES GENERAL SITE NOTES <br /> _ 1. THE ELECTRICAL CONTRACTOR SHALL SUPPLY AND INSTALL ANY/ALL ELECTRICAL WORK INDICATED.ANY/ALL CONSTRUCTION PART 1-GENERAL <br /> 1. ALL SITE WORK SHALL BE COMPLETED AS INDICATED ON THE DRAWINGS. SHALL BE IN ACCORDANCE WITH DRAWINGS AND ANY/ALL APPLICABLE SPECIFICATIONS.IF ANY PROBLEMS ARE ENCOUNTERED <br /> BY COMPLYING WITH THESE REQUIREMENTS,CONTRACTOR SHALL NOTIFY'CONSTRUCTION MANAGER'AS SOON AS POSSIBLE, CLEARING,GRUBBING,STRIP PI NG,EROSION CONTROL,SURVEY,LAYOUT,SUBGRADE PREPARATION AND FINISH GRADING <br /> 2. THE GENERAL CONTRACTOR SHALL VISIT THE SITE AND SHALL FAMILIARIZE THEMSELVES WITH ALL CONDITIONS AFFECTING AFTER THE DISCOVERY OF THE PROBLEMS,AND SHALL NOT PROCEED WITH THAT PORTION OF WORK,UNTIL THE AS REQUIRED TO COMPLETE THE PROPOSED WORK SHOWN IN THESE PLANS. <br /> THE PROPOSED WORK AND SHALL MAKE PROVISIONS.GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING 'CONSTRUCTION MANAGER HAS DIRECTED THE CORRECTIVE ACTIONS TO BE TAKEN. 1.REFERENCES: V <br /> ` /O I <br /> THEMSELVES WITH ALL CONTRACT DOCUMENTS,FIELD CONDITIONS,DIMENSIONS,AND CONFIRMING THAT THE WORK MAY BE <br /> ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING WITH CONSTRUCTION.ANY DISCREPANCIES SHALL BE BROUGHT TO THE 2. THE ELECTRICAL CONTRACTOR SHALL VISIT THE JOB SITE AND FAMILIARIZE THEMSELVES WITH ANY/ALLCONDWONS A.LOCAL DOT TRANPORTATION STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION(CURRENT EDITION) <br /> ta <br /> ATTENTION OF THE ENGINEER PRIOR TO THE COMMENCEMENT OF WORK AFFECTING ELECTRICAL AND COMMUNICATION INSTALLATION AND MAKE PROVISIONS AS TO THE COST THEREOF.THE <br /> CONDITION OF EXISTING ELECTRICAL EQUIP.,LIGHT FIXTURES,ETC.,THAT ARE PART OF THE FINAL SYSTEM,SHALL BE VERIFIED B.ASTM(AMERICAN SOCIETY FOR TESTING AND MATERIALS). <br /> 3. ALL MATERIALS FURNISHED AND INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPUCARJ E CODES,REGULATIONS, BY THE CONTRACTOR,PRIOR TO THE SUBMITTAL OF HIS BID.FAILURE TO COMPLY WffH THIS PARAGRAPH WILL IN NO WAY <br /> AND ORDINANCES.GENERAL CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOTICES AND COMPLY WITH ALL LAWS, RELIEVE CONTRACTOR OF PERFORMING ALL WORK NECESSARY FOR A COMPLETE AND WORKING SYSTEM a ALLWORK SHALL C.OSHA(OCCUPATION SAFETY AND HEALTH ADMINISTRATION). <br /> ORDINANCES,RULES,REGULATIONS,AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY REGARDING THE PERFORMANCE OF BE PERFORMED IN ACCORDANCE WITH THE LATEST EDITION OF THE NEC AND ALL CODES AND LOCAL ORDINANCES OF THE <br /> LOCAL POWER COMPANIES HAVING JURISDICTION AND SHALL INCLUDE BUT NOT BE UMITED TO: 2.INSPECTION AND TESTING: <br /> WORK. A.GENERAL CONTRACTOR SHALL PERFORM ALL WORK IN CONFORMANCE WITH THE PLANS AND SPECIFICATIONS. <br /> 4. ALL WORK CARRIED OUT SHALL COMPLY WITH ALLAPPLICAPJ E MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS AND LOCAL A.UL-UNDERWRITERS LABORATORIES PERFORM INSPECTIONS BEFORE CONCEALING WORK WITH FOLLOW-ON ACTIVITIES(BACKFILL,CONCRETE POUR, - - <br /> JURISDICTIONAL CODES,ORDINANCES,AND APPLICABLE REGULATIONS. B.NEC-NATIONAL ELECTRICAL CODE ETC). <br /> C.NEMA-NATIONAL ELECTRICAL MANUFACTURERS ASSOC. <br /> 5. UNI FRS NOTED OTHERWISE,THE WORK SHALL INCLUDE FURNISHING MATERIALS,EQUIPMENT,APPURTENANCES,AND LABOR D.OSHA-OCCUPATIONAL SAFETY AND HEALTH ACT 3.SITE MAINTENANCE AND PROTECTION: <br /> NECESSARY TO COMPLETE ALL INSTALLATIONS AS INDICATED ON THE DRAWINGS. E SBC-STANDARD BUILDING CODE A.PROVIDE ALL NECESSARY JOB SITE MAINTENANCE FROM COMMENCEMENT OF WORK UNTIL COMPLETION OF THE <br /> F.NFPA-NATIONAL FIRE PROTECTION ASSOCIATION CONTRACT. <br /> 6. PLANS ARE NOT TO BE Sr.41 FD.THESE PLANS ARE INTENDED TO BEADIAGRAMMATIC OUTLINE ONLY UNLESS OTHERWISE 4. DO NOT SfAI F ELECTRICAL DRAWINGS,REFER TO SITE PLANS AND ELEVATIONS FOR EXACT LOCATIONS OF ALL EQUIPMENT, B.AVOID DAMAGE TO THE SITE AND TO EXISTING FACILITIES,STRUCTURES,TREES,AND SHRUBS DESIGNATED TO <br /> NOTED.DIMENSIONS SHOWN ARE TO FINISH SURFACES UNLESS OTHERWISE NOTED.SPACINGIONS,SBETWEEN EQUIPMENT IS THE BUT CONFIRM WITH'CONSTRUCTION MANAGER'ANY SIZES AND LOCATIONS WHEN NEEDED. REMAIN.TAKE PROTECTIVE MEASURES TO PREVENT EXISTING FACILITIES THAT ARE NOT DESIGNATED FOR <br /> MINIMUM REQUIRED CLEARANCE.THEREFORE,IT IS CRITICAL TO FIELD VERIFY DIMENSIONS,SHOULD THERE BE ANY REMOVAL FROM BEING DAMAGED BY THE WORK. <br /> QUESTIONS REGARDING THE CONTRACT DOCUMENTS,THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A 5. EXISTING SERVICES:THE CONTRACTOR SHALL NOT INTERRUPT EXISTING SERVICES WITHOUT WRITTEN PERMISSION OF THE <br /> CLARIFICATION FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK DETAILS ARE INTENDED TO SHOW DESIGN OWNER. C.KEEP SITE FREE OF ALL PONDING WATER. <br /> INTENT.MODIFICATIONS MAY BE REQUIRED TO SUIT JOB DIMENSIONS OR CONDITIONS AND SUCH MODIFICATIONS SHALL BE <br /> INCLUDED AS PART OF WORK AND PREPARED BY THE ENGINEER PRIOR TO PROCEEDING WITH WORK 6. THE CONTRACTOR SHALL PAY FOR ANY/ALL PERMITS,FEES,INSPECTIONS AND TESTING.THE CONTRACTOR IS TO OBTAIN D.PROVIDE EROSION CONTROL MEASURES IN ACCORDANCE WITH STATE DOT,LOCAL PERMITTING AGENCY AND EPA <br /> 7. