My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE Utility Plans 2024-12-04
>
Address Records
>
FEDERAL AVE
>
2600
>
Utility Plans
>
2600 FEDERAL AVE Utility Plans 2024-12-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2024 8:25:06 AM
Creation date
12/4/2024 7:59:32 AM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Permit
PW2105-051
PW2112-023
Address Document Type
Utility Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LF <br />LINEAR FEET <br />OC <br />ON CENTER <br />SCH <br />LOC <br />LOCATION <br />OHW <br />ORDINARY HIGH WATER <br />SD <br />LS <br />LANDSIDE <br />OPP <br />OPPODITE <br />SDFM <br />MAT'LS <br />MATERIALS <br />OWS <br />OIL/WATER SEPARATOR <br />SDMH <br />ME <br />MATCH EXISTING <br />P <br />POWER <br />SF <br />MH <br />MANHOLE <br />PDA <br />PILE DRIVING ANALYZER <br />SIM <br />MHHW <br />MEAN HIGHER HIGH WATER <br />PP <br />POWER POLE <br />SNO PUD <br />MHW <br />MEAN HIGH WATER <br />PRV <br />PRESSURE REDUCING VALVE <br />SOW <br />MIN <br />MINIMUM <br />PSI <br />POUNDS PER SQUARE INCH <br />SS <br />MLLW <br />MEAN LOWER LOW WATER <br />PVC <br />POLYVINYL CHLORIDE <br />SSFM <br />MLW <br />MEAN LOW WATER <br />PVMT <br />PAVEMENT <br />SSMH <br />MSRC <br />MARINE SPILL RESPONSE CORPORATION <br />REF <br />REFERENCE DIMENSION <br />SSS <br />MTCA <br />MODEL TOXICS CONTROL ACT <br />REINF <br />REINFORCEMENT <br />ST <br />MW <br />MONITORING WELL <br />REPL <br />REPLACE <br />STD <br />NIC <br />NOT IN CONTRACT <br />REQ'D <br />REQUIRED <br />SWPPP <br />NT <br />NORTON TERMINAL <br />REV <br />REVISION <br />SYMM <br />NTS <br />NOT TO SCALE <br />RD <br />ROAD <br />R.O.W. <br />RIGHT—OF—WAY <br />RPBA <br />REDUCED PRESSURE BACKFLOW ASSEMBLY <br />RW <br />RETAINING WALL <br />GENERAL NOTES: <br />1. ALL CONSTRUCTION SHALL CONFORM TO THESE PLANS AND SPECIFICATIONS AND THE <br />CURRENT VERSION OF THE CITY OF EVERETT STANDARDS. <br />2. CONTRACTOR SHALL VERIFY ALL LEVELS, DIMENSIONS, AND EXISTING CONDITIONS IN THE <br />FIELD BEFORE PROCEEDING. CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY <br />DISCREPANCIES OR FIELD CHANGES PRIOR TO INSTALLATION OR FABRICATION. IN CASE <br />OF DISCREPANCIES BETWEEN THE EXISTING CONDITIONS AND THE PLANS, THE <br />CONTRACTOR SHALL OBTAIN DIRECTION FROM THE ENGINEER BEFORE PROCEEDING. <br />DIMENSIONS AND CALLOUTS NOTED AS PLUS OR MINUS (f) OR (REF) INDICATE <br />UNVERIFIED DIMENSIONS AND ARE APPROXIMATE. NOTIFY THE ENGINEER IMMEDIATELY OF <br />CONFLICTS OR EXCESSIVE VARIATIONS FROM AS INDICATED. NOTED DIMENSIONS TAKE <br />PRECEDENCE OVER SCALED DIMENSIONS — DO NOT SCALE THE PLANS. <br />3. ALL LOCATIONS <br />OF EXISTING STRUCTURES AND UTILITIES SHOWN <br />HEREIN HAVE BEEN <br />OBTAINED FROM <br />AVAILABLE RECORDS AND SHOULD, THEREFORE, <br />BE CONSIDERED <br />APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE RESPONSIBILITY OF THE <br />CONTRACTOR TO <br />INDEPENDENTLY VERIFY THE ACCURACY OF ALL <br />UTILITY LOCATIONS <br />SHOWN AND TO <br />FURTHER DISCOVER AND AVOID OTHER UTILITIES <br />NOT SHOWN HEREIN <br />WHICH MAY BE <br />AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE CONTRACTOR <br />SHALL POTHOLE <br />OR OTHERWISE CONFIRM