LEGEND
<br />SW 1/4, SEC. 07, TWP. 28N., R05E, W.M.
<br />ABBREVIATIONS
<br />CITY OF EVERETT STANDARD PLAN NOTES
<br />ROADWAY CENTERLINE
<br />PROJECT BOUNDARY LINE
<br />PROPERTY BOUNDARY LINE
<br />RIGHT-OF-WAY LINE
<br />EASEMENT LINE
<br />EDGE OF PAVEMENT LINE
<br />10' CONTOUR LINE
<br />2' CONTOUR LINE
<br />SANITARY SEWER MAIN
<br />WATER LINE
<br />FIRE SUPPLY
<br />STORM PIPE
<br />GAS LINE
<br />FENCE LINE
<br />POWER LINE
<br />BURIED POWER LINE
<br />UTILITY EASEMENT
<br />TELEPHONE LINE
<br />BURIED TELEPHONE LINE
<br />SWALE
<br />SILT FENCE
<br />TEMP. CONSTRUCTION FENCING
<br />CLEARING LIMIT
<br />SANITARY SEWER CLEAN OUT
<br />SANITARY SEWER MANHOLE
<br />STORM DRAIN CATCH BASIN - TYPE I
<br />STORM DRAIN CATCH BASIN - TYPE I
<br />STORM DRAIN INLET (NO CATCH)
<br />STORM DRAIN CULVERT
<br />WATER CAP/PLUG
<br />WATER COUPLING
<br />GUARD POST
<br />REDUCER
<br />THRUST BLOCK
<br />WATER METER
<br />2 NOZZLE FIRE HYDRANT
<br />3 NOZZLE FIRE HYDRANT
<br />FLANGE/BUND FL JOINT
<br />MECHANICAL JOINT
<br />PUSH-ON/HUB JOINT
<br />THREAD JOINT
<br />AIR RELIEF VALVE
<br />BLOW -OFF VALVE
<br />BUTTERFLY VALVE
<br />CHECK VALVE
<br />GATE/GENERAL VALVE
<br />PLUG VALVE
<br />GAS METER
<br />GAS VALVE
<br />PAD MOUNTED TRANSFORMER
<br />POWER VAULT
<br />TRANSMISSION TOWER (SCALEABLE)
<br />UTILITY POLE
<br />POWER POLE
<br />UTILITY POLE ANCHOR
<br />TELEPHONE RISER
<br />TELEPHONE VAULT
<br />BUS STOP
<br />MAIL BOX
<br />RIP RAP
<br />ROCKERY
<br />SHRUB
<br />GENERAL SIGN
<br />REGULATORY SIGN
<br />TREE (CONIFER)
<br />TREE (DECIDUOUS)
<br />YARD LIGHT
<br />BRIDGE/TUNNEL
<br />ASPHALT PAVEMENT
<br />CONCRETE
<br />15 V
<br />r whaPa below.
<br />:allh.r,.,.. ii
<br />EXISTING
<br />PROPOSED
<br />SS SS SS
<br />W
<br />F -F -F -F -F -F -F -F -
<br />SD
<br />GAS GAS
<br />X
<br />OP
<br />BP
<br />T
<br />BT
<br />-X-X-X-X-X-
<br />0 0 0
<br />0
<br />O •
<br />El
<br />o �
<br />A
<br />0 •
<br />D ►
<br />a
<br />A 1R
<br />C C
<br />C C
<br />i'
<br />P T
<br />� W
<br />N N
<br />� N
<br />0 0
<br />� ql
<br />0 ❑�
<br />o ■
<br />0 0
<br />eus eus
<br />o �
<br />01
<br />i
<br />� 1
<br />0 0
<br />0
<br />AC
<br />ASPHALT CONCRETE PAVEMENT
<br />LCPE
<br />LINED CORRUGATED POLYETHYLENE PIPE
<br />AP
<br />ANGLE POINT
<br />LF
<br />LINEAL FEET
<br />ATB
<br />ASPHALT TREATED BASE
<br />LT
<br />LEFT
<br />AVE
<br />AVENUE
<br />LUI
<br />LAND USE INSPECTOR
<br />BCR
<br />BEGIN CURB RETURN
<br />MAX.
<br />MAXIMUM
<br />BOC
<br />BACK OF CURB
<br />MSE
<br />MECHANICALLY STABILIZED EARTH
<br />BOW
<br />BOTTOM OF WALL
<br />MH
<br />MANHOLE
<br />CASP
<br />CRITICAL AREA SITE PLAN
<br />MIN.