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURERS PERMITS AND APPROVED SUBMITTALS PRIOR TO THE WORKBEGINNING OR ORDERING THE EQUIPMENT. REQUIREMENTS. <br /> RECOMMENDATIONS UNLESS SPECIFICALLY STATED OTHERWISE 7. THE TERM"PROVIDE USED IN CONSTRUCTION DOCUMENTS AND SPECIFICATIONS.INDICATES THAT THE CONTRACTOR SHALL E.PROVIDE AND MAINTAIN ALL TEMPORARY FENCING,BARRICADES,WARNING SIGNALS AND SIMILAR DEVICES <br /> 8. IF THE SPECIFIED EQUIPMENT CANNOT BE INSTALLED AS SHOWN ON THESE DRAWINGS,THE CONTRACTOR SHALL PROPOSE FURNISH AND INSTALL NECESSARY TO PROTECT AGAINST THEFT FROM PROPERTY DURING THE ENTIRE PERIOD OF CONSTRUCTION. <br /> REMOVE ALL SUCH DEVICES UPON COMPLETION OF THE WORK. <br /> AN ALTERNATIVE INSTALLATION SPACE FOR APPROVAL BY THE ENGINEER PRIOR TO PROCEEDING. <br /> 8. THE CONTRACTOR SHALL CONFIRM WITH LOCAL UTILITY COMPANY ANY/ALL REQUIREMENTS SUCH AS THE LUG SIZE <br /> 9. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF WORK AREA,ADJACENT AREAS AND BUILDING RESTRICTIONS,CONDUIT ENTRY,SIZE OF TRANSFORMERS,SCHEDULED DOWNTIME FOR THE OWNERS'CONFIRMATION,ETC. F.EXISTING UTILITI ES:DO NOT INTERRUPT EXISTING UTILITIES SERVING FACILITIES OCCUPIED BY THE OWNER OR <br /> OCCUPANTS THAT LIKELY TO BE AFFECTED BY THE WORK UNDER THIS CONTRACT.WORK SHALL CONFORM TOALLOSHA ANY/ALL CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE CONSTRUCTION MANAGER PRIOR TO BEGINNING ANY OTHERS,EXCEPT WHEN PERMITTED IN WRITING BY THE CONSTRUCTION MANAGER AND THEN ONLY AFTER <br /> REQUIREMENTS AND THE LOCAL JURISDICTION. WORK. ACCEPTABLE TEMPORARY UTILITY SERVICES HAVE BEEN PROVIDED. <br /> 10. THE GENERAL CONTRACTOR SHALL COORDINATE WORK AND SCHEDULE WORK ACTIVITIES WITH OTHER DISCIPLINES. 9. CONDUCTORS:CONTRACTOR SHALL USE 98%CONDUCTIVITY COPPER OR ALUMINUM WITH TYPE(THWN-2)INSULATION,600 G.PROVIDE A MINIMUM 48-HOUR NOTICE TO THE CONSTRUCTION MANAGER AND RECEIVE WRITTEN NOTICE TO ,,...eying <br /> VOLT,COLOR CODED UNLESS SPECIFIED DIFFERENTLY ON DRAWINGS. PROCEED BEFORE INTERRUPTING ANY UTILITY SERVICE. L DC Engineering <br /> Planning <br /> 11. CONSTRUCTION SHALL BE DONE IN A WORKMANUKE MANNER BY COMPETENT EXPERIENCED WORKMAN IN ACCORDANCE WITH 10. ALL(THWN-2)WIRING INSTALLATIONS TO FOLLOW MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. H.SOD PLANTED IN THE FALL MUST ESTABLISH ITS ROOTS BEFORE THE FIRST WINTER FROST.DETERMINE WHEN THE <br /> APPLY-AN E CODES AND THE BEST ACCEPTED PRACTICE. FIRST FROST USUALLY OCCURS,AND PLANT THE SOD NO LATER THAN ONE MONTH BEFORE THE FIRST FROST.IF „t <br /> wnssoso <br /> 12. WORK PREVIOUSLY COMPLETED IS REPRESENTED BY LIGHT SHADED LINES AND NOTES.THE SCOPE OF WORK FOR THIS 11. OUTLET BOXES SHALL BE PRESSED STEEL IN DRY LOCATIONS,CASTALLOYWITH THREADED HUBS IN WET/DAMP LOCATIONS THE CONSTRUCTION IS FINISHED LATER THAN ONE MONTH BEFORE THE FIRST FROST,USE STRAW UNTIL SOD CAN ,„,.a. ..