Laserfiche WebLink
0 <br />0 <br />0 <br />o <br />00 <br />mQ <br />oL <br />00 <br />/ Un <br />U)o <br />Q <br />�U� <br />EQ <br />/ z <br />oQ <br />o z <br />/o <br />o <br />N <br />0 0 <br />RLL <br />N� <br />o <br />/N <br />No <br />e � <br />00 <br />i� <br />o <br />0 <br />LEGEND <br />EXISTING PROPOSED <br />ROADWAY CENTERLINE <br />PROJECT BOUNDARY LINE <br />PROPERTY BOUNDARY LINE <br />RIGHT-OF-WAY LINE <br />EASEMENT LINE - - <br />EDGE OF PAVEMENT LINE <br />10' CONTOUR LINE------290------ <br />115 <br />Know what's below. <br />Call before ou <br />2 CON TOUR LINE <br />SANITARY SEWER MAIN <br />SS <br />WATER LINE <br />W <br />FIRE SUPPLY <br />F <br />STORM PIPE <br />SD <br />GAS LINE <br />GAS <br />FENCE LINE <br />X <br />POWER LINE <br />OP <br />BURIED POWER LINE <br />BP - <br />UTILITY EASEMENT <br />TELEPHONE LINE <br />T <br />BURIED TELEPHONE LINE <br />B T <br />SWALE <br />SILT FENCE <br />TEMP. CONSTRUCTION FENCING <br />CLEARING LIMIT <br />SANITARY SEWER CLEAN OUT <br />O <br />SANITARY SEWER MANHOLE <br />O <br />STORM DRAIN CATCH BASIN - TYPE I <br />❑ <br />STORM DRAIN CATCH BASIN - TYPE II <br />O❑ <br />STORM DRAIN INLET (NO CATCH) <br />0 <br />STORM DRAIN CULVERT <br />WATER CAP/PLUG <br />WA TER COUPLING <br /># <br />GUARD POST <br />o <br />REDUCER <br />THRUST BLOCK <br />a <br />WA TER METER <br />2 NOZZLE FIRE HYDRANT <br />3 NOZZLE FIRE HYDRANT <br />-6- <br />FLANGE/BOND FL JOINT <br />II <br />MECHANICAL JOINT <br />C <br />PUSH-ON/HUB JOINT <br />C <br />THREAD JOINT <br />AIR RELIEF VALVE <br />BLOW -OFF VALVE <br />BUTTERFLY VALVE <br />CHECK VALVE <br />N <br />GATE/GENERAL VALVE <br />PLUG VALVE <br />GAS METER <br />o <br />GAS VALVE <br />�► <br />PAD MOUNTED TRANSFORMER <br />0 <br />POWER VAULT <br />TRANSMISSION TOWER (SCALEABLE) <br />❑® <br />UTILITY POLE <br />-0- <br />POWER POLE <br />-0- <br />UTILITY POLE ANCHOR <br />E- <br />TELEPHONE RISER <br />1-1 <br />TELEPHONE VAULT <br />OT <br />BUS STOP <br />eus <br />MAIL BOX <br />RIP RAP <br />ROCKERY <br />SHRUB <br />GENERAL SIGN <br />REGULA TOR Y SIGN <br />�- <br />TREE (CONIFER) <br />TREE (DECIDUOUS) <br />0 <br />YARD LIGHT <br />0 <br />BRIDGE/TUNNEL :D-- - - <br />ASPHALT PA VEMEN T <br />CONCRETE <br />SS SS <br />-F -F -F -F -F -F -F - <br />GAS <br />X <br />X <br />X <br />X <br />X <br />0 <br />0 <br />0 <br />C <br />C <br />D <br />PTN. OF W 1/2 SE 1/4 OF SEC 14, TWP 28N, R4E W.M. <br />ABBREVIATIONS <br />AC <br />ASPHALT CONCRETE PAVEMENT <br />LCPE <br />LINED CORRUGATED POLYETHYLENE PIPE <br />AP <br />ANGLE POINT <br />LF <br />LINEAL FEET <br />ATB <br />ASPHALT TREATED BASE <br />LT <br />LEFT <br />AVE <br />AVENUE <br />LUI <br />LAND USE INSPECTOR <br />BCR <br />BEGIN CURB RETURN <br />MAX. <br />MAXIMUM <br />BOC <br />BACK OF CURB <br />MSE <br />MECHANICALLY STABILIZED EARTH <br />BOW <br />BOTTOM OF WALL <br />MH <br />MANHOLE <br />CASP <br />CRITICAL AREA SITE PLAN <br />MIN. <br />MINIMUM <br />q <br />CENTERLINE <br />MJ <br />MECHANICAL JOINT <br />CB <br />CATCH BASIN <br />N <br />NORTH <br />CDF <br />CONTROLLED DENSITY FILL <br />NIC <br />NOT IN CONTRACT <br />CMP <br />CORRUGATED METAL PIPE <br />O.C. <br />ON CENTER <br />COE <br />CITY OF EVERETT <br />PC <br />POINT OF CURVATURE <br />CONC. <br />CONCRETE <br />PE <br />PLAIN END <br />CONN. <br />CONNECTION <br />PI <br />POINT OF INTERSECTION <br />CONT. <br />CONTINUOUS <br />PL <br />PLACE <br />CPP <br />CORRUGATED POLYETHYLENE PIPE <br />PT <br />POINT OF TANGENCY <br />(W�SMOOTH INTERIOR WALLS) <br />PVl <br />POINT OF VERTICAL INTERSECTION <br />CSBC <br />CRUSHED SURFACING BASE COURSE <br />PUE <br />PUBLIC UTILITY EASEMENT <br />CSTC <br />CRUSHED SURFACING TOP COURSE <br />PWS <br />PUBLIC WORKS STANDARDS <br />DIA. <br />DIAMETER <br />REQ'D. <br />REQUIRED <br />DI <br />DUCTILE IRON <br />ROW <br />RIGHT-OF-WAY <br />DW <br />DRIVEWAY <br />RT <br />RIGHT <br />E <br />EAST <br />S <br />SOUTH <br />ECR <br />END CURB RETURN <br />SD <br />STORM DRAIN <br />EDDS <br />ENGINEERING DESIGN AND <br />SP <br />SPACE <br />DEVELOPMENT STANDARDS <br />SS <br />SANITARY SEWER <br />EL. <br />ELEVATION <br />SSD <br />STOPPING SIGHT DISTANCE <br />EOP <br />EDGE OF PAVEMENT <br />STA <br />STATION <br />ESC <br />EROSION AND SEDIMENT CONTROL <br />TESC <br />TEMPORARY EROSION AND SEDIMENT CONTROL <br />ESD <br />ENTERING SIGHT DISTANCE <br />TOC <br />TOP OF CURB <br />ESMT. <br />EASEMENT <br />TYP. <br />TYPICAL <br />EVA <br />EMERGENCY VEHICLE ACCESS <br />1BW <br />TOP BACK OF WALK <br />EXIST. <br />EXISTING <br />TOW <br />TOP OF WALL <br />FL <br />FLOW LINE <br />LINO <br />UNLESS NOTED OTHERWISE <br />FL. <br />FLANGE <br />VERT. <br />VERTICAL <br />FOC <br />FACE OF CURB <br />WSDOT <br />WASHINGTON DEPT. OF TRANSPORTATION <br />HORIZ <br />HORIZONTAL <br />W <br />WITH <br />IE <br />INVERT ELEVATION <br />W <br />WEST <br />INT <br />INTERSECTION <br />WS <br />WATER SERVICE <br />GENERAL PROJECT NOTES <br />1. ALL WORKMANSHIP, METHODS AND MATERIALS FOR THIS PROJECT SHALL CONFORM TO THE LATEST EDITION OF THE <br />STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION AS PRODUCED BY WSDOT AND THE <br />WASHINGTON STATE CHAPTER OF THE APWA; CITY OF EVERETT DESIGN AND CONSTRUCTION STANDARDS AND <br />SPECIFICATIONS FOR DEVELOPMENT AND ANY SPECIAL PROVISIONS PROVIDED BY THESE PLANS OR OTHER CONTRACT <br />DOCUMENTS FOR THE PROJECT. <br />2. EXISTING UTILITIES ARE SHOWN IN THESE PLANS PER THE LATEST AVAILABLE INFORMATION. THE CONTRACTOR SHALL <br />VERIFY THE LOCATIONS OF ALL UTILITIES AND RELATED SURFACE FEATURES WITHIN THE PROJECT AREA AND NOTIFY <br />THE ENGINEER OF ANY DISCREPANCIES WITH THE PLAN INFORMATION PRIOR TO CONSTRUCTION. THE CONTRACTOR <br />SHALL, AT MINIMUM, CONTACT THE UNDERGROUND UTILITIES LOCATE CENTER (811) TO HAVE UTILITIES VERIFIED ON THE <br />GROUND PRIOR TO CONSTRUCTION. <br />3. THE TEMPORARY EROSION AND SEDIMENTATION CONTROL (TESC) MEASURES SHOWN IN THESE PLANS SHALL BE <br />CONSIDERED A MINIMUM. THE CONTRACTOR SHALL PROVIDE ANY REASONABLE ADDITIONAL MEASURES AS MAY BE <br />REQUIRED TO FACILITATE ACTUAL SITE RUNOFF CONDITIONS AT THE TIME OF CONSTRUCTION. ALL NECESSARY EROSION <br />AND SEDIMENTATION CONTROL MEASURES SHALL BE IN -PLACE PRIOR TO ANY DEMOLITION OR CONSTRUCTION ACTI VI TIES. <br />4. ALL NEW PAVEMENT, SIDEWALKS, AND CURB AND GUTTER