Laserfiche WebLink
TRUCK TRAFFIC X — TRUCK TRAFFIC — v NORTH EBEY J?7 `�� KEY NOTES <br />IN FROM NORTH OUT TO NORTH <br />�x TRUCK TRAFFIC O1 THE MAJORITY OF THE SITE WAS BACKFILLED <br />x \\ TO AND FROM WITH APPROXIMATELY 1 TO 5 FEET OF SAND <br />..................... <br />NORTON AVENUE a STF 1-5 BOTH DIRECTIONS BACKFILL IN FALL 2020 DURING THE 2ND <br />PRIESTPRIE <br />ST <br />INTERIM ACTION CLEANUP. THE CONTRACTOR <br />POINT /� �09 NORTH EBEY SHALL BE AWARE THAT THERE IS THE <br />g r/ T S OU POTENTIAL THAT SOME CONSTRUCTION <br />/ XI SMITH ISLAND G2 �N EQUIPMENT OR TRUCKS MAY EXPERIENCE <br />POOR TRACTION OR GET STUCK DRIVING OVER <br />n THE EXISTING SAND IN PORTIONS OF THE o <br />/O2 EX 0 SITE. SEE SPECIFICATIONS FOR ADDITIONAL <br />c� NORTH SPENCER <br />HAUL ROAD I NORTH BIRINGER FARM MID <br />I SITE INFORMATION. <br />/ GATE <br />O EBEY O SEPARATE PRELOAD CONTRACT WILL LEAVE A <br />/ _ co GRAVEL HAUL ROAD FROM FEDERAL AVENUE <br />JETTY m TO THE PRELOAD THAT WILL BE AVAILABLE <br />/ ISLAND FOR USE BY TGRAVEL ROAD IS CONTRACTOR. TING <br />ALSO AVAILABLE AT THE <br />PORT GARDNER w — — NORTH END. <br />� <br />EAST WATERWAY <br />lI x� Q o ��� POINT MID O THE EENGINEER, WTHE CONTRACTOR PAPPROVED BY <br />SHALL <br />PENC LOCATE ALL STOCKPILES AND THEIR <br />CONSTRUCTION TRAILER WITHIN THE WORK <br />/ _W I! OCij = MAMUDBY MAULSBY sties AREA LIMITS SHOWN. SEE SHEET C1.1 FOR <br />x I SWAMP FURTHER REQUIREMENTS. <br />EX I Q = FLAT '� OTTER ISLAND <br />/ W z 4 CONTRACTOR MAY SHARE CONSTRUCTION <br />BARGE �� IS II BOAT 0 <br />Z T ACCESS POINTS WITH OTHER CONTRACTORS. <br />x— JETTY <br />DOCK / ©PRELOAD AREA I Of :1 ISLAND RAMP > � UNION SEE SHEET G5.1 AND SPECIFICATIONS FOR <br />SLOUGH FURTHER DE <br />BERMTAILS. <br />-Mi 1 12th z <br />STREET < O5 CONTRACTOR SHALL PROVIDE TRAFFIC <br />® I MARINA SOUT EBEY CONTROL AND MAINTAIN ONE LANE OF <br />b` I II I ``' TRAFFIC DURING ALL WORK WITHIN THE <br />®� MARINA FEDERAL AVENUE ROW. THIS WILL BE <br />I <br />1 3 X EVERETT EXISTING <br />EBEY TENNANTS ALONGEQUIRED TOAINTAIN FED RALCCESS AVENUEO(EVERETT <br />SLOUGH SHIP REPAIR, DUNLAP AND MAIN TERMINAL <br />PROJECT SITE P R O J E C T <br />NAVAL 19TH ST. SOUTH SPE CER TRAFFIC) AND OTHER CONSTRUCTION <br />' - -- SITE STATION <br />I EVERETT STEAMBOAT PROJECTS AS