My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE Utility Plans 2024-12-04
>
Address Records
>
FEDERAL AVE
>
2600
>
Utility Plans
>
2600 FEDERAL AVE Utility Plans 2024-12-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2024 8:25:06 AM
Creation date
12/4/2024 7:59:32 AM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Permit
PW2105-051
PW2112-023
Address Document Type
Utility Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES: <br />UPSTREAM STORM <br />CONVEYANCE <br />SYSTEM <br />Port o, f <br />EVERETT <br />P,0 BOX 538 <br />EVERETT, WA 98206 <br />(425) 259-3164 <br />1601 5th Avenue, Suite 1300 <br />Seattle, Washington 98101 <br />(206) 382-0600 Fax (206) 382-0500 <br />PROJECT NO.1600120 <br />A2 <br />07/05/202J <br />NW <br />RECORD DRAWING <br />0 <br />06/21/2021 <br />NW <br />ISSUED FOR BID <br />DO <br />05/07/2021 <br />NW <br />FOR CITY REVIEW <br />NO. I DATE I BY <br />REVISION <br />NO. I DATE I BY <br />REVISION <br />RECORD CONDITIONS <br />ILLUSTRATED IN THESE <br />PLANS REFLECT <br />INFORMATION <br />PROVIDED BY THE <br />CONTRACTOR. RECORD <br />CONDITIONS WERE NO - <br />VERIFIED BY ENGINEER. <br />PROJECT ENGINEER <br />N. WATSON <br />DESIGNED BY: <br />J. BECKER <br />SCALE: <br />AS SHOWN <br />DATE: <br />05/07/2021 <br />DRAWN BY: CHECKED BY: <br />K. EDWARDS, D. YU N. WATSON <br />APPROVED BY: <br />;EATMENT CAPACITY <br />CFS (GPM) <br />3.57 (1,600) <br />1. HIGH FLOW BYPASS AND LIFT STATION ARE COMBINED INTO A SINGLE <br />STRUCTURE. <br />2. SEE SHEET C4.14 FOR HIGH FLOW BYPASS/LIFT STATION DIMENSIONS, <br />ORIFICE SIZE, AND CONFIGURATION. <br />3. STORMWATER CONVEYANCE SYSTEM IS TIDALLY INFLUENCED. CHECK <br />VALVES PREVENT SEA WATER FROM ENTERING THE STORMWATER <br />TREATMENT SYSTEM VIA THE HIGH FLOW BYPASS/LIFT STATION. <br />4. BASIN AREA INCLUDES FUTURE MARITIME TENANT LEASEHOLD AND <br />WAREHOUSE TENANT LEASEHOLD NORTH YARD. <br />LEGEND: <br />DBELOW GROUND <br />FLOW DIRECTION <br />►ABOVE GROUND <br />FLOW DIRECTION <br />EXISTING ABOVE <br />► <br />GROUND FLOW <br />DIRECTION <br />RECORD DRAWING <br />PORT OF EVERETT <br />NORTON TERMINAL DEVELOPMENT <br />& MTCA 3RD INTERIM ACTION <br />AIts] :i'LVA ►y�Ti_�1:4Oka 1»r_1i161 <br />:y3•y=IOki *_1VTAI 1m9K•INTM11r_tel:�_��I <br />CALL 48 HOURS <br />BEFORE YOU DIG <br />DIAL 811 <br />VERT DATUM: NAVD <br />CONV TO MLLW = <br />HORZ DATUM: NAD <br />88 <br />NAVD88+2.03 <br />83/91 <br />IF SHEET IS LESS THAN 2204 <br />REDUCE SCALE ACCORDINGLY <br />DWG. NO. C4.12 <br />CIP NO. <br />1-8-900-05 <br />PROJECT <br />NO. MT-NT-2021 -02.2 <br />SHEET NO. 56 OF 150 <br />Z <br />a <br />U <br />W <br />w <br />
The URL can be used to link to this page
Your browser does not support the video tag.