INSTALLED BY THIS PROJECT SHALL BEAR ON SUITABLE, <br />COMPACT FOUNDATION SOILS IN ACCORDANCE WITH THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS AND <br />PROJECT CONTRACT DOCUMENTS. SIMILAR EXISTING FACILITIES TO REMAIN, WHICH ARE DISTURBED OR DAMAGED DURING <br />CONSTRUCTION, SHALL BE REPLACED IN -KIND TO THE SAME STANDARDS OF NEW FACILITIES. <br />5. ALL PAVEMENT MARKINGS SHALL CONFORM TO THE WSDOT STANDARD PLANS AND SPECIFICATIONS AS AMENDED OR <br />SUPPLEMENTED BY THE PROJECT PLANS, DETAILS, AND SPECIFICATIONS AS PROVIDED IN THE CONTRACT DOCUMENTS. <br />6. ALL EXISTING ON -SITE WELLS OR SEPTIC TANKS SHALL BE PROPERLY ABANDONED BY A LICENSED CONTRACTOR, <br />CERTIFIED TO PERFORM SUCH WORK, AND WRITTEN VERIFICATION OF ABANDONMENT SHALL BE PROVIDED TO THE <br />OWNER, WASHINGTON STATE DEPARTMENT OF ECOLOGY, AND SNOHOMISH COUNTY HEALTH DEPARTMENT IN ACCORDANCE <br />WITH APPLICABLE AGENCY REGULATIONS. <br />7. THE MATERIALS AND METHODS OF INSTALLATION FOR ALL WATER AND SANITARY SEWER FACILITIES SHALL BE IN <br />ACCORDANCE WITH THE LATEST CITY OF EVERETT STANDARDS. <br />8. AT LEAST TWO COPIES OF THESE PLANS SHALL BE ON THE JOB SITE WHEN CONSTRUCTION IS IN PROGRESS. THE <br />CONTRACTOR SHALL ALSO HAVE COPIES OF THE APPLICABLE REGULATORY AGENCY STANDARDS AVAILABLE AT THE JOB <br />SITE DURING THE RELATED CONSTRUCTION OPERATIONS. ALL APPLICABLE PERMITS SHALL BE OBTAINED PRIOR TO ANY <br />CONSTRUCTION ACTIVITY. ONE COMPLETE SET OF PROJECT PLANS WITH RECORDS OF AS -BUILT INFORMATION SHALL BE <br />PROVIDED TO THE PROJECT ENGINEER AT THE END OF THE PROJECT. <br />9. THE CONTRACTOR SHALL COORDINATE ACTIVITIES OF ALL UTILITY PURVEYORS IMPACTED BY WORK FOR THIS PROJECT <br />AND SHALL CONTACT THEM PRIOR TO CONSTRUCTION TO SCHEDULE WORK FOR PROVISIONS FOR AND BE RESPONSIBLE <br />TO SUPPORT, MAINTAIN, OR OTHERWISE PROTECT AND KEEP IN SERVICE ALL EXISTING UTILITIES WHETHER SHOWN OR <br />NOT SHOWN ON THESE PLANS DURING CONSTRUCTION. <br />10. UTILITIES, OR INTERFERING PORTIONS OF UTILITIES, THAT ARE ABANDONED IN PLACE SHALL BE REMOVED BY THE <br />CONTRACTOR TO THE EXTENT NECESSARY TO COMPLETE THE PROPOSED WORK. THE CONTRACTOR SHALL PLUG THE <br />REMAINING EXPOSED ENDS OF ABANDONED UTILITIES. CUTTING AND PLUGGING OF LINES TO BE ABANDONED SHALL BE <br />CONSIDERED INCIDENTAL TO OTHER WORK PERFORMED. <br />11. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL PROVISIONS OF THE SOILS REPORT FOR <br />THE SITE BE OBSERVED AND COMPLIED WITH DURING ALL PHASES OF SITE PREPARATION, GRADING OPERATIONS, <br />FOUNDATION, SLAB AND PAVING CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IMMEDIATELY <br />OF ANY PROVISION OF THE SOIL REPORT WHICH CONFLICT WITH INFORMATION SHOWN ELSEWHERE ON THESE DRAWINGS, <br />OR WHICH REQUIRES FURTHER CLARIFICATION. <br />12. THE OWNER SHALL OBTAIN THE SERVICES OF A QUALIFIED SOILS ENGINEER AND/OR TESTING AGENCY TO PERFORM <br />SUBGRADE/BACKFILL DENSITY TESTS OR TO DIRECT THE REMOVAL AND REPLACEMENT OF ANY UNSUITABLE MATERIALS <br />DURING CONSTRUCTION. A REPRESENTATIVE OF THE SOILS ENGINEER AND/OR TESTING AGENCY SHALL BE AVAILABLE TO <br />OBSERVE AND TO VERIFY FIELD CONDITIONS AS WORK PROCEEDS. THE SOILS ENGINEER SHALL