SHOWN. <br />0SLOUGH <br />r a © CONTRACTOR SHALL PROVIDE ACCESS TO <br />O2 HAUL w m o ,� PORT SURVEYORS TO THE SETTLEMENT <br />ROAD C1 w o� o MONITORING POINTS ON THE PRELOAD <br />z Elf m J FOOTPRINT BETWEEN SEPTEMBER 2021 AND <br />g DEADMAN MARCH 2O22. <br />&Q o� SLOUGH <br />EVERETT O7 CONTRACTOR CAN UTILIZE EXISTING NORTH <br />411, CONSTRUCTION ACCESS SHOWN ON SHEET <br />w wW �P�� p3 MA LSB HEWITT C1.1 FOR <br />RETHE <br />EDMAJORITY <br />ENGOF THE <br />PROJECT <br />UTILIZE THE <br />_ FEDERAL HWY 2 UNTIL <br />3 NAVIGATION A� O FEDERAL NEW NORTH GATE ALIGNMENT. CHANNEL PACIFIC <br />/% ® NO CONTRACTOR TRAFFIC QUEUING IS <br />Ci = TRUCK TRAFFIC �� Q I D SLOUGHER ALLOWED ON EITHER TERMINAL AVENUE OR <br />OUT TO NORTH 11:)I FEDERAL AVENUE. <br />\ I I ��� w cif <br />EX WAREHOUSE TRUCK TRAFFIC TRUCK TRAFFIC <br />SOUTH FROM 1-5 r TO-5 <br />GATE i SOUTHBOUND <br />NORTHBOUND <br />x _ VERETT VENUE � <br />4 5 8 FEDERAL AVENUE P� 41 ST E LOELL <br />ITRUCK TRAFFIC IN FROM W / TRUCK TRAFFIC Q I <br />II w OUT TO SOUTH Q <br />NORTH AND SOUTH I z PIElf GEON <br />-� Mi MUKILTEO BLVD. c� - <br />TRUCK TRAFFIC <br />MAIN MARINE w o `" FROM 5 <br />TERMINAL TRAFFIC - PIGEON � No. 1 TRUCK TRAFFIC NORTHBOUND <br />TERMINAL AVENUE® o CREEK <br />2 U TO 1-5 <br />o SOUTHBOUND <br />i <br />SITE ACCESS PLAN TRUCK HAUL ROUTES <br />IF SHEET IS LESS THAN <br />N SCALE: 1 " = 200' N SCALE: 1 " = 2000' RECORD DRAWING REDUCE SCALE ACCORDINGLY 22X34 <br />PROJECT ENGINEER: SCALE: PORT OF EVERETT DWG. NO. <br />RECORD CONDITIONS N. WATSON AS SHOWN G4.1 <br />Port o, f ILANSREFLECTATED IN THESE NORTON TERMINAL DEVELOPMENT <br />PLANS REFLECT DESIGNED BY : DATE <br />INFORMATION J. BECKER 06/21 /2021 CIP NO. 1-8-900-05 <br />EVERETT PROVIDED BY THE DRAWN BY CHECKED BY & MTCA 3RD INTERIM ACTION <br />16015th Avenue, Suite 1300 0�/05/2023 NW RECORD DRAWING CONTRACTOR. RECORD K. EDWARDS, D. YU N. WATSON PROJECT <br />0 <br />P,0 BOX 538 Seattle, Washington98101 SITE ACCESS AND STOCKPILE PLAN <br />EVERETT, WA 98206 � os/2�/2oz� NW ISSUED FOR BID CONDITIONS WERE NOT APPROVED BY NO. MT—NT-2021 —02.2 <br />(206) 382-0600 Fax(206)382-0500 <br />(425) 259-3I64 PROJECT NO. 1600120 NO. DATE BY REVISION NO. DATE BY REVISION VERIFIED BY ENGINEER. SHEET No. 09 OF 150 <br />z <br />a <br />U <br />LU <br />