Laserfiche WebLink
WENTZ SP <br /> SECTION 23 , TOWNSHIP 28N , RANGE 4E , W. M . Z <br /> 0 <br /> IL <br /> U <br /> \ \ O <br /> A \s \ `\ APPLICATION RATES AND QUALITY STANDARDS FOR MULCH MATERIALS W <br /> CONS TRUC TION SEQUENCE <br /> ®® \ IE=538.54(18"CMP SW) MULCH MATERIALS QUALITY PRODUCTS APPLICA TION RA IES <br /> 1. PRIOR TO ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL r <br /> SSMH / i \ SCHEDULE AND ATTEND A PRE-CONSTRUCTION CONFERENCE WITH THE STRAW AIR-DRIED; FREE FROM UNDESIRABLE 2--3" THICK <br /> RIM=547.52 e 1 i CITY OF EVERETT INSPECTOR. (CITY OF EVERETT PLANNING SHALL BE SEED AND COARSE MATERIAL 2-3 BALES PER 1000 SF <br /> / IE=s34sa a /;. M A Nn as INCLUDED IN THE MEETING.) <br /> OR 2-3 TONS PER ACRE a a a a a a <br /> UE=sal.00' <br /> / 2. INSTALL ORANGE PLASTIC CLEARING LIMIT FENCING AS INDICATED. <br /> e � - - WOOD FIBER CELLULOSE NO GROWTH INHIBITING FACTORS APPROX 25-30 LBS <br /> q PER 1000 SF, OR Y <br /> \\1\ I 3. INSTALL ALL SILT FENCE AND INLET PROTECTION. 1000-1500 LBS PER ACRE •' 4 <br /> RMi540.16 / p \ 1 4. CLEAR FOR AND CONSTRUCT THE TEMPORARY CONSTRUCTION ACCESS y �4•••• °:� \ <br /> IE=538.43(12"CONC NW) o II \ \ I STABILIZATION TO GRADE. Q, m <br /> / STOCKPILE `^ 111 COMPOST NO VISIBLE WATER OR DUST DURING 2` THICK, MIN; (APPROX. 100 <br /> IE=538.34(12"CONC SW1 / <br /> AREA PROTECT SOIL ( x I HANDLING MUST BE PURCHASED TONS PER ACRE APPROX 800 <br /> IE=s3b.24 1e"cMP NE' 5. CLEAR, GRUB, AND GRADE FOR UTILITY CORRIDORS. d <br /> USING PLASTIC COVERING IE=538.35(1 a"cMP sy �! I \ FROM SUPPLIER WITH SOLID WASTE LBS PER YARD) S••••••• <br /> BMP C123 / j. \ `" 6. MAINTAIN EXISTING PERIMETER VEGETATION AND ADD ADDITIONAL ROW HANDLING PERMIT <br /> a ix x b I OF SILT FENCING WHERE NECESSARY. <br /> (12"CONC S) <br /> ix z 1 IE=s3ass 7. CONSTRUCT UTILITIES, PAVING & DRIVEWAY CUTS PER APPROVED <br /> TOPSOIL STORAGE m°\ I 1 3 I DESIGN PLANS. APPLICATION: <br /> AREA PROTECT SOIL i <br /> USING PLASTIC COVERING x x \�� I MULCH MAY BE APPLIED. <br /> BMP C123 s� i I �� 8. APPLY MULCH TO UNCOVERED AREAS IN ACCORDANCE WITH THE ON DISTURBED SURFACES THAT WILL REMAIN UNWORKED FOR MORE THAN 7 DAYS <br /> MULCH DETAIL THIS SHEET. <br /> P P (2 DAYS IN THE WET SEASON). <br /> -P 10. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE ON DISTURBED AREAS THAT NEED COVER MEASURES FOR LESS THAN 30 DAYS. <br /> STABILIZED IN ACCORDANCE WITH THESE PLANS AND APPLICABLE BMP'S <br /> REMOVED. AS A COVER FOR SEED DURING THE WET SEASON AND DURING THE HOT SUMMER MONTHS <br /> I-0 DURING THE WET SEASON, ON DISTURBED SLOPES STEEPER THAN 3H:1V <br /> PROTECT FUTURE WITH MORE THAN 10 FEET OF VERTICAL RELIEF. <br /> w PERF. STUBOUT <br /> �I LOCATION. MAINTENANCE <br /> BMP C703 STANDARD NOTES MULCH MUST BE INSPECTED REGULARLY AND MORE MULCH ADDED AS NEEDED TO <br /> LIMITS OF CLEARING` _ MAINTAIN THE SUGGESTED APPLICATION RATE ALL RIPS OR TEARS IN PLASTIC SHEETING <br /> \57. Approval of this erosion sedimentation control ESC Ian does not <br /> MARK W ORANGE SHALL BE REPAIRED. SHEETING SHALL BE CHECKED 70 ENSURE IT IS PROPERLY <br /> FLAGGING. BMP C103 � I constitute an approval of permanent road or drainage design (e.g. OVERLAPPED AND WEIGHTED /N PLACE, SHEET/NG SHALL BE RE LAPPED AND WEIGHTS <br /> �X CONST. ENT. sae and location of roads, pipes, restricfors, channels, retention REPLACED AS NEEDED. <br /> xl PER COE STD. DWG facilities, utilities). <br /> W x 201./BMP C105 2. The implementation of these ESC plans and the construction, <br /> maintenance, replacement, and upgrading of these ESC facilities is <br /> \ the responsibility of the applican t1con tractor until all construction <br /> is completed and approved and vegetation/landscaping is <br /> \ x ?65' � / I - established. Li o 1 1 <br /> PROTECT FUTURE W H 3. The boundaries of the clearing limits shown on this plan shall be Q v0) <br /> 75 PERF. STUBOUT � � clearly flagged in the field prior to construction. During the wLOCATION. CB INLET construction period, no disturbance beyond the flagged clearing O N <br /> BMP C103 H PROTECTION limits shall be permitted. The flagging shall be maintained