Laserfiche WebLink
14 12/3 SOOW Cord to new 3/4 C, 2 #12, #12G to GFCI <br /> Site Lighting Poles receptacle in Chemical Storage <br /> building for sump pump. <br /> Reference Detail 1/ED•10.5001 Reference Detail 1/ED•10.5001 Reference Detail 3/ED•10.5001 <br /> East Side of Blower Building North Side of Chemical Storage NE Corner of Aeration Basin <br /> 3/4"C, 2 #8, 10G 3/4"C, 2 #8, 10G 3/4"C, 2 #8, 10G <br /> 1"C, 3 #4, #10G 1"C, 3 #4, #10G 1"C, 3 #4, #10G <br /> Panel H1 Panel L1 Panel H2 Panel L2 Panel H3 Panel L3 <br /> M 200AMP 100AMP 100AMP 100AMP 1OOAM8P 1000AMP <br /> 277/480V 10KVA 120/240V 277/480V 10KVA 120/240V / 0V 10KVA <br /> XFMR XFMR XFMR <br /> 1 1/4"C, 4 #2, #6G - 1 1/4"C, 4 #2, #6G <br /> 12/3 SOOW Cord <br /> .� To existing site lighting poles <br /> �2"C, 4 #3 0, 3 4"C, 3 #12, #12G <br /> to SCPUD pole. to existing swale pump <br /> Reference Detail 2ED•10.5101 (Typical of 4) 11.9FLA @ 480VAC <br /> Construction Trailers <br /> 3/4"C, 2 #12, #12G to <br /> 60/40 60/40 60/40 60/40 existing GFCI receptacle <br /> 10KVA and light in swale pump <br /> XFMR enclosure <br /> 3/4"C, 2 #12, #12G to <br /> 3/4"C 2 #8 10G existing GFCI receptacle <br /> 4/3 SOOW (Typical) , Zr-- to pump station for <br /> 1"C, 3 #4, #10G 100A existing sump pump <br /> REC. <br /> 3/4"C, 6 #12, #12G to <br /> Note: 10KVA xfmr. (3) GFCI receptacles & <br /> light in existing Area 06 <br /> 2023 Port Gardner Storage Facility Single Line & receptacle typical Storage Building <br /> O5.14.2024 at each trailer location. <br />