LOAD CALCULATIONS GENERAL NOTES PtENGINEERSTYPE MARK EXISTING LOAD(VA) NEW LOAD(VA)
<br /> Pump#1 CWP401 11426.25 VA 6600 VA 1. NOT ALL CONDUIT AND CONDUCTORS FOR BRANCH CIRCUITS HAVE BEEN SHOWN. ITS THE RESPONSIBILITY Seattle / Spokane // Baltimore
<br /> Pump#2 CWP402 11426.25 VA 6600 VA OF THE CONTRACTOR SHALL INSTALL ALL REQUIRED CONDUIT AND WIRE FOR A COMPLETE INSTALLATION. Copyright C FSi consulting engineers
<br /> Biller Management System BMS 480 VA 480 VA 2. PROVIDE A DEDICATED NEUTRAL FOR ALL CONTROL WIRING.
<br /> Boiler#1 B-401 480 VA 1800 VA
<br /> Boiler#2 B-402 480 VA 1800 VA 3. ALL WIRING SHALL BE CONCEALED IN CONDUIT. ALL CONDUIT SHALL BE CONCEALED IN FINISHED AREAS. Electrical Consultants,Inc.
<br /> 19015 36th Avenue West,Suite E
<br /> TOTAL 24292.5 VA 17280 VA 4. HVAC CONTROLS-PROVIDE ALL CONDUIT FOR HVAC CONTROLS,AND ALL 120V CONTROL WIRING AS Ly—od,Washington 98036
<br /> REQUIRED BY THE MECHANICAL CONTROLS CONTRACTOR. COORDINATE REQUIREMENTS WITH It Phone(425)775-1799 FAX(425)774-9870
<br /> MECHANICAL CONTRACTOR PRIOR TO BID.
<br /> NET DECREASE 7012.5 VA
<br /> 5. COORDINATE EQUIPMENT EQUIPMENT CONNECTION TYPES AND EXACT LOCATION PRIOR TO ROUGH-IN.
<br /> 6. PROVIDE ALL CODE REQUIRED DISCONNECTING MEANS,AND CONNECTIONS TO EQUIPMENT.
<br /> 7. CONDUIT ROUTING: CONDUIT ROUTING IS SHOWN AS A SUGGESTED METHOD. CONTRACTOR IS RESPONSIBLE
<br /> TO ROUTE CONDUIT TO MINIMIZE CONFLICT WITH OTHER EQUIPMENT AND PENETRATIONS. PATCH
<br /> AND REPAIR ALL PENETRATIONS TO ORIGINAL CONDITION. SEE SPECIFICATIONS.
<br /> DEMOLITION NOTES:
<br /> 1. REMOVE ALL EXISTING ELECTRICAL EQUIPMENT,CONDUIT,AND WIRE BACK TO SOURCE,OR NEAREST UPSTREAM 7
<br /> DEVICE NOT BEING REMOVED-ON SURFACES(WALLS,CEILINGS,FLOORS)BEING REMOVED AS PART OF THE L
<br /> CONTRACT. REFER TO MECHANICAL AND ARCHITECTURAL DEMOLITION PLANS FOR EQUIPMENT REMOVED. LLI
<br /> 2. REMOVE BACK TO SOURCE,EXISTING LOW VOLTAGE CABLING,CABLE TRAY,RACEWAY,MOUNTING EQUIPMENT, 2
<br /> ETC.,WHICH IS ASSOCIATED WITH TEL/COMM,TV,CALL SYSTEMS,AND FIRE ALARM DEVICES BEING REMOVED. LLI
<br /> 3. LEGALLY DISPOSE OF AND/OR RECYCLE MATERIAL BEING REMOVED AS REQUIRED BY STATE AND LOCAL U
<br /> JURISDICTIONAL AUTHORITIES.
<br /> 4. MAINTAIN,REPAIR,OR REPLACE EXISTING SYSTEMS NOT BEING INTERRUPTED,BUT ARE AFFECTED BY J
<br /> DEMOLITION WORK. ^
<br /> 5. COORDINATE ANY TEMPORARY INTERRUPTIONS IN POWER WITH OWNER AND ARCHITECT. SUBMIT SCHEDULE TO LLI
<br /> OWNER FOR APPROVAL,MINIMUM ONE WEEK PRIOR TO PROPOSED POWER INTERRUPTION.