by the Mj Mj <br /> PER COE STD. applicant/contractor for the duration of construction. PERMANENT COVER BMP(HYDROSEED/NG GENERAL <br /> Ir DWG 21O/BMP 4. The ESC facilities shown on this plan must be constructed in NOTES) w W <br /> CP�,O�I C220 (TYP.) conjunction with all clearing and grading activities, and in such a w <br /> r �P F manner as to ensure that sediment and sediment laden wafer do 1. CONSTRUCT/ON ACCEPTANCE WILL BE o> <br /> Vto 31 I N not enter the drainage system, roadways, or violate applicable SUBJECT TO A WELL ESTABL/SHED GROUND COVER N W <br /> wafer quality standards. THAT FULFILLS THE REQUIREMENT OF THE <br /> / 1 5. The ESC facilities shown on this plan are the minimum APPROVED CONSTRUCT/ON PLANS. <br /> x x requirements for anticipated site conditions. During the construction V <br /> o - CB TY1 period, these ESC facilities shall be upgraded as needed for 2. ALL DISTURBED AREAS SUCH AS DETENTION Q Z <br /> W RIM=541.19 FACILITIES, ROADWAY BACK-SLOPES, ETC. SHALL <br /> \ IE=538.72 18"CMP N unexpected storm events and to ensure that sediment and <br /> a ( ) sediment-laden water do not leave the site. BE SEEDED W/TH A PERENNIAL GROUND COVER (y <br /> x - \ IE=538.08(18"CMP S) GRASS TO MINIMIZE EROSION GRASS SEEDING WILL Z <br /> E The ESC facilities shall be inspected routine) and maintained b <br /> WOoL -X-J - 1 p y y BE DONE USING AN APPROVED HYDROSEEDER OR <br /> the applicant/contractor to ensure their continued functioning, <br /> AS OTHERWISE APPROVED BY THE CITY OF W <br /> � especially after storm events. EVERETT 5 W <br /> EX. POWER <br /> e 7. The ESC facilities on inactive sites shall be inspected and G Z_ <br /> POLE TO BE INSTALL a maBE SEEDED SHALL BE CULTIVATED TO THE intained a minimum of once a month or within the 48 hours 3. PREPARATION OF SURFACE ALL AREAS TO C7 <br /> - - - - followinga major storm event. Z <br /> RELOCATED/REMOVED SILT FENCE <br /> O <br /> PER COE STD � P <br /> 8. At no time shall more than one foot of sediment be allowed to SAT/SFACTION OF THE C/TY INSPECTOR. THIS MAY W <br /> DWG 214/BMP C233 accumulate within a trapped catch basin. All catch basins and BE ACCOMPLISHED BY DISC/NG, RAKING, <br /> t� I I conveyance lines shall be cleaned prior to paving. The cleaning HARROW/NG OR OTHER ACCEPTABLE MEANS. <br /> operation shall not flush sediment laden water into the downstream <br /> / L system. 4. IMMEDIATELY FOLLOWING FINISH GRADING, <br /> 9. Stabilized construction entrances shall be installed at the beginning PERMANENT VEGETA TION(CONS/ST/NG OF RAP/D, <br /> of construction and maintained for the duration of the project. PERSISTENT AND LEGUME) WILL BE APPPLIED C a <br /> Additional measures may be required to ensure that all paved areas (MINIMUM 80#PER ACRE). THIS/S TO INCLUDE THE 0 x <br /> are kept clean for the duration of the project. FOLLOW/NG, 209 ANNUAL, PERENNIAL OR HYBRID 07 Z <br /> d 10. The Contractor shall provide periodic street cleaning to remove RYE GRASS 409 CREEP/NG RED FESCUE, 409 L Z <br /> RI m I ) 3 EX. FIRE debris and sediment tracked off the site. WHITE CLOVER. HYDROSEED REQUIRED. y O <br /> RIM537.34540 9 °'.I� 11, Appropriate measures shall be taken to stop sediment from N J 0 <br /> IE=537.34(18"CMP N) ,N HYDRANT Q <br /> IE=537.44(18"CMP S) I o entering surface water bodies if the proposed BMPs fail. 5. FERT/L/ZER: SHALL BE APPLIED AT 400J/PER N w <br /> N 12. Bare and/or disturbed soils shall remain uncovered and/or ACRE OF 10-20-20(10 LB. PER 1,100 SQUARE F Z v <br /> No CB TY 1 unstabilized for no more than 2 days from October 1 through April FEET) OR EQUIVALENT. z F O W <br /> rNn p RIM=540.69 30, and for no more than 7 days from May 1 through September x U Z <br /> IE=538.69(12"CPP N,S) 30. w Q <br /> I11 <br /> a IE=538.98(6"PVC E) O ' K <br /> LL OK <br /> 0 p O <br /> N o <br /> U D_ <br /> T.E.S.C.LEGEND a„o. <br /> P„17-1004 os BRAW <br /> -X- SILT FENCE PER COE STD DET 214/BMP C233 <br /> 5/30/18 <br /> CLEARING LIMITS PER BMPC103 CALL 48 HOURS a�E_ 1"=20' <br /> 20 �0 BEFORE YOU DIG .� <br /> CONSTRUCTION ENTRANCE PER COE STD DWG 201 BMP C105 <br /> / HORizoNrn�scnrE 811 „„ <br />