My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2826 RUCKER AVE 2025-01-15
>
Address Records
>
RUCKER AVE
>
2826
>
2826 RUCKER AVE 2025-01-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2025 9:09:34 AM
Creation date
11/26/2024 2:37:13 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2826
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
View images
View plain text
Mr. John Adams <br /> Adams Architecture <br /> Plan Check Number: BW2002-002, First Building Review <br /> March 17, 2020 <br /> Comments <br /> 1. The Upper Floor level includes penetrations into and through the rated wall assemblies. Details <br /> should be provided in the construction drawings to fire-proof the penetrations. The details <br /> should specify listed tested assemblies. Where the exception of IBC Section 714.3.2 is used, a <br /> detail diagraming the prescribed requirements should be provided. See IBC Sections 107.2.1 <br /> and 714.3. <br /> 2. The Upper Floor level includes penetrations for lighting into and through the rated ceiling <br /> assemblies. Details should be provided in the construction drawings to fire-proof the <br /> penetrations. The details should specify listed tested assemblies. Where the exception(s) of <br /> IBC Section 714.4.2 is used, a detail diagraming the prescribed requirements should be <br /> provided. See IBC Sections 107.2.1 and 714.4. <br /> 3. The Upper Floor level includes a communal laundry room and a janitor closet with a sink. <br /> Exhaust fans should be provided. The ventilation requirements should be specified. See IMC <br /> Section 403.8.4. <br /> 4. The Upper Floor level includes ceiling fans in the bathrooms, communal laundry room,janitor <br /> closet that penetrate the membrane of the rated ceiling assembly. The drawings should specify <br /> shafts or radiation dampers. Where shafts are provided,details for the shaft construction <br /> should be provided in the drawings. See IBC Sections 717.6 and 717.6.2. <br /> 5. The Upper Floor level includes exhaust ducts for kitchen fans and a dryer in the communal <br /> laundry room. The ducts are anticipated to penetrate through wall and horizontal membranes <br /> and assemblies. Details for shafts should be provided in the construction drawings. Note that <br /> dampers are not permitted on these ducts. See IBC Sections 714 and 717. <br /> This review has been performed for general compliance with the building codes as adopted and <br /> amended by the state of Washington and the city of Everett. Corrections and comments made <br /> during the review process do not relieve the project from compliance with code and permit <br /> requirements. The designers-of-record are responsible for a complete design in accordance with <br /> the laws of the state of Washington. <br /> If you have any questions or require additional clarification, please contact us. <br /> Respectfully, <br /> Drew Martin, P.E., S.E. <br /> Associate Engineer/ Commercial Plans Examiner <br /> (425)257-8813 <br /> dmartin@everettwa.gov <br /> S:\BMarti n\2020\BW2002-002_R1.docx <br /> O3200 Cedar Street © 425.257.8810 0 everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).