„ ..,ec..v. „a <br /> PROJECT IS REPRESENTED BY DARK SHADED UNES AND NOTES.CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR OF AND SPECIAL ENCLOSURES FOR OTHER CI o.SAIFlEDAREAS. BE INSTALLED. <br /> ANY EXISTING CONDITIONS THAT DEVIATE FROM THE DRAWINGS PRIOR TO BEGINNING CONSTRUCTION. 12. IT IS NOT THE INTENT OF THESE PLANS TO SHOW EVERY MINOR DETAIL OF THE CONSTRUCTION.CONTRACTOR IS EXPECTED PART 2-PRODUCTS <br /> 13. THE CONTRACTOR SHALL PROVIDE WRITTEN NOTICE TO THE CONSTRUCTION MANAGER 48 HOURS PRIOR TO COMMENCEMENT TO FURNISH AND INSTALL ALL ITEMS FOR A COMPLETE ELECTRICAL SYSTEM AND PROVIDE ALL REQUIREMENTS FOR THE <br /> EQUIPMENT TO BE PLACED IN PROPER WORKING ORDER.CONTRACTOR IS TO PROVIDE ALL ELECTRICAL EQUIPMENT UNLESS 1. SUITABLE MATERIAL-SUITABLE MATERIAL ARE TO BE USED FOR GRADING AND BACKFILL SUITABLE MATERIALS ARE <br /> OF WORK OTHERWISE DIRECTED. ON SITE SOILS REMOVED FROM EXCAVATIONS THAT EXCLUDE FROZEN SOIL,ROOTS OR ORGANIC MATERIAL,DEBRIS, <br /> 14. THE CONTRACTOR SHALL PROTECT BUSTING IMPROVEMENTS,PAVEMENTS,CURBS,LANDSCAPING AND STRUCTURES.ANY TRASH,REFUSE,OR PARTICLES SIZE GREATER THAN 3-INCH.SUITABLE SOILS HAVE MOISTURE CONTENTS THAT <br /> DAMAGED PART SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE OWNER 13. ALL WORKSHALL BE PERFORMED BY A LICENSED ELECTRICAL CONTRACTOR IN A FIRST CLASS,WORKMANLIKE MANNER THE ALLOW THEM TO BE COMPACTED TO THE SAME DENSITY AS THE NATIVE SOILS. <br /> COMPLETED SYSTEM SHALL BE FULLY OPERATIONAL AND SUBJECT TO REGULATORY INSPECTION AND APPROVAL BY <br /> 15. THE CONTRACTOR SHALL CONTACT UTILITY LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. CONSTRUCTION MANAGER 2. UNSUITABLE MATERIAL-SOILS THAT ARE FROZEN,CONTAIN ROOTS OR ORGANIC MATERIAL DEBRIS,TRASH. 6828 REGISTERED <br /> REFUSE,OR PARTICLES SIZES GREATER THAN 3-INCH.SOILS THAT ARE TOO WET OR TOO DRY TO BE COMPACTED TO ARCHITECT <br /> TB. THE GENERAL CONTRACTOR SHALL COORDINATE AND MAINTAIN ACCESS FOR ALL TRADES AND CONTRACTORS TO THE SITE 14. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID INTERFERENCE WITH THE PROGRESS OF CONSTRUCTION. THE SAME DENSITY AS THE NATIVE SOILS ARE UNSUITABLE. • <br /> AND/OR BUILDING. 15. CONTRACTOR SHALL GUARANTEE ANY/ALL MATERIALS AND WORK FREE FROM DEFECTS FOR A PERIOD OF NOT LESS THAN 3. GRANULAR BACKFILL-SHALL MEET THE FOLLOWING GRADATION <br /> ONE YEAR FROM DATE OF ACCEPTANCE. RIC HAR . ALA <br /> 17. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SECURITY OF THE SITE FOR THE DURATION OF CONSTRUCTION STATE OF WASHINGTON <br /> UNTIL JOB COMPLETION. I!