My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 RIVERSIDE RD 2024 AMAZON Plans 2024-11-26
>
Address Records
>
RIVERSIDE RD
>
607
>
AMAZON
>
Plans
>
607 RIVERSIDE RD 2024 AMAZON Plans 2024-11-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 11:34:12 AM
Creation date
11/26/2024 11:33:57 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
607
Tenant Name
AMAZON
Permit
B2405-046
Year
2024
Notes
REPAIR EXISTING SLAB WITH FOUR HELICAL PIERS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> M 0 . . :f <br /> 4 .u.. It ..r.,w <br /> P P. -- <br /> t <br /> N. �. - a ii <br /> . . <br /> ' �'-" !P..-fie''' <br /> _ 4^ •- <br /> ... <br /> View at the Southeast Corner — Two Piers at this Side <br /> The helical piers will be machine driven with a hydraulic head and will use the low profile 4036 <br /> brackets Or the 4040 flat tops depending on the depth of the foundation The piers should not <br /> be spaced more than 7-feet apart and the pier locations are shown in the attached repair plan. I <br /> have also shown the addition of steel angle placed on top of the brackets to spread the lifting <br /> force under the edge of the pad. <br /> I have calculated that the pressure used to drive the helical piers should be at least 5,000 <br /> pounds of equivalent torque capacity under the pad using generator load of about 10,000 <br /> pounds and dead loading consistent with the materials used. The pipe pier shafts will be <br /> supported for their full length against buckling. They will be installed in consolidated marine <br /> sediments or glacial till soil typical in this area. This soil has no acidic conditions that would <br /> deteriorate the steel piers. I anticipate that the hard bearing layer is present about 20 to 25 feet <br /> below the footings based on pier installation at other nearby locations. <br /> In addition to the helical piers and brackets, I have shown the addition of an expansive <br /> polyurethane fill to be injected under the pad after it is lifted to fill any voids created by the lift. <br /> This will ensure that the bearing capacity is maintained_ <br /> In conclusion, I found that the generator pad at the Amazon Facility at 607 Riverside Road in <br /> Everett, Washington has expel e ced up to 4%-inches of settlement at the south•end of the pad. <br /> Please refer to my attached repair plan for lifting and stabilization recommendations possible <br /> with a total of four hydraulically driven helical piers and support brackets with steel angle <br /> extensions two sides of the foundation. <br /> I have enjoyed working with you on this project. If you have any additional questions, <br /> comments, or concerns please feel free to call. <br /> cejoi."41.4414t4titt <br /> .II - - 1 tz, (-)4 (c)/2..u. <br /> Few ' I. _ .,. <br /> I %mofh ,1 de P w. <br /> . 1 `JO\':A1.\:;- <br /> EXFkL. 6 19 f.1.5 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.