<br /> 6. FOR THE REPLACEMENT OF ANY EXISTING DEVICES WITH NEW-THE CONTRACTOR SHALL MODIFY,PATCH,AND O
<br /> REPAIR THE EXISTING SURFACE TO ACCOMMODATE NEW DEVICE OR LIGHTING FIXTURE. PROVIDE NEW
<br /> MOUNTING EQUIPMENT AND SUPPORT,AS REQUIRED. EXTEND CONDUIT AND WIRE TO NEW DEVICE AS REQUIRED. I A
<br /> LLI (D
<br /> 7. PATCH,REPAIR,AND PAINT EXISTING SURFACES THAT ARE AFFECTED BY REMOVAL OF EQUIPMENT,TO J J z
<br /> ORIGINAL CONDITION. FIRE SEAL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES. COORDINATE PAINT O
<br /> COLOR WITH OWNER. REPAIR IS SUBJECT TO APPROVAL BY OWNER AND ARCHITECT. O
<br /> 0 CO
<br /> V)
<br /> SYMBOL LEGEND 0 (D I j
<br /> POWER z LU
<br /> TO EXISTING PRIMARY JUNCTION
<br /> VAULT AT BUILDING 3/4 UTILITY YARD
<br /> � DUPLEX RECEPTACLE,GFCI TYPE,WITH WEATHERPROOF COVER. J LLI
<br /> UNDERGROUND PRIMARY CIRCUIT 1-4" ® EQUIPMENT CONNECTION(INCLUDES CONDUCTORS, Q
<br /> CONDUIT TRENCHING, AND BACKFILL TERMINATIONS,GROUNDING CONDUCTOR,ETC.) ry
<br /> BY CONTRACTOR TO UTILITY REQUIREMENTS. l
<br /> CONDUCTORS BY UTILITY. DISCONNECT SWTCH OR COMBINATION MOTOR STARTER/
<br /> DISCONNECT SWITCH.SEE EQUIPMENT SCHEDULES.SWITCH W J O
<br /> SHALL INCLUDE ALL REQUIRED CONNECTIONS. (60)INDICATES z
<br /> C__�4SOY/277 V,3 PHASE,4 WIRE, SWITCH AMPERAGE/(40)INDICATES FUSE AMPERAGE. O
<br /> PADMOUNT TRANSFORMER BY UTILITY.
<br /> PAD AND VAULT BY CONTRACTOR G 208/120V PANELBOARD. LLI O
<br /> 23135 TO UTILITY REQUIREMENTS. \ !,
<br /> MANUAL MOTOR STARTER.SEE EQUIPMENT SCHEDULES. LIJ �' ` w
<br /> SERVICE POINT BUILDING 3 AND 4
<br /> UNDERGROUND SECONDARY CIRCUIT VJ C)
<br /> 4 SETS EACH WITH,3#350kcmil+
<br /> 1#35ok-1l N+1#4G,3"C. 00
<br /> r�
<br /> V
<br /> vM CUSTOMER METERING AND PULSE INITIATING SHEET INDEX =
<br /> C.T.'S FOR EMS. COORDINATE
<br /> AM REQUIREMENTS WITH EMS VENDOR. E0.0 COVERSHEET LLI
<br /> E0.1 PANEL SCHEDULES
<br /> t9481 El ELECTRICAL PLAN
<br /> 3P-800A
<br /> 3-8001AF v
<br /> PANEL"DP4" (277/48OV,3J,4W)
<br /> 1200A BUS-,
<br /> r"#�8G,I
<br /> -100A 3P-600A 3P-100A 3P-200A 3P-100A 3P-100A 3P-100A 3P-100A 3P-100A 3P-100A 3P-200A 3P-60A 3P-60A o
<br /> 100AF 3-600AF --3-100AF — 3-200AF 3-50AP -- 3-70AF---- — 3-70AF -- 3-50AP 3-70AF 3-70AF 3-125AF — 3-50AP 3-40AF t°
<br /> SPARE SPARE SPACE
<br /> _ 1+1#1N+ 2 SETS EACH WITH 3#6+1#1 OG, 3#4+1#8G, 3#4+1#8G, 3#6+1#10G, 3#4+1#8G, 3#4+1#8G, 3#1/0+1#6G, 3#6+1#1OG, 3#4+1#8G,1/4"C 3#350kcmil+ 3/4"C 1"C 1"C 3/4"C 1"C 1"C 1 1/4"C 3/4"C 1"C
<br /> 1#350kcmil N+
<br /> 1#1G,3"C 3643 11204 7318 2994 10326 4926 13592 3367 1663
<br /> p 48011 p 480V1 p 480V1 p 480V1 p 480V1 p 480V1 p 480V1 p 480V1 p 480VIEXSTING
<br /> I"TP41" 3OkVA I"TP42" 45kVA I"TP43" 45kVA I I"TP44" 3OkVA I I"TP45" 45kVA I I"TC41" 45kVA I "TC42" 75kVA I "TDB" 3OkVA I"TKILN" 25kVA
<br /> (TRANSFORMER �12TRANSFORMER (TRANSFORMER (TRANSFORMER (TRANSFORMER (TRANSFORMER (TRANSFORMER (TRANSFORMER (TRANSFORMER G A.
