Laserfiche WebLink
NOTES: <br /> 1. CONTRACTOR TO VERIFY POST INSTALLATION OR CAST IN PLACE ANCHOR AS LISTED r D , �---- <br /> BELOW BASED ON FIELD MEASUREMENTS AND JURISDICTIONAL REQUIREMENTS. n <br /> 2. CONTRACTOR TO VERIFY EXISTING CONCRETE SLAB THICKNESS AND MAINTAIN 2" // <br /> MINIMUM COVER OF CONCRETE BELOW EMBEDDED ANCHORS. 0 ' \ /O I <br /> 3. CAST IN PLACE ANCHOR:MINIMUM EFFECTIVE EMBEDMENT OF 2"OR ENGINEER / V <br /> ta <br /> APPROVED EQUAL. <br /> 4. POST INSTALLATION MECHANICAL ANCHOR:(5)1/2"DIAMETER HILTI KWIK BOLT TZ-SS304 <br /> ANCHOR ROD WITH MINIMUM EFFECTIVE EMBEDMENT OF 3-1/4"OR ENGINEERING <br /> APPROVED EQUAL. / <br /> 5. ANY NEW CONCRETE NEEDED FOR THE CONSTRUCTION SHALL BE AIR-ENTRAINED AND <br /> I--"-0 l//SHALL HAVE 3000 PSI STRENGTH AT 28 DAYS. <br /> 23.75" 2.88" �`_ D <br /> 1.75" D <br /> ei <br /> i 3.50" <br /> (5).75'X 1.63"SLOTS <br /> 5"X 5"CUTOUT <br /> R1.25" ISOMETRIC VIEW <br /> DC Fast Media Station LIla CHARGING STATION FOOTPRINT <br /> N. 91.24" <br /> Volta Charging is driving the transition to _ _,.. p 4'-0" �'1' i <br /> clean electric transportation by transforming 1'-2' _ 10.30" I1 i IAI <br /> properties with electric vehicle charging. if" <br /> 1 i 7.az° Lo <br /> N zas9° <br /> No longer will people drive to fuel,but fuel " F� PROPOSED CHARGING M s <br /> EO (V STATION FOOTPRINT - 1 1 1 _ _ ,v.ring <br /> where they drive. N iv \ _ DC <br /> I Engmeeging <br /> .: .--t'-''- <br /> screern c`+ PROPOSED CHARGING I Plannm <br /> N STATION CONCRETE SLAB m I I I. O <br /> F , _ ¢i <br /> Volta's turn-key electric vehicle charging is °S0`- , ' , Dos 1 ;u„•„ �,�-,.� °,,,,,a„ <br /> tailored to each location's needs and desired 1 o T0 <br /> customer experience to increase traffic and o ��" c. n•� �� <br /> 10.Deal°W ah 1 <br /> customer engagement.Our fully integrated / cede management • <br /> EV chargers include high-impact digital " N 16.7a" 7.3r' z3.9r' r ` • <br /> media screens that provide properties with , , 1 41.00" i �� <br /> branding and messaging as well as additional — REGISTERED <br /> ® VOLTA FOOTPRINT & PAD DETAIL 0 POWER CABINET DETAIL . ARCS CT <br /> revenue opportunities. *zrr �, � <br /> SCALE:N.T.S. SCALE N.T.S. RICE AR n• <br /> STATE OF WASHINSTON j <br /> DC Fast Media Station Power Control System(PCS) ` <br /> Supports upto 2 DC Fast stations EXPIRES:5-20-23 <br /> Charger Specs • Single SO kW station:90A/3P,48oV breaker ANCHOR NOTES: <br /> • Output power.50 kW max(DC) • (2)50 kW stations:17SAV3P,480V breaker CONTRACTOR TO VERIFY POST INSTALLATION OR CAST IN PLACE ANCHOR AS LISTED <br /> • Safely certification ETL safety