My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1602 HEWITT AVE 2024-12-30
>
Address Records
>
HEWITT AVE
>
1602
>
1602 HEWITT AVE 2024-12-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 9:26:12 AM
Creation date
12/3/2024 9:45:53 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
1602
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Steps Hazards Controls C <br /> (CONT'D) Contamination from Ensure the operators and other personnel in the area are adequately protected from the noise through the use of <br /> sludge or cleaning hearing protection. Prior to starting transfer operations, vacuum trucks need to be grounded directly to the earth <br /> Triple-rinse product. or bonded to another object. <br /> and clean <br /> UST. All pumping system operations need to be bonded so that there is a continuous conductive path from the tanks <br /> through the hose and nozzle to the filtration equipment and grounded to dissipate stray currents to earth (ground). <br /> Prior to starting transfer operations, all pumping equipment must be grounded directly to the earth or bonded to <br /> another object that is inherently grounded (due to proper contact with the earth) such as a large storage tank or <br /> underground piping. <br /> Trips and falls over Run vacuum hoses out of walking and working areas. If hoses must be run in a walkway,then they must be secured M <br /> hoses and/or risk of so that they can't move unexpectedly. Use mechanical means to handle hoses and equipment whenever possible. <br /> jumping hoses. Get help to move hoses and equipment. <br /> Injury from pressure Ensure that pumping equipment, and loading/offloading sites are inspected prior to beginning the work to assure <br /> washer. safe operations. Ensure that a properly equipped spill kit is mobilized to the site and that fire extinguishers are <br /> staged near the operations. Mobilize containment beneath pumping operations. <br /> Manufacturer recommendations shall be followed regarding safety and use of pressure washer.A solid stance shall <br /> be assumed and the spray gun shall be grasped with both hands to avoid injury if the gun kicks back before <br /> squeezing the spray gun trigger.ALWAYS point spray gun in safe direction and squeeze spray gun trigger,to release <br /> high pressure, every time the engine/motor is stopped.The trigger lock shall be engaged when not in use. <br /> Fill the UST Exposure to moving Ensure area is clear of overhead utilities. A backup alarm and spotter shall be used when backing up ready-mix <br /> with CDF. concrete truck. truck.Truck shall never back up faster than walking speed or moved with chutes attached. No workers are allowed <br /> between pump and mixer truck. <br /> Exposure to rotating Identify the location of the emergency-stop on the concrete mixer prior to starting pour. Do not touch any concrete <br /> mixer and other pump pipe clamps or hoses. Do not allow anyone to move, raise, lower, operate, adjust, or unfold the discharge <br /> moving parts. chute while backing towards the pump. Stop immediately if someone tries to make a chute adjustment. Do not <br /> attempt to grab foreign objects from the pump hopper while it is operating. Do not stand or allow anyone else to <br /> stand on the hopper grate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.