<br /> l zov 120v 120V120V120V 120V 120V 120V208Y Y' Y' 208Y Y' 208Y Y' 208Y Y' 208Y Y' 208Y Y' 208Y 240V3#2/0+1#2/ON+ 3#2/0+1#2/ON+ 3#1+1#1N+ 3#2/0+1#2/ON+ 35 0 3#350kc il+ 3#1 O
<br /> 3#1+1#1N+ 1#4G,2"C 1#4G,2"C 1#6G,1 1/2"C 1#4G,2"C 3#2/0+1#2/ON+ 1#350kcmil N+ 1#1 2#1+1#1N+ LYi
<br /> 1#6G,1 1/2"C 3P-175A 3P-175A 3P-100A 3P-175A 1#4G,2"C _ 1#2G,3"C _ 1#6G,1 1/2"C 1#6G,1 1/4"C
<br /> (NOTE 5) (NOTE 5) (NOTE 5) (NOTE 5) 3P-300A 3P-100A
<br /> 13145 18491
<br /> _ __ __ _ __ 3#2/0+1#2/ON+ __ 3#1+1#1N+ __ 3#2/0+1#2/ON+ (NOTE 5) (NOTE 5) �yi18o
<br /> — —T —T -- T — 1#4G,2"C 1#6G,1 1/2"C 1#4G,2"C -- T — -- �
<br /> F I FOA�� 75A�� NOTE 4 I� I FOADI
<br /> I I I I I I I I I I I I I I I I I I I I I I I I I
<br /> I I I I I n l 3P-7QA I I NOTE 4 I I I I I I I I I I I I I I I I I I
<br /> Project No.
<br /> SECTION 1 SECTION 2 SECTION 3 SECTION 1 SECTION L (L I— L 2 SECTION 1 SECTION 2 23025
<br /> NOTE 4 NOTE 4 NOTE 4 NOTE 4 NOTE 4 NOTE 4 NOTE 4 NOTE EXISTING
<br /> PANEL "14" PANEL "M4" PANEL "P41" PANEL "P42" PANEL "P43" PANEL "P44" PANEL "P45" PANEL "C41" PANEL "C42" DIMMER BANK PANEL "KILN" Date
<br /> (NOTE 1) (NOTES 1&2) (NOTE 1) (NOTES 1&2) (NOTE 1) (NOTE 1) (NOTE 1) (NOTE 1) (NOTES 1&2) (NOTE 1) (NOTE 1)
<br /> 3#4+1#8G, 11.21.2023
<br /> r"c
<br /> Date Revision
<br /> 15733
<br /> p 480V
<br /> I"TMP4" 45kVA
<br /> 120vITRANSFORMER -
<br /> 2067 _208Y
<br /> 3#2/0+1#2/ON+ Sheet Title
<br /> 1#4G,2"C
<br /> ELECTRICAL COVER SHEET,
<br /> FSA_T BUILDING 4: ONE-LINE DIAGRAM NOTE: ONE-LINE DIAGRAM
<br /> I ALL EQUIPMENT SHOWN IS
<br /> I I I
<br /> NOT TO SCALE EXISTING, FOR REFERENCE.
<br /> L-- - Sheet
<br /> SECTION 1 SECTION 2
<br /> PANEL "MP4" EO .0
<br /> (Nores 1&2) BID SET