EXISTING CONDITIONS, <br />SPECIFICALLY PIPE SIZES <br />PRIOR TO CONSTRUCTION, <br />AND BRING ANY CONFLICTS BETWEEN <br />EXISTING CONDITIONS <br />AND NEW WORK <br />TO THE ENGINEER'S ATTENTION. <br />4. THE EXISTING NORTON TERMINAL SITE UTILITIES HAVE UNDERGONE NUMEROUS REPAIR <br />AND UPGRADE PROJECTS SINCE THE TIME OF THE ORIGINAL CONSTRUCTION. THESE <br />REPAIRS MAY NOT ALL BE REFLECTED IN THESE CONTRACT DOCUMENTS. REFERENCE <br />DRAWINGS FOR THESE CONTRACTS ARE AVAILABLE FROM THE PORT OF EVERETT. IT IS <br />ANTICIPATED THAT MOST SITE UTILITIES WERE DEMOLISHED OR ABANDONED DURING <br />DEMOLITION OF FORMER KIMBERLY—CLARK SITE. <br />5. A COPY OF THE PLANS SHALL BE ON —SITE WHENEVER CONSTRUCTION IS IN PROGRESS. <br />THROUGHOUT THE PROGRESS OF THE WORK OF THIS CONTRACT, THE CONTRACTOR <br />SHALL MAINTAIN AN ACCURATE RECORD OF ALL CHANGES IN THE CONTRACT DOCUMENTS. <br />UPON THE COMPLETION OF THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE ONE <br />COMPLETE SET OF CONTRACTOR REDLINE AS —BUILT TO THE PORT OF EVERETT. <br />6. THE CONTRACTOR SHALL LOCATE ALL UTILITIES WITHIN THE PROJECT SITE PRIOR TO <br />WORK. CONTRACTOR SHALL CONTACT 811 "CALL BEFORE YOU DIG" AND AN INDEPENDENT <br />LOCATING SERVICE TO LOCATE ALL UTILITIES AT LEAST 48 HOURS PRIOR TO WORK. <br />7. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS OF EXISTING STRUCTURES AND <br />OTHER FEATURES THAT MAY IMPACT THE WORK. CONTRACTOR SHALL BRING ANY <br />CONFLICTS TO THE ENGINEER'S ATTENTION PRIOR TO BEGINNING AFFECTED WORK. <br />8. ANY DAMAGE TO EXISTING UTILITIES, OTHER FACILITIES OR EQUIPMENT DUE TO THE <br />CONTRACTOR'S NEGLIGENCE, EXCEPT FOR ITEMS DESIGNATED FOR DEMOLITION, SHALL BE <br />PROMPTLY REPAIRED BY THE CONTRACTOR AT HIS EXPENSE. THIS INCLUDES ITEMS <br />OUTSIDE THE WORK AREA AND WITHIN THE PORT OF EVERETT PROPERTY THAT ARE <br />DAMAGED BY CONSTRUCTION ACTIVITIES DURING EXECUTION OF THIS CONTRACT. <br />9. PRIOR TO LAYING PIPE, THE CONTRACTOR SHALL EXPOSE EXISTING WATER, STORM WATER <br />AND SEWER PIPING AT CONNECTION POINTS TO VERIFY THAT FIELD CONDITIONS MATCH <br />INFORMATION SHOWN ON THE PLANS, SPECIFICALLY THE LOCATION, ELEVATION, DIAMETER, <br />AND MATERIAL OF EXISTING PIPE. CONTRACTOR SHALL CONTACT THE ENGINEER IF <br />DISCREPANCIES ARE DISCOVERED. <br />10. ALL ACTIVATION AND DEACTIVATION OF UTILITIES SHALL BE COORDINATED WITH THE <br />UTILITY AND THE ENGINEER IN ADVANCE. PROVIDE A MINIMUM OF 3 DAYS ADVANCE <br />WRITTEN NOTICE TO THE UTILITY AND ENGINEER. <br />Port of <br />EVERETT <br />P 0 BOX 538 <br />EVERETT, WA 95206 <br />(425) 259-3164 <br />1601 5th Avenue, Suite 1300 <br />Seattle, Washington 98101 <br />(206) 382-0600 Fax (206) 382-0500 <br />PROJECT NO. 1600120 <br />SCHEDULE <br />T <br />TELECOMMUNICATION UTILITY <br />STORM DRAIN <br />T&B <br />TOP AND BOTTOM <br />STORM DRAIN FORCE MAIN <br />TB <br />THRUST BLOCK <br />STORM DRAIN MANHOLE <br />TC <br />TOP OF CURB <br />STORM FILTER <br />TD <br />TRENCH DRAIN <br />SIMILAR <br />TYP <br />TYPICAL <br />SNOHOMISH COUNTY PUBLIC UTILITY DISTRICT <br />U <br />UNKNOWN UTILITY <br />SCOPE OF WORK <br />UGP <br />UNDERGROUND POWER <br />SANITARY SEWER, STAINLESS STEEL <br />UNC <br />UNIFIED NATIONAL COARSE <br />SANITARY SEWER FORCE MAIN <br />UNO <br />UNLESS NOTED OTHERWISE <br />SANITARY SEWER MANHOLE <br />VEG <br />VEGETATION <br />SIDE SANITARY SEWER <br />VERT <br />VERTICAL <br />STREET <br />VIF <br />VERIFY IN FIELD <br />STANDARD <br />W <br />WATER <br />STORMWATER POLLUTION PREVENTION PLAN <br />WHS <br />WELDED HEADED STUD <br />SYMMETRIC <br />W/ <br />WITH <br />W/0 <br />WITHOUT <br />WABO <br />WASHINGTON ASSOCIATION OF <br />BUILDING OFFICIALS <br />WM <br />WATER MAIN <br />WS <br />WATERSIDE <br />11. SHORING AND EXCAVATION SHALL BE IN ACCORDANCE WITH STATE AND FEDERAL <br />REQUIREMENTS. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. <br />12. THE CONTRACTOR SHALL KEEP ALL STREETS AND VEHICULAR TRAFFIC AREAS USED FOR <br />THIS WORK CLEAN AT ALL TIMES, SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. <br />13. CONTRACTOR IS RESPONSIBLE FOR ANY TRAFFIC CONTROLS REQUIRED DURING THE <br />DURATION OF THIS PROJECT, PER CONTRACTOR'S OPERATION. ALL TRAFFIC CONTROL <br />SHALL BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. <br />14. CONTRACTOR SHALL BE AWARE OF FACILITY OPERATION REQUIREMENTS AND SHALL <br />COORDINATE ACCESS TO THE SITE WITH THE ENGINEER. CONTRACTOR SHALL MAINTAIN <br />ADJACENT TENANT ACCESS AT ALL TIMES AND SHALL NOT RESTRICT TENANT OPERATIONS <br />WITHOUT APPROVAL OF THE ENGINEER. <br />15. THE CONTRACTOR SHALL PLACE CONSTRUCTION DEBRIS CONTROL DEVICES, BOOMS, <br />TARPAULINS AND OTHER DEVICES AS NECESSARY TO PREVENT DEBRIS FROM ENTERING <br />THE WATER, AND AIR BORNE MATERIALS FROM LEAVING THE IMMEDIATE VICINITY OF THE <br />SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP OF ANY MATERIALS <br />DEPOSITED OUTSIDE THE WORK AREA. <br />16. MAINTAIN UTILITY SERVICE TO EXISTING BUILDINGS, UTILITIES AND FIRE HYDRANTS DURING <br />CONSTRUCTION UNLESS NOTED OTHERWISE OR APPROVED BY THE ENGINEER. INSTALL <br />NEW UTILITY LINES TO POINTS OF CONNECTION TO EXISTING UTILITY LINE PRIOR TO <br />DEMOLITION OF THE EXISTING LINES, UNLESS NOTED OTHERWISE. WATER SERVICE <br />SHUTDOWNS WILL BE LIMITED TO 2 HOURS FOR EACH UTILITY CROSSOVER AND SHALL <br />BE COORDINATED WITH THE ENGINEER. POWER AND COMMUNICATION SHUTDOWNS SHALL <br />BE LIMITED AND SHALL BE COORDINATED WITH THE ENGINEER. SEE SPECIFICATIONS FOR <br />FURTHER SHUTDOWN REQUIREMENTS. <br />17. CONTRACTOR —INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE PORT FOR <br />APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES SHOWN ON SHOP <br />DRAWINGS ONLY WILL NOT SATISFY THIS REQUIREMENT. <br />18. THE CONTRACTOR SHALL TAKE NECESSARY MEASURES TO PREVENT INTERRUPTION OF <br />OPERATIONS AND PROTECT ALL EXISTING SURFACES/STRUCTURES TO REMAIN AT THE <br />FACILITY DURING CONSTRUCTION. DETAILS SHALL BE PRESENTED IN THE CONTRACTOR'S <br />WORK PLAN. <br />19. PROJECT NORTH AS INDICATED ON THESE DRAWINGS IS FOR CONVERSATIONAL GENERAL <br />DIRECTIONAL REFERENCE. BEARINGS NOTES ON DRAWINGS ARE RELATIVE TO TRUE NORTH. <br />20. CONTRACTOR SHALL BE RESPONSIBLE FOR ERECTION STABILITY AND TEMPORARY <br />SUPPORT AS NECESSARY. DETAILED CONSTRUCTION PLANS SHALL BE PREPARED BY THE <br />CONTRACTOR AND APPROVED BY THE PORT PRIOR TO MOBILIZATION. <br />21. SEE ALSO STRUCTURAL GENERAL NOTES ON SHEETS S1.1 —S1 .3. <br />22. NORTON TERMINAL IS ON THE WASHINGTON STATE DEPARTMENT OF ECOLOGY LIST OF <br />CONTAMINATED SITES AND IS CURRENTLY IN THE MTCA CLEANUP PROCESS. REFER TO <br />THE SOIL AND GROUNDWATER MANAGEMENT PLAN IN APPENDIX B OF THE SPECIFICATIONS <br />FOR ADDITIONAL INFORMATION. <br />23. SEE SHEET G1.3 FOR UNDERGROUND STRUCTURE LOADING CRITERIA REQUIREMENTS. <br />0 <br />07/05/2023 <br />NW <br />RECORD DRAWING <br />0 <br />06/21/2021 <br />NW <br />ISSUED FOR BID <br />DO <br />05/07/2021 <br />NW <br />FOR CITY REVIEW <br />N0, <br />DATE <br />BY <br />REVISION <br />N0, DATE BY <br />REVISION <br />LEGEND: <br />® <br />BORE HOLE <br />EXISTING CONTOUR <br />® <br />MONUMENT WELL <br />x x X— <br />CLF <br />EXISTING CHAINLINK FENCE <br />D4 <br />WATER VALVE <br />OHw <br />OHw <br />EXISTING OVERHEAD WIRE LINE <br />WATER SPIGOT <br />SS <br />ss <br />EXISTING SANITARY SEWER LINE <br />O <br />SANITARY SEWER MANHOLE <br />® <br />STORM DRAIN MANHOLE <br />uGP <br />UGP <br />EXISTING UNDERGROUND POWER LINE <br />w <br />w <br />EXISTING WATER LINE <br />o <br />TELEPHONE RISER <br />F❑ <br />Fo <br />EXISTING FIBER OPTIC <br />E— <br />GUY ANCHOR <br />sn <br />so <br />EXISTING STORM DRAIN <br />®EM <br />ELECTRIC METER <br />LUMINARE <br />BP <br />eP <br />BURIED POWER LINE <br />EXISTING PIPE SLOPE <br />T T <br />T <br />TELEPHONE LINE <br />W <br />w <br />WATER LINE <br />� <br />PROPOSED PIPE SLOPE DIRECTION <br />— — <br />PROPERTY LINE <br />— <br />EXISTING GRADE SLOPE DIRECTION <br />_ _ <br />LEASE LIMIT <br />PROPOSED GRADE SLOPE DIRECTION <br />EASEMENT <br />p <br />FIRE HYDRANT <br />W W <br />WATER <br />U <br />LIGHT POLE <br />ss ss <br />SEWER <br />3n <br />STORMWATER <br />TRENCH DRAIN <br />FENCE <br />PROPOSED CONTOUR <br />WHERE SECTION <br />OR ELEVATION <br />IS CALLED FROM <br />REFERENCE SYMBOLS: <br />SECTION OR ELEVATION # DETAIL # <br />1 <br />G1.0 G1.1 <br />SHEET # �� <br />WHERE DETAIL SHEET # <br />WHERE DETAIL <br />—SHEET # IS CALLED FROM <br />OCCURS <br />WHERE SECTION <br />OR ELEVATION OCCURS <br />SECTION/DETAIL <br />X I X SCALE: 1 /2" = 1'-0" <br />PROJECT ENGINEER: <br />SCALE: <br />RECORD CONDITIONS <br />N. WATSON <br />AS SHOWN <br />ILLUSTRATED IN THESE <br />PLANS REFLECT <br />DESIGNED BY: <br />J. BECKER <br />DATE, <br />05/07/2021 <br />INFORMATION <br />PROVIDED BY THE <br />DRAWN BY: <br />CHECKED BY: <br />K. EDWARDS, D. YU <br />N. WATSON <br />CONTRACTOR. RECORD <br />CONDITIONS WERE NOT <br />APPROVED BY: <br />VERIFIED BY ENGINEER. <br />MI 2 <br />/ PROJECT <br />NORTH <br />NORTH ARROW INDICATES <br />TRUE NORTH <br />RECORD DRAWING <br />PORT OF EVERETT <br />NORTON TERMINAL DEVELOPMENT <br />& MTCA 3RD INTERIM ACTION <br />GENERAL NOTES AND LEGEND <br />VERT DATUM: NAVD 88 <br />CONV TO MLLW = NAVD88+2.03 <br />HORZ DATUM: NAD 83/91 <br />IF SHEET IS LESS THAN 2204 <br />REDUCE SCALE ACCORDINGLY <br />J DWG. NO. G1.2 <br />CIP NO. <br />1-8-900-05 <br />PROJECT <br />NO. MT—NT-2021 —02.2 <br />SHEET NO. 03 OF 150 <br />a <br />U <br />LU <br />
The URL can be used to link to this page
Your browser does not support the video tag.