Laserfiche WebLink
Mr. r.0 room W�. <br />■ <br />ON <br />■ EX CONTAINER STORAGE PAD <br />IN <br />ON <br />ON <br />■ WAREHOUSE TENANT LEASEHOLD <br />■ <br />ON <br />■ <br />LLj \ <br />� � E <br />r 5' WIDE CONCRETE <br />■ \>> C3.8 S 1 .3 GUTTER, I <br />Eh ■ \ - - NT-CB-06 <br />RIM=19.90 <br />Ix <br />_ - _- <br />J ` r�.�0.50%- <br />--_20.13 FL <br />36 , 26.21 <br />\ ` � ,� ✓ IIx <br />z( / I1111 21.20 20.90 64 <br />51 I 0.4' <br />0 20.90 65 <br />HIGH -MAST LIGHT POLE & FIRE HYDRAN>YP� <br />: : <br />I:Ym� NOTES <br />- - - - -I 18.13 TOP 18.13 TOP D 1. SEAL ALL LONGITUDINAL AND TRANSVERSE <br />x NT-HML-06 17.71 FG 17.71 FG JOINTS BETWEEN NEW REPLACEMENT AND <br />7.70 <br />38 - - - - - - - - - - - - - 18.13 TOP EXISTING PAVEMENTS PER SPECIFICATIONS. <br />G III 118.13 TOP <br />2. ADJUST EXISTING MANHOLE, HANDHOLE, INLET <br />II x o 17.80 FG 17.80 FG RIM, AND/OR VALVE COVER TO GRADE PRIOR <br />I ELECTRICAL EQUIPMENT PAD TRE <br />1 TO PAVING. PROTECT -IN -PLACE. <br />I >C /o __j � / �-✓ <br />Illlx 41 <br />00 LEGEND <br />(I RIDGELINE-19.51 <br />2H:1V HMA PAVEMENT, 9" HMA OVER 12„ <br />lu � CRBC SEE SECTION A ON C3.2 11 x <br />17.30 FINISH GRADE SPOT ELEVATION <br />IIII �� ( � ■ <br />% FINISH GRADE SLOPE <br />PAVEMENT HORIZONTAL <br />CONTROL POINT <br />I x \ V ■ (SEE C3.22 FOR PAVEMENT <br />HORIZONTAL CONTROL SCHEDULE) <br />■ <br />I x \ <br />I TRENCH DRAIN, TYP B <br />r18*08 TRENCH DRAIN x NT =18.0310 <br />RIM=18.03HIGH POINT <br />RIM=18.03 ■ <br />I <br />\ 18.08 I 18.08 ■ �^ <br />I C3.8 C3.14 18.08 ■ <br />■ L�JI <br />L' <br />NT-CB-05 - J � � I I I <br />L RIM=19.90 / I x b� �- ■ <br />�► ^ J I I l <br />/I ■ <br />20.14 HP - - - 16.27E EG 111 x NT-CB-04 U <br />- - - - - J 20.21 RIM=19.89 <br />-0.50%.......::..... 0.5ID -0.50% ,,...... <br />o N <br />37 20.13 N fH%11------�--- �\ ■ (� c o <br />E <br />C3.8 S 1 .3 <br />/ \ / CONCRETE GUTTER, TYP C3.8 ■ <br />RIDGELINE=20.90 / S 1.3 ■ <br />66 20.90 HP �s0�c GUTTER, . 20.90 HP I/ EYg P <br />n 5n% n 5n% n 5n% n 5n% f� H <br />N 21.60 21.60 21.60 It <br />21.60 <br />■ 1 21.60 67 <br />1 <br />VERT DATUM: NAVD 88 <br />■ J _ ~ ■ VERTCONV TO MLLW = NAVD88+2.03 <br />-� <br />HORZ DATUM: NAD 83/91 <br />IF SHEET IS LESS THAN 2204 <br />REDUCE SCALE ACCORDINGLY <br />i <br />Eh 07/05/2023 NW RECORD DRAWING RECORD CONDITIONS <br />PROJECT ENGINEER: SCALE: PORT OF EVERETT DWG. NO. <br />N. WATSON 1" = 30' C3�8 <br />12/02/2021 JB DELETE ECOLOGY BLOCK WALL, ILLUSTRATED IN THESE <br />Port Of ADD EX WITS GRAVEL PAD PLANS REFLECT DESIGNED BY DATE,NORTON TERMINAL DEVELOPMENT <br />caNTouRs AND UPDATE FINAL J. BECKER 05/07/2021 cIP No. <br />EVERETT REVISE PAVEMENT COORDINATES INFORMATION 1-8-900-05 <br />0 11/11/2021 NW REVISED PER RFIo3o PROVIDED BY THE DRAWN BY CHECKED BY: & MTCA 3RD INTERIM ACTION <br />1601 5th Avenue, Suite 1300 21 021 Nw ssuEo FOR BIo K. EDWARDS, D. YU N. WATSON PROJECT <br />P O BOX 538 0 os / /` CONTRACTOR. RECORD CONDITIONS WERE NOT GRADING DETAIL PLAN N0. MT-NT-2021 -02.2 <br />EVERETT, WA 98206 <br />Seattle, Washington 98101 A 05/07/2021 NW FOR CITY REVIEW APPROVED BY: <br />(206) 382-0600 Fax (206) 382-0500 (425) 259-3I64 PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION VERIFIED BY ENGINEER. (5 OF 7) SHEET No. 36 OF 150 <br />Z <br />a <br />U <br />W <br />N <br />w <br />