� <br /> 16. THE CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ANY ADDMONAL CHARGE AND SHALL INCLUDE THE SIEVE SIZE TOTAL PERCENT PASSING EXPIRES:8-20-23 K- <br /> 18. THE GENERAL CONTRACTOR SHALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SET OF PLANS WITH ALL REVISIONS, REPLACEMENT OR THE REPAIR OF ANY OTHER PHASE OF THE INSTALLATION,WHICH MAY HAVE BEEN DAMAGED THEREIN. 11/2 INCH(37.5 MM) 100 <br /> ADDENDA,AND CHANGE ORDERS ON THE PREMISES AT ALL TIMES. 17. ADEQUATE AND REQUIRED LIABILITY INSURANCE SHALL BE PROVIDED FOR PROTECTION AGAINST PUBLIC LOSS AND ANY/ALL NO.4(4.75 MM) 30 TO 60 <br /> 19. THE CONTRACTOR SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS WITH A RATING OF NOT LESS THAN 2-A:10-B:C AND SHALL PROPERTY DAMAGE FOR THE DURATION OF WORK NO 200(0.075 MM) 3 TO 15 l08 NAME <br /> BE WITHIN 25 FEET OF TRAVEL DISTANCE TO ALL PORTIONS OF WHERE THE WOW IS BEING COMPLETED DURING 18. PROVIDE AND INSTALL CONDUIT,CONDUCTORS,PULL WIRES,BOXES,COVER PLATES AND DEVICES FOR ALL OUTLETS AS SAFEWAY#1484 <br /> CONSTRUCTION. INDICATED. 4128 RUCKER AVE, <br /> 20. ALL EGSTING ACTNE SEWER,WATER,GAS,ELECTRIC,AND OTHER UTILITIES SHALL BE PROTEC TED AT ALL TIMES,AND WHERE 19. TRENCHING AND BACKFlLL:THE CONTRACTOR SHALL PROVIDE FOR ALL UNDERGROUND INSTALLED CONDUIT AND/ORCABLES 4. GRANULAR BEDDING-WELL-,RADEDSAND MEETING THE GRADATION REQUIREMENT OF ASTM C 33 FINE <br /> EVEREfT,WA98203 <br /> REQUIRED FOR THE PROPER EXECUTION OF THE WORK SHALL BE RELOCATED AS DIRECTED BY THE ENGINEER EXTREME INCLUDING EXCAVATION AND BACKFILLING AND COMPACTION.REFER TO GENERAL SITE WORK NOTES. AGGREGATE. <br /> CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING OR DRILLING PIERS AROUND OR NEAR UTILITIES.THE <br /> CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE WORKING CREW.THIS SHALL INCLUDE BUT NOT BE LIMITED TO A) 20. MATERIALS,PRODUCTS AND EQUIPMENT,INCLUDING ALL COMPONENTS THEREOF,SHALL BE NEW AND SHALL APPEAR ON THE 5. CONTROLLED LOW STRENGTH MATERIAL(CLSM)-A SELF LEVEUNG AND SELF COMPACTING CEMENTITIOUS MATERIAL <br /> FALL PROTECTION,B)CONFINED SPACE,C)ELECTRICAL SAFETY,AND 0)TRENCHING BIXCAVATION. LIST OF U.L APPROVED ITEMS AND SHALL MEET OR EXCEED THE REQUIREMENTS OF THE NEC,NEMA AND IEEE COMPOSED OF SAND,COARSE AGGREGATE,CEMENT,FLY ASH,WATER AND ADMIXTURES.CLSM SHALL BE <br /> 22 ALL EXISTING INACTIVE SEWER WATER,GAS,ELECTRIC,AND OTHER UTILITIES,WHICH INTERFERE WITH THE EXECUTION OF EXCAVATABLE AND SHALL HAVE A DESIGNED UNCONFINED COMPRESSIVE STRENGTH OF BETWEEN 50 TO 100 PSI. <br /> THE WORK SHALL BE REMOVED,CAPPED,PLUGGED OR OTHERWISE DISCONNECTED AT POINTS WHICH WILL NOT INTERFERE 21. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OR MANUFACTURES CATALOG INFORMATION OF ANY/ALL LIGHTING FIXTURES, SHEET TELE <br /> WITH THE EXECUTION OF THE WORK AS DIRECTED BY THE ENGINEER,AND SUBJECT TO THE APPROVAL OF THE OWNER SWITCHES AND ALL OTHER ELECTRICAL ITEMS FOR APPROVAL BY THE CONSTRUCTION MANAGER PRIOR TO INSTALLATION. 6. BACKFILL-PRODUCTS MEETING THE REQUIREMENTS OF SUITABLE MATERIAL,GRANULAR BEDDING,GRANULAR GENERAL NOTES <br /> AND/OR LOCAL UTILITIES. BACKFILL OR CLSM. <br /> 22. AM'CUTTING OR PATCHING DEEMED NECESSARY FOR ELECTRICAL WORK IS THE ELECTRICAL CONTRACTORS RESPONSIBILITY <br /> 23. THEAREAS OF THE OWNER'S PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE EQUIPMENT OR DRIVEWAY, AND SHALL BE INCLUDED IN THE COST FOR WORK AND PERFORMED TO THE SATISFACTION OF THE'CONSTRUCTION MANAGER' 7. TOPSOIL-SOIL WITH AN ORGANIC CONTENT SUFFICIENT TO ALLOW VEGETATIVE GROWTH. <br /> SHALL BE GRADED TO A UNIFORM SLOPE,AND STABILIZED TO PREVENT EROSION. UPON FINAL ACCEPTANCE. <br /> 24. CONTRACTOR SHALL MINIMIZE DISTURBANCE TO THE EXISTING SITE DURING CONSTRUCTION.EROSION CONTROL MEASURES, 23• THE ELECTRICAL CONTRACTOR SHALL LABEL ALL PANELS WITH ONLY TYPEWRITTEN DIRECTORIES. <br /> IF REQUIRED DURING CONSTRUCTION,SHALL BE IN CONFORMANCE WITH THE FEDERAL AND LOCAL JURISDICTION FOR 24. DISCONNECT SWITCHES SHALL BE H.P.RATED HEAVY-DUTY,QUICK-MAKE AND QUICK-BREAK ENCLOSURES,AS REQUIRED BY <br /> EROSION AND SEDIMENT CONTROL. EXPOSURE TYPE. <br /> 25. NO FILL OR EMBANKMENT MATERIAL SHALL BE PLACED ON FROZEN GROUND.FROZEN MATERIALS,SNOW OR ICE SHALL NOT BE 25. ALL CONNECTIONS EXCEPT THE EV CHARGE CABLE TERMINATION IN THE CHARGE POST SHALL BE MADE WITH A PROTECTIVE <br /> PLACED IN ANY FILL OR EMBANKMENT. COATING OF AN ANTI-OXIDE COMPOUND SUCH AS"NOALOX"BY IDEAL INDUSTRIAL INC.,COAT ALL WIRE SURFACES BEFORE <br /> 26. THE SUBGRADE SHALL BE BROUGHT TO ASMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT STANDARD PROCTOR CONNECTING.EXPOSED ALUMINUM&COPPER SURFACES,INCLUDING GROUND BARS,SHALL RETREATED-NO <br /> DENSITY UNDER PAVEMENT AND STRUCTURES AND 80 PERCENT STANDARD PROCTOR DENSITY IN OPEN SPACE ALL SUBSTITUTIONS. <br /> TRENCHES IN PUBLIC RIGHT OF WAY SHALL BE BACKFILLED WITH FLOWABLE FILL OR OTHER MATERIAL PRO-APPROVED BY THE 26. ALL EXTERIOR AND INTERIOR ABOVE GROUND CONDUIT SHALL BE RIGID UNLESS SPECIFIED OTHERWISE ALL BURIED S 4-6r22 SAS(CDI00) <br /> LOCAL JURISDICTION. CONDUITS SHALL BE SCH 40 PVC UNLESS SPECIFIED OTHERWISE <br /> 2 3-15-22 REVISED(CD50) <br /> 27. ALL NECESSARY RUBBISH,STUMPS,DEBRIS,STICKS,STONES,AND OTHER REFUSE SHALL BE REMOVED FROM