Laserfiche WebLink
' I <br />SP 1202 105002 <br />PFN g�11 ' <br />'h <br />430, I;nh <br />zo• <br />GARDEN ESTATES <br />SECTION 12, TOWNSHIP 28N, RANGE 4E, W.M. <br />LOT 17 <br />BEVERLY HOME SITES DIV. NO. 1 <br />VOL. 10, P. 74 <br />PWR 4° <br />SSMH <br />RIM=558.28 <br />IE 8" PVC S=559.02 <br />IE 8" PVC W,N=558.28 <br />8" PVC E=558.18 <br />MERIDIAN AVE <br />LIMITS OF CLEARING sD <br />a \ TYPE I CB, SOLID LID <br />RIM=564.36 <br />MARK W ORANGE a c \ IE 12 CPEP E=557.06 <br />RIM=594.68 y / P'/ 5 95 1 AF \ `� g FLAGGING o Q v=i IE 12" CPEP W=557.16 <br />IE 12" CONC N=592.72 I Sg 3 ZgSg0 BMP C103 I � I >� IE 12" CONC W=558.80 <br />IE 12" CONC S=592.72 ;. g 6 g 4 2 3 4 <br />0 V T T <br />W RIM= CTR STIR SSMH = I I o _ RIM=597. P.:....... ' <br />�� II GARAGE I >N00'00'35" HOUSE L_ „ I ow N89'03'18"E 209.73' <br />IE 8" PVC N,W=586.12 4;.'. , . •',...... I <br />IE 8" PVC S=586.02 -' �° I N89'00 59 173.88' 7J(BF L� 1.19'\ _' HWF N89 8"E 3i 8' - - N \ z o <br />- SS SS . VBF \ /\ / \ / 4' \s <br />... ..-. :\ ;:: \ /� •(i, YF W/ 1.5'I DIAM FOOTINGS I <br />N A. <br />IE 12" <br />TYPE I CB \ as 592� <br />RIM=596.07 <br />IE 12" CPEP N=592.96 <br />bba <br />d <br />HOUSE /, DETENTION VAL LT TIO <br />T f cqR I l / 7 E USED AS SE IMENT ' INTERCEPTOR <br />1cu qGE / POND URING <br />OZ g1 R 18R / DITCH W/ ROCK <br />S5 12 031050 M ,: y /r / 1 CONSTR CT1 CHECK DAy6 I <br />95 / / / / ( \ / r r BMP C20� \ I I <br />pp� <br />�07 <br />$ C ST. ENT. I - <br />I PE COE STD. <br />DWG 201. i <br />CB INLET BMP C105 <br />.::;.;... h / / / ,� / / / P TECTiON (TYP.) <br />/'rry <br />TBR� PER/ COIL STD. <br />_DWG 210 • / <br />E RIM=CTR STIR SSMH ¢ / / / / / / / / / / y / / / - \ • <br />RIM=598.35':;.:.`::::.; <br />IE 8" PVC N=585.24 ; , .. :... � � • J � � i • / / • / • <br />IE 8" PVC E=585.14 �`.': ": ....,:. J / / ® NO PARKING <br />W` <br />4 .:.... •. :.0 -' .NO PAR�I 6' / �4 HWF/ Ni�'8h'21"/F®/5 / /- - D SD D SD <br />w. .. <br />SS SS SS <br />.. ..ST P'............:..1... :. ..�... <br />.... - <br />CONC MONUMENT WITH 1.5 ,., • ...:.:.. .....::..::...:, ..:..:.. 1. �.2j(Q.. .. .. .. <br />ss : g <br />f- ... ........... , ...-. r .... 0� <br />BRASS DISK WITH X DOWN --` -�`'`" ylt . , . V1 <br />W W W �W <br />�:..:' 9 ... NN:,:.. 6" DIP N RIM= CTR STIR SSMH <br />0.6' IN CASE 5..::::`:.:�;'.. �.�:::�,:...:...:.:.: ..:: W.: .:. <br />W.:. • :.:... , 81T ST 11 <br />VISITED MAY 2016 :.• :.-.:...;W� : - SO RIM=570.98 <br />j/ f D SD SD SD SD SD CONC MONUMENT WITH 1.5° IE 6" PVC S=562.35 <br />IE 8" PVC W=562.35 <br />� ,S RIM-CTR STIRSSMH S RIM=CTR STIR SSMH <br />DISK WITH 'X', DOWN SSMH N RIM= CTR STR SSMH TYPE I CB 0.3' IN CASE IE 8" PVC E=562.25 <br />RIM=597.17 RIM=596.25 RIM=576.76 RIM=571.66 RIM=570.37 TYPE I CB VISITED MAY 2016 TYPE I CB <br />IE 12" CPEP E=592.82 IE 8" PVC NW=594.65 IE 8" PVC W=567.89 IE 8" PVC W=564.891E 12" CONC NE=567.47 RIM=570.00 RIM=570.52 <br />Q IE 8" PVC SW=594.65 IE 8" PVC E=567.79 IE 8" PVC E=564.79 IE 6" PVC S=567.69 IE 4" PVC N=567.20�TBR) IE 12" CPEP E=566.38 <br />IE 8" PVC E=594.55 IE 12" CONC W=566.43 / IE 12" CONIC E=566.. IE 6" PVC S-566.63 <br />� / / Q IE 12" CONC SW=56728 - <br />g0 <br />QQ�� / 1202,3505gg1 LOT 21 <br />Sg <br />rya J PFN g3012 BEVERLY HOME SITES DIV, NO. 1 <br />ry�"ryti VOL. 10, P. 74 <br />19' <br />SP 1252 421500 <br />g0 <br />TYPE II SDMH VAULT <br />RIM=568.52 =r <br />IE 12" E=560.42 -i <br />IE 36" CMP S=560.42 <br />TOP 12" CMP OVERFLOW=566.00 <br />30' <br />ITTYPE II SDMH <br />1 ^ RIM=568.64 <br />IE 12" CPEP S=563.39 <br />IE 12" CPEP NW=564.54 <br />IIIE 36" CMP N=560.45 <br />" IE 12" CPEP W/ <br />/ N TRAS INSTALL F <br />ss.14 N <br />SILT FENCE gVR��NGVC <br />N DWG 2114 PER COE <br />STD���RG 1 g P <br />�N BMP C233 \� 05 - <br />�a <br />I� <br />Ix U <br />En <br />Vl ! N <br />SSMH <br />RIM=570.65 <br />IE 8" PVC S W=560.96 <br />IE 8" PVC N=560.86 <br />' IE'12" CPEP=565.75 <br />30' <br />Q z <br />w <br />Q O <br />9 <br />wI O <br />M <br />APPLICATION RATES AND <br />QUALITY STANDARDS FOR MULCH MATERIALS <br />T.E.S.C. LEGEND <br />X SILT FENCE PER COE STD DET 214 PER BMP C233 PERMANENT COVER BMP HYDROSEEDING GENERAL <br />MULCH MATERIALS <br />DESCRIPTION <br />APPLICATION RATES <br />STRAW <br />AIR-DRIED; FREE FROM UNDESIRABLE <br />2"-3" THICK, <br />SEED AND COARSE MA TERIAL <br />5 BALES PER 1000 SF <br />OR 2-3 TONS PER ACRE <br />NOTES) <br />CLEARING LIMITS PER BMPC103 <br />1. CONSTRUCTION ACCEPTANCE: WILL BE <br />HYDROMULCH <br />NO GROWTH INHIBITING FACTORS <br />APPROX. 35-45 LBS <br />SUBJECT TO A WELL ESTABLISHED GROUND COVER <br />PER 1000 SF, OR <br />CONSTRUCTION ENTRANCE PER BMP C105 THAT FULFILLS THE REQUIREMENT OF THE <br />m <br />1500-2000 LBS PER ACRE <br />APPROVED CONSTRUCTION PLANS <br />O CATCH BASIN (CB) INLET PROTECTION 2 ALL DISTURBED AREAS SUCH AS DETENTION <br />COMPOST <br />NO VISIBLE WATER OR DUST DURING <br />2" THICK, "IN.; (APPROX. 100 <br />PER BMP C220 FACILITIES ROADWAY BACK -SLOPES ETC. SHALL <br />HANDLING. MUST BE PURCHASED <br />TONS PER ACRE APPROX. 750 <br />BE SEEDED WITH A PERENNIAL GROUND COVER <br />FROM SUPPLIER WITH SOLID WASTE <br />LBS PER YARD) <br />- - INTERCEPTOR DITCH AND CHECK DAM PER BMP C200 & C207 GRASS TO MINIMIZE EROSION. GRASS SEEDING WILL <br />BE DONE USING AN APPROVED HYDROSEEDER OR <br />HANDLING PERMIT <br />AS OTHERWISE APPROVED BY THE CITY OF <br />EVERETT. <br />APPLICATION: J. PREPARATION OF SURFACE.- ALL AREAS TO <br />GRADATIONS FROM FINES TO 6 <br />CHIPPED SITE <br />INCHES /N LENGTH <br />2" THICK MIN <br />BE SEEDED SHALL BE CULTIVATED TO THE <br />VEGETATION <br />MIX VARIOUS SIZES, AVERAGE SIZE <br />MULCH MAY BE APPLIED: <br />SATISFACTION OF THE C/TY INSPECTOR. THIS MAY <br />IS BETWEEN 2-4 INCHES <br />ON DISTURBED SURFACES THAT WILL REMAIN UNWORKED FOR MORE THAN 7 DAYS BE ACCOMPLISHED BY DISC/NG, RAKING, <br />(2 DAYS IN THE WET SEASON). HARROWING OR OTHER ACCEPTABLE MEANS <br />NO VISIBLE WATER OR DUST DURING <br />WOOD BASED MULCH <br />HANDLING. MUST BE PURCHASED <br />2" THICK MIN <br />ON DISTURBED AREAS THAT NEED COVER MEASURES FOR LESS THAN 30 DAYS 4. IMMEDIATELY FOLLOWING FINISH GRADING, <br />FROM SUPPLIER WITH SOLID WASTE <br />HANDLING PERMIT <br />AS A COVER FOR SEED DURING THE WET SEASON AND DURING THE HOT SUMMER MONTHS. PERMANENT VEGETATION (CONSISTING OF