Laserfiche WebLink
Lm <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Thank you for your email.My recommendation would be to schedule the inspection and then call 425-257-8810 the morning of the scheduled <br /> inspection between 7:30am to 8:30am and then follow the prompts to Electrical Inspections.You will be able to speak directly to the assigned electrical <br /> inspector and make a plan for timing or if they would like to do a virtual inspection(not common in the city). <br /> The other option would be to follow the same instructions noted above without scheduling the inspection first.I hope this helps! <br /> Best Regards, <br /> Ryan Hammer <br /> Permit Technician I Permit Services <br /> 425.257.8810 13200 Cedar Street,2nd Floor,Everett,WA 98201 <br /> Phone Hours:M-F:8:30 a.m.—12 p.m&amp;1 p.m.—3 p.m. <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public Records <br /> Act. <br /> From:Haley Masbruch&lt;haleym@danardelectric.com&gt; <br /> Sent:Thursday,January 20,2022 1:52 PM <br /> To:Engineering/Public Services(PW)&lt;evteps@everettwa.gov&gt; <br /> Cc:Tanya Simons&lt;tanyas@danardelectric.com&gt; <br /> Subject:[EXTERNAL] Re:Elect.Permit#E2012-021 <br /> CAUTION:This email originated from outside of the organization.Do not click links or open attachments unless you recognize the sender and know the <br /> content is safe. <br /> Hello! <br /> I'm writing to get in touch with the electrical inspection staff regarding the permit in the subject line for work over at the Kaiser Permanente building. <br /> Our office was doing a check of inspection records and we saw that this had never been inspected for some reason-yikes. <br /> The work is in an occupied medical facility and I can work with them for a time to let the inspector in to check the work.Another option-if acceptable <br /> to the inspection staff-could be for an inspection over Skype(similar to what Lnl has been doing),or for me to send over the as-built drawing and <br /> photos of what was installed. <br /> We are doing another project in the Kaiser building in early February,so that could also give us an opportunity to get this permit finaled while we are <br /> getting the new project inspected. <br /> Anyway,let me know what you would prefer,and I will make the needed arrangements to get it handled. <br /> Thanks and don't hesitate to get in touch with questions.If you call and don't pick up for some reason,just leave a message and 111 get right back to <br /> you. <br /> Best, <br /> Haley N.Masbruch I Project Manager/Service Coordinator <br /> a: Danard Electric 1 18819 38th Ave E I Tacoma WA 98446 <br /> e:hal <br /> I_ <br /> Printed:Wednesday, 27 November, 2024 2 of 2 <br /> SUPERION <br />