<br />MINIMUM
<br />q
<br />CENTERLINE
<br />MJ
<br />MECHANICAL JOINT
<br />CB
<br />CATCH BASIN
<br />N
<br />NORTH
<br />CDF
<br />CONTROLLED DENSITY FILL
<br />NIC
<br />NOT IN CONTRACT
<br />CMP
<br />CORRUGATED METAL PIPE
<br />0. C.
<br />ON CENTER
<br />COE
<br />CITY OF EVERETT
<br />PC
<br />POINT OF CURVATURE
<br />CONC.
<br />CONCRETE
<br />PE
<br />PLAIN END
<br />CONN.
<br />CONNECTION
<br />PI
<br />POINT OF INTERSECTION
<br />CONT,
<br />CONTINUOUS
<br />PL
<br />PLACE
<br />CPP
<br />CORRUGATED POLYETHYLENE PIPE
<br />PT
<br />POINT OF TANGENCY
<br />(W/SMOOTH INTERIOR WALLS)
<br />Pw
<br />POINT OF VERTICAL INTERSECTION
<br />CSBC
<br />CCRRUSHED SURFACING BASE COURSE
<br />PUE
<br />PUBLIC UTILITY EASEMENT
<br />CSTC
<br />CRUSHED SURFACING TOP COURSE
<br />PWS
<br />PUBLIC WORKS STANDARDS
<br />DIA.
<br />DIAMETER
<br />REQb.
<br />REQUIRED
<br />DI
<br />DUCTILE IRON
<br />ROW
<br />RIGHT-OF-WAY
<br />DW
<br />DRIVEWAY
<br />RT
<br />RIGHT
<br />E
<br />EAST
<br />S
<br />SOUTH
<br />ECR
<br />END CURB RETURN
<br />SD
<br />STORM DRAIN
<br />EDDS
<br />ENGINEERING DESIGN AND
<br />SP
<br />SPACE
<br />DEVELOPMENT STANDARDS
<br />SS
<br />SANITARY SEWER
<br />EL.
<br />ELEVATION
<br />SSD
<br />STOPPING SIGHT DISTANCE
<br />EDP
<br />EDGE OF PAVEMENT
<br />STA
<br />STATION
<br />ESC
<br />EROSION AND SEDIMENT CONTROL
<br />TESC
<br />TEMPORARY EROSION AND SEDIMENT CONTROL
<br />ESD
<br />ENTERING SIGHT DISTANCE
<br />TOC
<br />TOP OF CURB
<br />ESMT.
<br />EASEMENT
<br />TYR
<br />TYPICAL
<br />EVA
<br />EMERGENCY VEHICLE ACCESS
<br />TBW
<br />TOP BACK OF WALK
<br />EXIST.
<br />EXISTING
<br />TOW
<br />TOP OF WALL
<br />FL
<br />FLOW LINE
<br />UNO
<br />UNLESS NOTED OTHERWISE
<br />FL.
<br />FLANGE
<br />VERT.
<br />VERTICAL
<br />FOC
<br />FACE OF CURB
<br />WSDOT
<br />WASHINGTON DEPT. OF TRANSPORTATION
<br />HORIZ
<br />HORIZONTAL
<br />W
<br />WITH
<br />IE
<br />INVERT ELEVATION
<br />w
<br />WEST
<br />INT
<br />INTERSECTION
<br />WS
<br />WATER SERVICE
<br />GENERAL PROJECT NOTES
<br />1. ALL WORKMANSHIP, METHODS AND MATERIALS FOR THIS PROJECT SHALL CONFORM TO THE LATEST EDITION
<br />OF THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION AS PRODUCED BY
<br />WSDOT AND THE WASHINGTON STATE CHAPTER OF THE APWA; CITY OF EVERETT DESIGN AND CONSTRUCTION
<br />STANDARDS AND SPECIFICATIONS FOR DEVELOPMENT AND ANY SPECIAL PROVISIONS PROVIDED BY THESE
<br />PLANS OR OTHER CONTRACT DOCUMENTS FOR THE PROJECT.