RAPID, <br />PERSISTENT AND LEGUME) WILL BE APPPLIED. <br />DURING THE WET SEASON, ON DISTURBED SLOPES STEEPER THAN JHIV (MIN/MUM 30# PER ACRE). THIS /S TO INCLUDE THE <br />WITH MORE THAN 10 FEET OF VERTICAL RELIEF. FOLLOWING- 20Z ANNUAL, PERENNIAL OR HYBRID <br />WOOD STRAND MULCH <br />BLEND NATIVE CONIFER OR DECIDUOUS <br />2" THICK MIN <br />RYE GRASS, 409 CREEPING RED FESCUE, 407 <br />WITH HIGH LENGTH TO WIDTH RATIO <br />• <br />MAINTENANCE.WHITE CLOVER. HYDROSEED REQUIRED. <br />MULCH MUST BE INSPECTED REGULARLY AND MORE MULCH ADDED AS NEEDED TO 5. FERTILIZER: SHALL BE APPLIED AT 400# PER <br />MAINTAIN THE SUGGESTED APPLICATION RATE. ALL RIPS OR TEARS /N PLASTIC SHEETING ACRE OF 10-20-20 (10 LB. PER 1,100 SQUARE <br />SHALL BE REPAIRED. SHEETING SHALL BE CHECKED TO ENSURE IT IS PROPERLY FEET) OR EQUIVALENT. <br />OVERLAPPED AND WEIGHTED IN PLACE, SHEETING SHALL BE RE -LAPPED AND WEIGHTS <br />REPLACED AS NEEDED. IVUL CH PERMA NEN T SEEDING <br />PER 2019 SNIUMWW <br />BMP C121 <br />PER 2019 SWIMWW <br />BMP C120 <br />J <br />r3 <br />FOUND 3" PIPE FILLED WITH <br />CONC WITH LEAD/TACK, <br />DOWN 0.5' IN CASE <br />VISITED MAY 2016 <br />GRADING QUANTITIES: <br />CUT = 1,975 C.Y. <br />FILL = 1,975 C.Y. <br />GRADING QUANTITIES ESTIMATED <br />BASED ON CURRENT SITE <br />INFORMATION & ASSUMED <br />EXCAVATIONS NECESSARY FOR <br />PROPOSED IMPROVEMENTS. <br />W <br />ne4 <br />IIIII ao <br />HORIZONTAL SCALE <br />CONS TRUC TION SEQUENCE <br />1. PRIOR TO ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL <br />SCHEDULE AND ATTEND A PRE -CONSTRUCTION CONFERENCE WITH THE <br />CITY OF EVERETT INSPECTOR. (CITY OF EVERETT PLANNING SHALL BE <br />INCLUDED IN THE MEETING.) <br />2. INSTALL ORANGE PLASTIC CLEARING LIMIT FENCING AS INDICATED. <br />3. INSTALL ALL SILT FENCE AND INLET PROTECTION. <br />4. CLEAR FOR AND CONSTRUCT THE TEMPORARY CONSTRUCTION ACCESS <br />STABILIZATION TO GRADE. <br />5. CLEAR, GRUB, AND GRADE FOR UTILITY CORRIDORS. <br />6. MAINTAIN EXISTING PERIMETER VEGETATION AND ADD ADDITIONAL ROW <br />OF SILT FENCING WHERE NECESSARY. <br />7. CONSTRUCT UTILITIES, PAVING & DRIVEWAY CUTS PER APPROVED <br />DESIGN PLANS. <br />8. APPLY MULCH TO UNCOVERED AREAS IN ACCORDANCE WITH THE <br />MULCH DETAIL THIS SHEET. <br />10. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE <br />STABILIZED IN ACCORDANCE WITH THESE PLANS AND APPLICABLE BMP'l. <br />REMOVED. <br />J_ <br />EROSION CONTROL NOTES <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN <br />DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR W <br />DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, 1 <br />RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). cn <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION< <br />MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC <br />FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR <br />UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND <br />VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN <br />SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. <br />DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE <br />FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL <br />BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION <br />OF CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN <br />CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN <br />SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN <br />WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE <br />APPLICABLE WATER QUALITY STANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM <br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE <br />CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS <br />NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT <br />SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED <br />BY THE APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED <br />FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND <br />MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS <br />FOLLOWING A MAJOR STORM EVENT. <br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED <br />TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS <br />AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE <br />CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO <br />THE DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE <br />BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF <br />THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE <br />THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE <br />PROJECT. <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO <br />REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM <br />ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR <br />UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH <br />APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH <br />SEPTEMBER 30. <br />CALL 48 HOURS <br />BEFORE YOU DIG <br />811 <br />00 <br />AS -BUILT NOTE: <br />THE AS -BUILT INFORMATION SHOWN WAS <br />PROVIDED BY HARMSEN LAND SURVEYORS. <br />OMEGA ENGINEERING HAS PREPARED AND <br />STAMPED THIS DRAWING BASED ON THAT <br />INFORMATION. <br />10 <br />m <br />� <br />3 <br />Of <br />0 <br />Z <br />O <br />o <br /><a <br />a= <br />O <br />w <br />U <br />az <br />D <br />0 <br />a <br />J <br />W <br />❑ <br />N <br />Y <br />O <br />N <br />E <br />_ <br />J <br />3 <br />o <br />J <br />m <br />w <br />a <br />w <br />� <br />a <br />F <br />Q <br />O <br />rn <br />rn <br />N <br />Q< <br />41R <br />a <br />a <br />d <br />N 00 <br />> N 00 N <br />QLU rnv <br />O � N <br />L0 L0 <br />j� N N <br />LU LU } ~ <br />ir <br />LU <br />NLUL <br />Z <br />Z <br />Weg <br />W <br />W <br />Z <br />0 rs <br />Z <br />W <br />VJ <br />O <br />O <br />Lu <br />C <br />L <br />N <br />f0 <br />3 <br />V / <br />0 <br />W <br />Q <br />r <br />J <br />o <br />W <br />O <br />O <br />I..L <br />� <br />W <br />(n <br />�,J <br />W <br />W <br />7 <br />u <br />z <br />o Fz <br />H Q <br />(V LU <br />z I- <br />O LU <br />H O <br />U z <br />LU Of <br />LL 2 <br />O � <br />z O <br />O z <br />H 00 <br />� N <br />O <br />O- <br />PROD. NO. DSN. BY: <br />1 7- 0408 RAW <br />DAZE: <br />7/17/19 <br />scuE: <br />1 " = 40' <br />DRAWING NO. <br />2 9 <br />OF <br />v <br />N <br />O <br />N <br />0 <br />m <br />0 <br />