Laserfiche WebLink
BPI ' '� 19710 - 144th Avenue Northeast Wood;nv+i <br /> Telephone: (425)483-6666 or(4251454-3929 Fax <br /> SUBMITTALS DATE: 04/04/2024 <br /> PROJECT NAME: Mountain View Condominiums <br /> Roof System: <br /> • Remove existing roof system. <br /> • Mechanically fasten a NB 48 Base sheet with enough fasteners to hold in <br /> place until insulation is installed, and torch apply one layer of Vapor <br /> Retarder TA 38 over the base sheet. <br /> • Mechanically fasten the first layer of 3.3 CGF ISO over the vapor barrier <br /> with the second layer being adhered. <br /> • Adhere one layer of%" Densdeck over the ISO insulation. <br /> • Fully Adhere one layer of 60mi1 Sikaplan PVC over the Densdeck <br /> Base Flashings <br /> • Adhere one layer of Sikaplan PVC to all wall curbs. <br /> Sheet Metal: <br /> • Fabricate & install new clad saddles. <br /> • Install new continuous gutter and new downspouts at penthouse locations. <br /> • Install new Fry Reglet at chimney and penthouse locations. <br /> • Install new 24ga prefinished coping, standard colors only. <br />