My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
717 HAWTHORNE ST BLDG A 2024-12-30
>
Address Records
>
HAWTHORNE ST
>
717
>
717 HAWTHORNE ST BLDG A 2024-12-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 8:00:05 AM
Creation date
12/1/2024 7:44:12 AM
Metadata
Fields
Template:
Address Document
Street Name
HAWTHORNE ST
Street Number
717
Unit
BLDG A
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> EVERETT OFFICE USE ONLY <br /> WASHINGTON <br /> Permit Services Transmittal Date Received Stamp <br /> PERM IT/PROJECT#: B2406-045 <br /> SITE ADDRESS: 717 Hawthorne St Buildinq A <br /> PROJECT NAME: Seismic Shear Wall Installation <br /> FROM: John Mansfield COMPANY:Coast Property Manaqement ❑Chronology—Permit Counter Transmittal <br /> ❑Plan Review Routing <br /> PHONE#: 425-866-7753 EMAIL: Imansfield(a�coastmgt.com Location: ❑File ❑Reviewer Office <br /> Date Logged: By: <br /> Route to:(check all that apply) Name of Reviewer Type of Review <br /> ❑ Planning Reviewer Name: ❑✓ Re-Review <br /> ❑ Public Works Reviewer Name: ❑ Revisions After Approval <br /> ❑✓ Building Reviewer Name:Yuen Tran ❑ Revisions After Issuance <br /> ❑ Fire Reviewer Name: ❑ Other <br /> ❑ Other Reviewer Name: ❑ Other <br /> Provide quantities for all items submitted <br /> PLANS REPORTS/CALCULATIONS OTHER DOCUMENTS <br /> Qty Qty Qty <br /> Architectural/Building Plans _ Geotechnical Report 1 Correction Letter Responses <br /> Structural Plans _ Drainage Report _ Draft Easement <br /> Civil Plans _ SWPPP Report _ Recorded Easement <br /> Site Plan _ Wetland Report Height Survey <br /> Landscape Plan _ Critical Area Report Base Elevation Survey <br /> Survey _ Traffic Study/TDM Report _ Critical Area Covenant <br /> Elevations Structural Calculations Stormwater Covenant <br /> Floor Plans _ Height Calculations _ Covenant-Other <br /> Special Inspection Report _ Plumbing Calculations Performance Guarantee <br /> As-Builts _ Other Warranty Bond <br /> Plat Maps _ Other 1 Other Contractor Information <br /> Original City Redlines Returned _ Other Other <br /> 1 Other Partial site plan-new bike storage Other Other <br /> Other Other Other <br /> Items submitted are: <br /> ❑Complete Plan Set Replacement ❑✓ Additional Documents <br /> (Slip-sheeting not permitted) (To be added to file) <br /> Comments to Reviewer: FOR CHANGES IN SCOPE: <br /> Updated site plan showing 3 bike racks for up Revised Description of Work: <br /> to 6 bikes to replace one parking spot taken <br /> offline by the shear wall installation <br /> Contractor Information Revised Valuation: <br /> Signed: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.