My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10705 HOLLY DR 2016 Plans 2024-12-02
>
Address Records
>
HOLLY DR
>
10705
>
Plans
>
10705 HOLLY DR 2016 Plans 2024-12-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 8:39:55 AM
Creation date
11/27/2024 8:39:10 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
10705
Permit
C1611-001
Year
2016
Notes
SFR ADDITION, REMODEL
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,DGME ASPHALT SHINGLES PROVIDE: <br /> EM57NG ROOF <br /> 1.15/32"APA RATED PLYWOOD OR 7/16'OSB APA RATED <br /> SHEATHING; <br /> 5 f1 2.USE CLASS"B'OR BETTER MATERIAL; <br /> +I 3.STORE PRODUCT FLAT; <br /> 4.DO NOT INSTALL ON WET SURFACES; <br /> 1s 5.PROVIDE NON-PERFORATES 30#ASPHALT SATURATED FELT <br /> T/P Eiy. sr __— ON SHEATHING; <br /> 6.USE CORROSION RESISTANT FASTENER MUST BE LONG <br /> ENOUGH TO PENETRATE AT LLEAST 3/4;INTO SHEATHING. } n <br /> } ��a�OU ELEVATION NOTES 0 a <br /> mmD <br /> mggNERECANNOTPASS LALL EXTERIOR WINDOW AND DOOR OPENINGS SHALL BE = <br /> CD <br /> AOlNDOYftC�QfV FLASHED AT THE HEAD WITH MIN.#26 CAUSE (n <br /> CORROSION-RESISTANT METAL BUILDING PAPER TO BE 3 <br /> —-- -— LAPPED OVER HEAD FLASHING,TYP.USE"MOISTSTOP E-Z <br /> W b SEAL'AT PERIMITEi OF DOOR AND WINDOW OPENINGS O £ <br /> INSTALL PER MANIFACTIRERS RECOMENDATIONS AND IN m° <br /> ACCORDANCE WITH IRC; <br /> OF CORROSION-RESISTANT METAL,AND SHALL BE a <br /> IFNN LY/T STLWS< - INSTALLED IN COMPUANCE WITH IRC; -� L <br /> 3.FLASH AS INDICATED AND REQUIRED.FLASH ALL ROOF i o <br /> - _ PENETRATIONS; Q v <br /> 4.ALL ROOF VALLEY FLASHING,STEP FLASHING,WALL N� <br /> TTZ @ ROOF FLASHING SHALL BE GAKVANIZED OR 160Z COPPER. <br /> —T———————— No COPPER FLASHING SHALL BE IN CONTACT WITH OTHER <br /> SLA8 REY. _ - -- -- 6� �� PT6X6POST METAL IF CONTACT CAN NOT BE AVOIDED USE <br /> PERM-A-BARRIER AS AN ISOLATOR PROVIDE FLASHING <br /> WITH DRIP STRIPS ABOVE ALL WINDOWS AND DOORS; <br /> �NIXdff ADDRIAV' f.1TS70YG <br /> O �N <br /> Co <br /> NORTH-WEST ELEVATION F— }rn <br /> scale 1/4"=1'-0" Q <br /> O <br /> Q =� <br /> LLJ <br /> ow <br /> O > <br /> 2 W <br /> P PAN BE40 0' ff H M �HV�ZAAA STRIPS <br /> ARGMaf/ DO#' ND ABO�ALL DO[IP AIM#1ND0#8 2 <br /> ASSEMBLIES TRdfS AT ALi LocAW <br /> Cn <br /> ROOF CONSTRUCTION: ZO <br /> *COMPOSITION SHINGLES INSTALL PER MFR'S SPESIFICATIONS; <br /> *30#BUILDER'S FELT; I— <br /> *1/2"SHEATHING <br /> *TRSUSES 0 24"O.C.; Sf1 > <br /> *5/8"GYPSUM WALL BOARD; Ls W <br /> *VAPOR BARRIER-PVA PRIMER; Sy _J <br /> *INSULATION PER SCHEDULE; - W <br /> *CARDBOARD BUFFLE AT ALL EAVES,RIDGES,AND WALL <br /> VENTS TO MAINTAIN 1"CLEAR AIR SPACE ROM ROOF M T� ~ CD <br /> SHEATHING-SEE DETAILS. DISOG <br /> -- -- Q O <br /> WALLC0NSTRUCT10N y W N <br /> *SIDING PER ELEVATIONS; * = cD <br /> *7#BUILDERS PAPER OR 60 MIN.PAPER; <br /> *2X6 WALL STUDS AT 24"O.C.AT EXTERIOR U.N.O.; o <br /> *2X4 WALL STUDS AT 16.O.C.AT INTERIOR U.N.O.; o O O <br /> *SOLID WALL SHEATHING AS PER SHEAR SCHEDULE; m <br /> :*SOLID <br /> PER SCHEDULE; ___ ___ ALL EXTERIOR{�1N00{N AND DOOR OPENINGS U) <br /> *1/2"GYPSUM WALL BOARD; 0 SHALL BE FLASHED AT THE HEAD WITH AN. <br /> *PROVIDE 15#FELT 0 CORNERS; —-- -— 126 GAUGE CORROSION-RESISTANT METAL. <br /> *PVA PRIMER-ALL WALLS BUILDING PAPER TO BE LAPPED OVER HEAD <br /> - - - - - FLASHING, TYR USE MOISTOP E-Z SEAL"AT >W> <br /> - - -- PERIMETER OF DOOR AND WINDOW OPENINGS j <br /> F L 0 0 R C O N S T R U C T I O N INSTALL PER MANUFACTURERS RECOMkUDADONS <br /> *FINISHED FLOOR PER PLANS AND SPESIFICATIONS; o <br /> * V IRC <br /> 3/4"TONGUE-AND-GROOVE PLYWOOD SUB-FLOOR GLUED AND IN ACCORDANCE FLASHrNG AND COUNTER RI fLAS <br /> LASHrNc To BEAN. <br /> AND NAILED; � <br /> * 26 GAUGE'OF CORROSION-RESISTANT <br /> 2X10 FLOOR JOISTS k TJI PER PLANS; METAL, <br /> *INSULATION PER SCHEDULE AND SHALL BE INSTALLED IN COMPLIANCE O <br /> Q n FLASH AS INDICATED AND REQUIRED. RASH Z <br /> EI �--------------------------- -- --— ALL ROOF PEN£IRARONS <br /> II I <br /> ity review <br /> rL4II I I <br /> 1 01.31.17 <br /> µµggAq L_J L_J <br /> PA R READ OR NATURALLY RESST TO DfC[AY <br /> M1NU UM DESIGN LOADS 40 P.SF. <br /> dGIST ON DECK BEAM• TOENAIL EACH AD NA2 BY(3)Lid <br /> BRIDGING OR BLOCKING TO J( r;TOENAIL EA.SID&EA.END NAIL BY Md <br /> 2XDECKING TO JIST OR DECK BEAM,•BLIND AND FACE NAIL BY(2)16d <br /> USE OF No.2 HEW--FIR OR BETTER 50 P.SF.LOADING <br /> SOUTH-EAST ELEVATION <br /> scale 1/4"=V-0" A09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.