<br />2. EXISTING UTILITIES ARE SHOWN IN THESE PLANS PER THE LATEST AVAILABLE INFORMATION. THE
<br />CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND RELATED SURFACE FEATURES WITHIN THE
<br />PROJECT AREA AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES WITH THE PLAN INFORMATION PRIOR TO
<br />CONSTRUCTION. THE CONTRACTOR SHALL, AT MINIMUM, CONTACT THE UNDERGROUND UTILITIES LOCATE
<br />CENTER (811) TO HAVE UTILITIES VERIFIED ON THE GROUND PRIOR TO CONSTRUCTION.
<br />3. THE TEMPORARY EROSION AND SEDIMENTATION CONTROL (TESC) MEASURES SHOWN IN THESE PLANS SHALL
<br />BE CONSIDERED A MINIMUM. THE CONTRACTOR SHALL PROVIDE ANY REASONABLE ADDITIONAL MEASURES AS
<br />MAY BE REQUIRED TO FACILITATE ACTUAL SITE RUNOFF CONDITIONS AT THE TIME OF CONSTRUCTION. ALL
<br />NECESSARY EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN -PLACE PRIOR TO ANY
<br />DEMOLITION OR CONSTRUCTION ACTIVITIES.
<br />4. ALL NEW PAVEMENT, SIDEWALKS, AND CURB AND GUTTER INSTALLED BY THIS PROJECT SHALL BEAR ON
<br />SUITABLE, COMPACT FOUNDATION SOILS IN ACCORDANCE WITH THE REQUIREMENTS OF THE STANDARD
<br />SPECIFICATIONS AND PROJECT CONTRACT DOCUMENTS. SIMILAR EXISTING FACILITIES TO REMAIN, WHICH ARE
<br />DISTURBED OR DAMAGED DURING CONSTRUCTION, SHALL BE REPLACED IN -KIND TO THE SAME STANDARDS
<br />OF NEW FACILITIES.
<br />5. ALL PAVEMENT MARKINGS SHALL CONFORM TO THE WSDOT STANDARD PLANS AND SPECIFICATIONS AS
<br />AMENDED OR SUPPLEMENTED BY THE PROJECT PLANS, DETAILS, AND SPECIFICATIONS AS PROVIDED IN THE
<br />CONTRACT DOCUMENTS.
<br />6. ALL EXISTING ON -SITE WELLS OR SEPTIC TANKS SHALL BE PROPERLY ABANDONED BY A LICENSED
<br />CONTRACTOR, CERTIFIED TO PERFORM SUCH WORK, AND WRITTEN VERIFICATION OF ABANDONMENT SHALL BE
<br />PROVIDED TO THE OWNER, WASHINGTON STATE DEPARTMENT OF ECOLOGY, AND SNOHOMISH COUNTY HEALTH
<br />DEPARTMENT IN ACCORDANCE WITH APPLICABLE AGENCY REGULATIONS.
<br />Z THE MATERIALS AND METHODS OF INSTALLATION FOR ALL WATER AND SANITARY SEWER FACILITIES SHALL
<br />BE IN ACCORDANCE WITH THE LATEST CITY OF EVERETT STANDARDS.
<br />8. AT LEAST TWO COPIES OF THESE PLANS SHALL BE ON THE JOB SITE WHEN CONSTRUCTION IS IN PROGRESS.
<br />THE CONTRACTOR SHALL ALSO HAVE COPIES OF THE APPLICABLE REGULATORY AGENCY STANDARDS
<br />AVAILABLE AT THE JOB SITE DURING THE RELATED CONSTRUCTION OPERATIONS. ALL APPLICABLE PERMITS
<br />SHALL BE OBTAINED PRIOR TO ANY CONSTRUCTION ACTIVITY. ONE COMPLETE SET OF PROJECT PLANS WITH
<br />RECORDS OF AS -BUILT INFORMATION SHALL BE PROVIDED TO THE PROJECT ENGINEER AT THE END OF THE
<br />PROJECT.
<br />9. THE CONTRACTOR SHALL COORDINATE ACTIVITIES OF ALL UTILITY PURVEYORS IMPACTED BY WORK FOR THIS
<br />PROJECT AND SHALL CONTACT THEM PRIOR TO CONSTRUCTION TO SCHEDULE WORK FOR PROVISIONS FOR
<br />AND BE RESPONSIBLE TO SUPPORT, MAINTAIN, OR OTHERWISE PROTECT AND KEEP IN SERVICE ALL EXISTING
<br />UTILITIES WHETHER SHOWN OR NOT SHOWN ON THESE PLANS DURING CONSTRUCTION.
