Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 1/16/2024 1/16/2024 BLDG 08-FRAMING I RAKEEB KHAN CANCELLED eTRAKiT Inspection Request <br /> Notes: <br /> 1/12/2024 4:04 PM INTEGRITY MAINT&RPR LLC <br /> Please come inspect in PM.Construction entrance is the back door and down the stairs. <br /> Contact Name:INTEGRITY MAINT&RPR LLC <br /> Site Address:2330 MELVIN AVE <br /> Phone:4252326650 <br /> e-Mail:jeremy@integrityrepair.net <br /> Contractor called and cancelled inspection. Reschedule online. <br /> BLDG 09-FIRE <br /> 1/16/2024 1/16/2024 STOPPING/BLOCKIN RAKEEB KHAN CANCELLED eTRAKiT Inspection Request <br /> G <br /> Notes: <br /> 1/12/2024 4:04 PM INTEGRITY MAINT&RPR LLC <br /> Please come inspect in PM.Construction entrance is the back door and down the stairs. <br /> Contact Name:INTEGRITY MAINT&RPR LLC <br /> Site Address:2330 MELVIN AVE <br /> Phone:4252326650 <br /> e-Mail:jeremy@integrityrepair.net <br /> Contractor called and cancelled inspection. Reschedule online. <br /> 1/16/2024 1/16/2024 BLDG 12- RAKEEB KHAN CANCELLED eTRAKiT Inspection Request <br /> INSULATION <br /> Notes: <br /> 1/12/2024 4:04 PM INTEGRITY MAINT&RPR LLC <br /> Please come inspect in PM.Construction entrance is the back door and down the stairs. <br /> Contact Name:INTEGRITY MAINT&RPR LLC <br /> Site Address:2330 MELVIN AVE <br /> Phone:4252326650 <br /> e-Mail:jeremy@integrityrepair.net <br /> Contractor called and cancelled inspection. Reschedule online. <br /> 1/18/2024 1/19/2024 BLDG 08-FRAMING RAKEEB KHAN APPROVAL As noted <br /> Notes: <br /> 1/17/2024 2:31 PM INTEGRITY MAINT&RPR LLC <br /> Please come for an AM inspection. Please use construction entrance at back of home,and down the stairs. <br /> Contact Name:INTEGRITY MAINT&RPR LLC <br /> Site Address:2330 MELVIN AVE <br /> Phone:4252326650 <br /> e-Mail:jeremy@integrityrepair.net <br /> OK to cover existing framing only.New framing/addition to be inspected under a separate permit.Do not cover stairwell addition portion and electrical <br /> panel location. <br /> Inspected on 1/18/2024 <br /> I <br /> Printed: Friday, 12 July,2024 2 of 4 rk <br /> SUPERION <br />