THE SITE AND 27. RACEWAYS:CONDUIT SHALL BE SCHEDULE 40 PVC,MEETING OR EXCEEDING NEMA TC2-1990.THE CONTRACTOR SHALL PLUG I 12-2-21 PRELIMINARY(CD50) <br /> DISPOSED OF IN A LAWFUL MANNER AND CAP EACH END OF SPARE AND EMPTY CONDUITS AND PROVIDE TWO SEPARATE PULL STRINGS-200 LBS TEST REV DATE DESCRIPTION <br /> 28. ALL BROCHURES,OPERATING AND MAINTENANCE MANUALS,CATALOGS,SHOP DRAWINGS,AND OTHER DOCUMENTS SHALL BE POLYETHYLENE CORD.ALL CONDUIT BENDS SHALL BE A MINIMUM OF 3 FT.RADIUS.RGS CONDUITS WHEN SPECIFIED,SHALL <br /> TURNED OVER TO THE GENERAL CONTRACTOR AT COMPLETION OF CONSTRUCTION AND PRIOR TO PAYMENT. MEET UL-6 FOR GALVANIZED STEEL ALL FITTINGS SHALL BE SUITABLE FOR USE WITH THREADED RIGID CONDUIT.COAT ALL <br /> THREADS WITH'BRITE ZINC OR'GOLD GALE. <br /> 29. THE CONTRACTOR SHALL SUBMITA COMPLETE SET OF AS-BUILT REDLINES TO THE GENERAL CONTRACTOR UPON 28. SUPPORT OF ALL ELECTRICAL WORK SHALL BE AS REQUIRED BY NEC. <br /> COMPLETION OF PROJECT AND PRIOR TO FINAL PAYMENT. <br /> 30. THE CONTRACTOR SHALL LEAVE PREMISES IN A CLEAN CONDITION.31.THE PROPOSED FACILITY WILL BE UNMANNED AND 29. CONNECTORS FOR POWER CONDUCTORS:CONTRACTOR SHALL USE PRESSURE TYPE INSULATED TWIST-ON CONNECTORS <br /> DOES NOT REQUIRE POTABLE WATER OR SEWER SERVICE,AND IS NOT FOR HUMAN HABITATION(NO HANDICAP ACCESS FOR NO.10 AND SMALLER.USE SOLDERLESS MECHANICAL TERMINAL LUGS FOR NO.BAWG AND LARGER CITY <br /> !v' DRAWN BY: OPT <br /> REQUIRED). 30. THE CONTRACTOR SHALL PLACE WARNING TAPE AT A DEPTH OF IS BELOW GROUND AND DIRECTLY ABOVE ELECTRICAL CHECKED BY: RBH <br /> t 32. NO OUTDOOR STORAGE OR SOLID WASTE CONTAINERS ARE PROPOSED. SERVICE CONDUITS.CAUTION TAPE TO READ"CA11T1ON BURIED ELECTRIC". R E ti/'C 1-,OD O ER �� <br /> 33, CONTRACTORS SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND INSPECTIONS REQUIRED FOR CONSTRUCTION,IF 31. WHEN DIRECTIONAL BORING IS REQUIRED,CONTRACTOR SHALL INSTALL A LOOSE TONING WIRE WITHIN INSTALLED CONDUIT V L v v R <br /> CONTRACTOR CANNOT OBTAIN A PERMIT,THEY MUST NOTIFY THE GENERAL CONTRACTOR IMMEDIATELY, TO ALLOW FOR IDENTIFICATION OF UNDERGROUND CONDUITS. FER M 1 r <br /> 0 <br /> 34. THE CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE SITE ON A DAILY BASIS. 32. ALL BOLTED CONNECTIONS,UNO.SHALL BE STAINLESS STEEL. <br /> ./ <br /> 35. INFORMATION SHOWN ON THESE DRAWINGS WAS OBTAINED FROM SITE VISITS AND/OR DRAWINGS PROVIDED BY THE SITE .ALL MATERIALS AND EQUIPMENT SUPPLIED AND INSTAL I FO BY THE CONTRACTOR SHALL BE NEW AND UNUSED. <br /> OWNER.CONTRACTORS SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR TO ORDERING MATERIAL OR <br /> PROCEEDING WITH CONSTRUCTION. <br />