<br />10. UTILITIES, OR INTERFERING PORTIONS OF UTILITIES, THAT ARE ABANDONED IN PLACE SHALL BE REMOVED BY
<br />THE CONTRACTOR TO THE EXTENT NECESSARY TO COMPLETE THE PROPOSED WORK. THE CONTRACTOR
<br />SHALL PLUG THE REMAINING EXPOSED ENDS OF ABANDONED UTILITIES. CUTTING AND PLUGGING OF LINES TO
<br />BE ABANDONED SHALL BE CONSIDERED INCIDENTAL TO OTHER WORK PERFORMED.
<br />11. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL PROVISIONS OF THE SOILS
<br />REPORT FOR THE SITE BE OBSERVED AND COMPLIED WITH DURING ALL PHASES OF SITE PREPARATION,
<br />GRADING OPERATIONS, FOUNDATION, SLAB AND PAVING CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY
<br />THE PROJECT ENGINEER IMMEDIATELY OF ANY PROVISION OF THE SOIL REPORT WHICH CONFLICT WITH
<br />INFORMATION SHOWN ELSEWHERE ON THESE DRAWINGS, OR WHICH REQUIRES FURTHER CLARIFICATION.
<br />12. THE OWNER SHALL OBTAIN THE SERVICES OF A QUALIFIED SOILS ENGINEER AND/OR TESTING AGENCY TO
<br />PERFORM SUBGRADE/BACKFILL DENSITY TESTS OR TO DIRECT THE REMOVAL AND REPLACEMENT OF ANY
<br />UNSUITABLE MATERIALS DURING CONSTRUCTION. A REPRESENTATIVE OF THE SOILS ENGINEER AND/OR
<br />TESTING AGENCY SHALL BE AVAILABLE TO OBSERVE AND TO VERIFY FIELD CONDITIONS AS WORK PROCEEDS.
<br />THE SOILS ENGINEER SHALL SUBMIT FIELD REPORTS AS REQUIRED TO CERTIFY THE METHODS AND
<br />MATERIALS ARE IN ACCORDANCE WITH PROJECT SPECIFICATIONS. THE CONTRACTOR SHALL COORDINATE THE
<br />APPROPRIATE SOILS INSPECTIONS AND TESTING.
<br />13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE TRAFFIC CONTROL DURING
<br />CONSTRUCTION ADJACENT TO OR WITHIN ALL PUBLIC ROADWAYS. TRAFFIC CONTROL MEASURES SHALL BE IN
<br />PLACE PRIOR TO ANY CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL MAINTAIN ACCESS TO ALL PRIVATE
<br />PROPERTY DRIVEWAYS DURING CONSTRUCTION.
<br />CLEARING AND GRADING
<br />A. ALL ENVIRONMENTALLY SENSITIVE AREAS AND THEIR BUFFERS SHALL BE FLAGGED FOR EASY IDENTIFICATION BEFORE
<br />CLEARING TAKES PLACE. AFTER THESE AREAS ARE FLAGGED AND CLEARING LIMITS ARE APPROVED, AN AREA WIDE
<br />ENOUGH TO INSTALL A SILT FENCE AT THE CLEARING LIMITS, BY HAND OR BY MECHANICAL METHODS, MAY BE CLEARED.
<br />THE TOP OF THE SILT FENCE SHALL BE REFLAGGED AFTER INSTALLATION. IF A SILT FENCE IS NOT REQUIRED, THE AREA
<br />SHALL BE DELINEATED USING AN ORANGE BARRIER.
<br />B. ALL PERIMETER EROSION AND SEDIMENT CONTROL SHALL BE CONSTRUCTED, OPERATIONAL, AND INSPECTED BY THE
<br />PUBLIC WORKS INSPECTOR PRIOR TO INITIATION OF CLEARING AND GRUBBING OPERATIONS.
<br />C. DANGER TREES SHALL BE IDENTIFIED THROUGH A JOINT INSPECTION INVOLVING BOTH THE DEVELOPER AND PUBLIC WORKS
<br />INSPECTOR. NO TREES SHALL BE REMOVED UNTIL PERMISSION IS OBTAINED FROM THE APPROPRIATE PARTIES.
<br />D. WHERE POSSIBLE, NATURAL VEGETATION SHALL BE MAINTAINED FOR EROSION AND SEDIMENT CONTROL.
