My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1602 HEWITT AVE 2024-12-30
>
Address Records
>
HEWITT AVE
>
1602
>
1602 HEWITT AVE 2024-12-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 9:26:12 AM
Creation date
12/3/2024 9:45:53 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
1602
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Steps Hazards Controls C <br /> Confirm Release of hazardous All electrical and mechanical systems shall be powered down and disconnected before remove of the fuel system. <br /> electrical energy or fuel Lockout/tagout/tryout shall be performed only by authorized employees. The authorized employee shall ensure <br /> shutdown product. that all energy isolating devices needed to control energy to, or within, the system are identified and that system <br /> and is shut down, isolated, blocked, and secured. Any system operated by a remotely controlled source will be <br /> complete completely isolated such that it cannot be operated by that or any other source. L <br /> mechanical <br /> disconnects. The authorized employee shall affix lock and tag to each energy isolating device. When there is a possibility of re- <br /> accumulation of stored energy to a hazardous level, verification of isolation shall be continued until the energy <br /> control procedure is complete. Before starting work on systems that have been locked/tagged out,the authorized <br /> individual shall verify that isolation and de-energization of the system have successfully been accomplished. <br /> Demolish Damage to existing All underground lines/utilities shall be located and protected from damage or displacement. Utility companies shall <br /> and remove utilities. be contacted to locate and mark the locations and,if they so desire,direct or assist with protecting the underground <br /> asphalt. installations. <br /> Injury from Operator must wear face shield and gloves in addition to standard PPE. Ensure guards are well maintained and <br /> sawcutting machine. properly positioned, blades are straight and tight, and that the right blade is being used. Ensure the saw doesn't <br /> exceed that blade speed and that the blade is turning in the intended direction. Keep bystanders at least 100 feet <br /> away; ensure nearby workers have proper PPE. <br /> Exposure to silica In accordance with the OSHA Compliance Guide for Silica, concrete saw shall be equipped with integrated water <br /> during sawcutting. delivery system that continuously feeds water to the blade. Operate and maintain tool in accordance with M <br /> manufacturer's instructions to minimize dust emissions. For cutting operations being conducted outdoors for less <br /> than four hours, respirators are not required. For cutting operations being conducted outdoors for more than four <br /> hours, an air-purifying respirator with a protection factor of 10 (APF10) shall be worn. All workers wearing <br /> respirators shall be trained, medically evaluated, and fit-tested. <br /> Injury from Always wear safety glasses AND face shield when using jackhammer. Use the right PPE such as gloves, safety boots, <br /> jackhammer. ear protection and face protection at a minimum. You can also use vibration-damping gloves when using the <br /> jackhammer. Workers should be rotated as possible to eliminate fatigue from workers that could lead to accidents <br /> at the job site. Make sure your jackhammer has extra safety features such as a locking mechanism on the drill bit <br /> and a trigger control and automatic release. <br />
The URL can be used to link to this page
Your browser does not support the video tag.