Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 10/5/2020 10/5/2020 BLDG 15-FINAL KURT KECK CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> 10/1/2020 12:23 PM mulugeta lemi <br /> Contact Name:mulugeta lemi <br /> Site Address:407 ROSE WAY <br /> Phone:2063937003 <br /> e-Mail:mulerdream@gmail.com <br /> (10/5/2020 9:35 AM KMK) <br /> Obtain electrical,plumbing,and mechanical finals before building final <br /> 3/22/2021 3/22/2021 PERMIT EXTENSION KATHY COLLISON EXTENSION 407 ROSE WAY <br /> APPROVED <br /> Notes: <br /> 7/23/2021 7/23/2021 PERMIT EXTENSION KATHY COLLISON EXTENSION COVID EXTENSION <br /> APPROVED <br /> Notes: <br /> 11/30/2021 11/30/2021 BLDG 16-FINAL KURT KECK NOT READY see notes <br /> Notes: <br /> 11/24/2021 11:21 AM mulugeta lemi <br /> Contact Name:mulugeta lemi <br /> Site Address:407 ROSE WAY <br /> Phone:2063937003 <br /> e-Mail:mulerdream@gmail.com <br /> (11/30/2021 8:20 AM KMK) <br /> see correction 10/5.Obtain final on both electrical permits. <br /> Reschedule final inspection for building when ready. <br /> 12/14/2021 12/14/2021 BLDG 16-FINAL KURT KECK NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 12/11/202112:45 PM mulugeta lemi <br /> Contact Name:mulugeta lemi <br /> Site Address:407 ROSE WAY <br /> Phone:2063937003 <br /> e-Mail:mulerdream@gmail.com <br /> (12/21/2021 7:57 AM KMK) <br /> Obtain final on 2nd electrical permit.(See inspection on 11/30) <br /> Reschedule for building final when ready. <br /> I <br /> Printed: Monday, 10 June, 2024 2 of 3 <br /> SUPERION <br />