Laserfiche WebLink
MAR 16 2024 <br /> CITY OF EVERETT <br /> Par1R3 it WrYKIPA <br /> H ufford <br /> Non-structural wall construction method notes <br /> Also attached, layout diagram <br /> -Wall to be constructed with a 2x4 frame and drywall <br /> -Studs 16" apart center to center. <br /> -Doorway constructed with header held by jack studs paired to king studs, see figure 1 <br /> Figure 1, door stud placements. <br /> -closet opening framed in the same manner <br /> -frame to be anchored to cement pad foundation with drop-in cement anchor bolts and <br /> construction adhesive <br /> -frame mounted to ceiling joists <br /> -2 electrical outlets added on each side of wall <br />