certified • Certification:UL•2202.2231.50E BELOW BASE ON FIELD MEASUREMENTS AND JURISDICTIONAL REQUIREMENTS. JOB NAME <br /> • <br /> • Dimensions:82"Hx4.21Lx35"D SAFEWAY#1484 <br /> Power Requirements Weight range 13501400Ibs CAST IN PLACE ANCHOR: 4128 RUCKER AVE, <br /> • Input voltage:480VAC • (4)1/2"0 HOT-DIP GALVANIZED HEX HED ASTM F1554 GR.36 CAST-IN-PLACE ANCHORS WITH EVERETT,WA 98203 <br /> • Output voltage:50-500VDC Installation Requirements MINIMUM EFFECTIVE EMBEDMENT OF 3-1/4"OR ENGINEER APPROVED EQUAL <br /> • Circuit size 90A/3P@480V(50kW) • Foundation requirements:48'Dx481Lx48'W POST INSTALLATION MECHANICAL ANCHOR: <br /> or 175/3P @ 480V(50kW x 2) • Clearance.96"H x 75-D x 114'W (4)1/2"0 HILTI KWIK BOLT TZ-S5304 ANCHOR ROD WITH MINIMUM EFFECTIVE EMBEDMENT <br /> • Network connectivity Cell connection • Conduit diameter:size varies based on run lengthsOF 3-1/4"OR ENGINEERING APPROVED EQUAL. /BTC CABINET <br /> SHEET TITLEor LAN access Contact engpmla voltacharging.com <br /> DETAIL SHEET <br /> Display Screen Specs EVCS CITY <br /> • Size.55'Outdoor LED back light system x2 • --. REV/E W_ E OD JERETT <br /> E <br /> � <br /> • Picture:Full HD 1080p resolution w �• _ FIpR <br /> • Power requirements 20At1P,120Vbreaker ;. CONTRACTOR TO <br /> • Flle type:JPEG or PNG !; ENSURE CONCRETE ERMI T <br /> //// � � FOUNDATION AND <br /> Installation Requirements _,� GRADE ARE FLUSH <br /> • Foundation requirements:3613 x 361  INSTALL 1/2"COMPRESSIBLE7 PROPOSED <br /> .•m,a. — ...� <br /> x 36"W approx. •......+... JOINT FILLER WHERE CONCRETE <br /> r............ <br /> (4)1/2"0 SIMPSON <br /> • Conduit diameter:3"power conduit/ _ FOUNDATION ABUTS STRONG-TIE STRONG-BOLT <br /> � a� <br /> 1'communication conduit approx. 1\ EVCS ANCHORS EXISTING PAVEMENT,TYP 2 EXPANSION ANCHOR w/ #5 REBAR @ 12" 3 <•n Sbi ICDIao) <br /> 3 1/4"MIN EMBEDMENT O.C.EACH WAY 2 J-15221 REv6ED ICowl <br /> SEE PLAN 2)-21 PREI MINARY ICO50I <br /> voltacharglrlg.com nc-acco �� i I / 4"MAX OR MATCH 3/4"CHAMFERED <br /> HEIGHT OF EXISTING REV DATE DESCRIPTION <br /> 2"CLR I CONCRETE SLABS EDGE(TYP) <br /> 0/ <br /> 2 <br /> or z 1- <br /> CC o >or ij w g <br /> o O U� ► #5 @ 9"OC TOP B BOTTOM W _�— - °, <br /> 1 =U' EACH WAY,TYP 3"CLEAR o=+. sr: <br /> A. <br /> CHECKED BY: <br /> • <br /> 3"CLR eh <br /> 3"CLR CONCRETE FOUNDATION <br /> UNDISTURBED SOIL <br /> OR PREPARED <br /> - SUBGRADE PROPOSED D 1 <br /> GRANULAR BACKFILL <br /> ® VOLTA DC FAST STATION DETAIL DISPENSER PAD SECTION/ELEVATION DETAIL POWER CABINET ANCHORAGE &PAD DETAIL <br /> SCALE:N.T.S. e SCALE:N.T.S. 22"x 34"SCALE:1"=1'-0" 11"x 17"SCALE:1/2"=1'-0" <br />