My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1919 HEWITT AVE 2025-01-10
>
Address Records
>
HEWITT AVE
>
1919
>
1919 HEWITT AVE 2025-01-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 11:46:59 AM
Creation date
12/1/2024 7:55:39 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
1919
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2406-015 Description: REMOVE DOORS,SINGLE-PANE WINDOWS&SUPPORTING <br /> HALF WALLS, <br /> Applied:6/10/2024 Approved:7/18/2024 Site Address: 1919 HEWITT AVE <br /> Issued:8/14/2024 Finaled: City,State Zip Code: EVERETT,WA 98201-3612 <br /> Status: PERMIT ISSUED-PAPER Applicant:SHIN GOTO DYKEMAN ARCH <br /> Parent Permit: Owner: HEWITT AVENUE LLC <br /> Parent Project: Contractor: LOOMIS CONSTRUCTION <br /> Details: <br /> WINDOWS&DOORS WILL BE REPLACED WITH NEW. <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 8/26/2024 8/26/2024 BLDG 01- Matt Schreifels OTHER see notes <br /> CONSULTATION <br /> Notes: <br /> 8/25/2024 10:37 AM LOOMIS CONSTRUCTION <br /> AM preferred Thanks! <br /> Contact Name:LOOMIS CONSTRUCTION <br /> Site Address:1919 HEWITT AVE <br /> Phone:4253445353 <br /> e-Mail:loomisconst@aol.com <br /> Discussed project,timeline and inspections schedule <br /> 8/28/2024 8/28/2024 BLDG 08 FRAMING Matt Schreifels OTHER Duplicate Inspection <br /> Notes: <br /> 8/26/2024 9:26 PM LOOMIS CONSTRUCTION <br /> Contact Name:LOOMIS CONSTRUCTION <br /> Site Address:1919 HEWITT AVE <br /> Phone:3605681075 <br /> e-Mail:loomisconst@aol.com <br /> Duplicate Inspection <br /> 8/28/2024 8/28/2024 BLDG 08-FRAMING Matt Schreifels APPROVAL see notes <br /> Notes: <br /> upload RFI detail from architect that reflects work on site once received. <br /> I <br /> Printed:Thursday,03 October, 2024 1 of 4 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.