<br />E. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE EROSION CONTROL FACILITIES SHALL BE
<br />MAINTAINED AND/OR ALTERED AS REQUIRED TO ENSURE CONTINUING EROSION/SEDIMENT CONTROL.
<br />F. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL
<br />SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETED, PERMANENT DRAINAGE FACILITIES ARE OPERATIONAL,
<br />AND THE POTENTIAL FOR EROSION HAS PASSED.
<br />G. AT A MINIMUM, EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE MAINTAINED MONTHLY, OR FOLLOWING EACH
<br />RUNOFF -PRODUCING STORM, TO ENSURE PROPER OPERATION OF ALL EROSION AND SEDIMENT CONTROL FACILITIES.
<br />H. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN, SIZE, NOR LOCATION OF PERMANENT PIPES,
<br />RESTRICTORS, OR DETENTION FACILITIES, BUT IS AN APPROVAL OF EROSION AND SEDIMENT CONTROL BMPS ONLY.
<br />L THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN. TRACKING OF MUD AND DEBRIS FROM THE SITE WILL NOT BE
<br />ALLOWED. FAILURE TO COMPLY WITH THIS CONDITION WILL RESULT IN ALL WORK ON THE SITE BEING STOPPED.
<br />J. THE WASHINGTON STATE CLEAN AIR ACT REQUIRES THE USE OF ALL KNOWN, AVAILABLE, AND REASONABLE MEANS OF
<br />CONTROLLING AIR POLLUTION, INCLUDING DUST. DUST CAN BE CONTROLLED BY WETTING EXPOSED SOILS, WASHING TRUCK
<br />WHEELS BEFORE THEY LEAVE THE SITE, AND INSTALLING AND MAINTAINING ROCK CONSTRUCTION ENTRANCES.
<br />CONSTRUCTION VEHICLE TRACKOUT IS A MAJOR SOURCE OF DUST AND ANY EVIDENCE OF TRACK -OUT CAN TRIGGER FINES
<br />FROM THE DEPARTMENT OF ECOLOGY OR THE PUGET SOUND AIR POLLUTION CONTROL AGENCY.
<br />K. EVERY EFFORT SHALL BE MADE TO CLOSE UTILITY LINES BY THE END OF THE DAY AND MATERIAL EXCAVATED DURING
<br />UNDERGROUND UTILITY CONSTRUCTION SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES (WHERE CONSISTENT WITH
<br />SAFETY AND SPACE CONSIDERATIONS).
<br />STORM DRAINAGE
<br />1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED OR PUT INTO USE UNTIL IT HAS BEEN INSPECTED,
<br />TESTED, AND ACCEPTED BY THE CITY OF EVERETT.
<br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT STANDARDS AND STANDARD SPECIFICATIONS OF
<br />WSDOT/APWA.
<br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN FOR
<br />CONVENIENCE THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO
<br />ANY ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR
<br />SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER
<br />PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT.
<br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND
<br />GRADE PRIOR TO STARTING CONSTRUCTION.
<br />5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED 'BUMP NO WASTE, DRAINS TO STREAM, LAKE, RIVER, PUGET
<br />SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE FOR THE PROJECT.
<br />A. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY MEANS OF AN APPROVED BACKFLOW PREVENTION
<br />DEVICE PRIOR TO SATISFACTORY FLUSHING, TESTING, DISINFECTION, AND RECEIPT OF SATISFACTORY BACTERIOLOGICAL
<br />TEST RESULTS
<br />B. CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE CITY UTILITIES DEPARTMENT AT THE DEVELOPER'S
<br />EXPENSE. THE CITY UTILITIES DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUSINESS DAYS NOTICE FOR EACH CONNECTION.
<br />THE CITY UTILITIES DEPARTMENT SHALL THEREAFTER DETERMINE THE DATE AND TIME AT WHICH THE CONNECTION SHALL
<br />BE MADE.
<br />C. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT STANDARDS.
<br />D. A PRE -CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE START OF CONSTRUCTION. THE CITY OF
<br />EVERETT ENGINEERING DEPARTMENT CONSTRUCTION DIVISION MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO
<br />COMMENCEMENT OF CONSTRUCTION.
<br />E. THE DEVELOPER OR THE DEVELOPERS AUTHORIZED AGENT SHALL NOTIFY THE CITY OF UTILITIES DEPARTMENT OF A
<br />PERSON WHO CAN BE CONTACTED REGARDING PROBLEMS DURING CONSTRUCTION ON A 24 HOUR BASIS.
<br />F. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL SEPARATION BETWEEN POTABLE AND
<br />NON -POTABLE CONVEYANCE SYSTEMS.
<br />G. ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY CITY UTILITIES DEPARTMENT PERSONNEL ONLY. ALL VALVES, NEW
<br />AND EXISTING, SHALL BE ACCESSIBLE AT ALL TIMES.
<br />SANITARYSEWER
<br />A. ALL WORK AND MATERIALS SHALL CONFORM TO THE CITY OF EVERETT STANDARDS AND WSDOT/APWA STANDARD
<br />SPECIFICATIONS.
<br />B. NO PART OF THE SANITARY SEWER SYSTEM SHALL BE COVERED, CONCEALED OR PUT INTO USE UNTIL IT HAS BEEN
<br />TESTED, INSPECTED, AND APPROVED BY THE CITY INSPECTOR.
<br />C. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN FOR
<br />CONVENIENCE THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO
<br />ANY ADDITIONAL UTILITIES NOT SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE
<br />CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE
<br />CITY ENGINEER PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT.
<br />D. ALL SEWER MAIN EXTENSIONS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE STAKED BY SURVEY FOR
<br />LINE AND GRADE PRIOR TO STARTING CONSTRUCTION.
<br />z
<br />0
<br />a
<br />m z
<br />z z
<br />0
<br />�,
<br />Y
<br />3
<br />CO
<br />pp
<br />U
<br />3
<br />Of
<br />aLU
<br />rzdz
<br />Go,
<br />m
<br />`�
<br />FS .ati s r
<br />OVAL
<br />THE AS -BUILT INFORMATION
<br />SHOWN ON THIS PLAN IS PER
<br />A FIELD SURVEY PERFORMED
<br />3Y MEAD GILMAN ASSOCIATES
<br />AND/OR RECORD DATA
<br />PROVIDED BY THE
<br />CONTRACTOR.
<br />CLIENT
<br />z
<br />C)
<br />U
<br />z
<br />0
<br />C)
<br />I
<br />z
<br />0
<br />z
<br />z_
<br />x
<br />3
<br />z
<br />z
<br />0
<br />U
<br />x
<br />i
<br />0
<br />x
<br />z
<br />z
<br />in
<br />LL
<br />Ld
<br />w
<br />Eu,
<br />0
<br />I
<br />TESC NOTES FOUR CORNERS, LLC
<br />10900 NE 8TH STREET
<br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, SUITE 1200
<br />CHANNELS, RETENTION FACILITIES, UTILITIES). BELLEVUE, WA98004
<br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL PHONE: (425) 453-9551
<br />CONSTRUCTION IS COMPLETED AND APPROVED AND VEGETATION LANDSCAPING IS ESTABLISHED.
<br />J. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE
<br />FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION.
<br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN
<br />WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. C P H
<br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR
<br />UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE
<br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE APPLICANT CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS.
<br />7. EESC CIL171ES ON INACTIVE SITES SHALL BE SHALL MORE THAN ONE FOOT OF SEDIMENT BEALLOWED AND TO ACCUMNTAINED AULATE ATE WITHIN INIMUM OF ONCE
<br />CTRAPPEDNCATCH BASIN. ALL TH OR WITHIN THE CA CATCHBASINSRS
<br />G A MAJOR STORM EVENT
<br />8. ATNO 71MECONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CONSULTANTS
<br />CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. Site Planning • CNiI Engineering
<br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAYBE REQUIRED TO ENSURE Landscape Architecture •Land Use Consulting
<br />THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT.
<br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE CONTRACTOR SHALL KEEP CITY STREETS CLEAR OF DIRT AND DEBRIS AT ALL TIMES 11321-B NE 1201h Sheet
<br />DURING CONSTRUCTION. DUST SUPPRESSION AND STREET CLEANING MUST OCCUR AS DIRECTED BY THE PUBLIC WORKS INSPECTOR. Kirkland, WA 98034 • (425) 285-2390
<br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL. 101 South Wenatchee Avenue, Suite C3
<br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH Wenatchee, WA 98MI-(509) 293-7731
<br />SEPTEMBERR 30. www.cph consult ants.com
<br />PROJECT NO.
<br />0024-18-042
<br />Copyright ® 2020 CPH Consultants, U.C. All Rlghts Reserved.
<br />DRAWING
<br />C0.01
<br />SHEET 2 OF 62