SUBMIT FIELD REPORTS <br />AS REQUIRED TO CERTIFY THE METHODS AND MATERIALS ARE IN ACCORDANCE WITH PROJECT SPECIFICATIONS. THE <br />CONTRACTOR SHALL COORDINATE THE APPROPRIATE SOILS INSPECTIONS AND TESTING. <br />13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE TRAFFIC CONTROL DURING CONSTRUCTION <br />ADJACENT TO OR WI THIN ALL PUBLIC ROADWAYS. TRAFFIC CONTROL MEASURES SHALL BE IN PLACE PRIOR TO ANY <br />CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL MAINTAIN ACCESS TO ALL PRIVATE PROPERTY DRIVEWAYS DURING <br />CONSTRUCTION. <br />CLEARING AND GRADING NOTES <br />A. ALL ENVIRONMENTALLY SENSITIVE AREAS AND THEIR BUFFERS SHALL BE FLAGGED FOR EASY IDENTIFICATION BEFORE <br />CLEARING TAKES PLACE. AFTER THESE AREAS ARE FLAGGED AND CLEARING LIMITS ARE APPROVED, AN AREA WIDE <br />ENOUGH TO INSTALL A SILT FENCE AT THE CLEARING LIMITS, BY HAND OR BY MECHANICAL METHODS, MAY BE <br />CLEARED. THE TOP OF THE SILT FENCE SHALL BE REFLAGGED AFTER INSTALLATION. IF A SILT FENCE IS NOT <br />REQUIRED, THE AREA SHALL BE DELINEATED USING AN ORANGE BARRIER. <br />B. ALL PERIMETER EROSION AND SEDIMENT CONTROL SHALL BE CONSTRUCTED, OPERATIONAL, AND INSPECTED BY THE <br />PUBLIC WORKS INSPECTOR PRIOR TO INITIATION OF CLEARING AND GRUBBING OPERATIONS. <br />C. DANGER TREES SHALL BE IDENTIFIED THROUGH A JOINT INSPECTION INVOLVING BOTH THE DEVELOPER AND PUBLIC <br />WORKS INSPECTOR. NO TREES SHALL BE REMOVED UNTIL PERMISSION IS OBTAINED FROM THE APPROPRIATE PARTIES. <br />D. WHERE POSSIBLE, NATURAL VEGETATION SHALL BE MAINTAINED FOR EROSION AND SEDIMENT CONTROL. <br />E. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE EROSION CONTROL FACILITIES SHALL BE <br />MAINTAINED AND/OR ALTERED AS REQUIRED TO ENSURE CONTINUING EROSION/SEDI MEN T CONTROL. <br />F. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL <br />SUCH TIME THAT CLEARING AND OR CONSTRUCTION IS COMPLETED, PERMANENT DRAINAGE FACILITIES ARE <br />OPERATIONAL, AND THE PO TEN I AL FOR EROSION HAS PASSED. <br />CITY OF EVERETT STANDARD PLAN NOTES <br />CLEARING AND GRADING <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR <br />DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES. <br />2. THE IMPLEMENTATION OF THESES ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC <br />FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND <br />VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO <br />CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. <br />THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTI VI TIES, <br />AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, <br />ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENT FOR ANTICIPATED SITE CONDITIONS. DURING THE <br />CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE <br />THAT SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE APPLICANT/CONTRACTOR TO ENSURE THEIR <br />CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WI THIN THE 48 <br />HOURS FOLLOWING A MAJOR STORM EVENT. <br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH <br />BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT <br />LADEN WATER INTO THE DOWNSTREAM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE <br />DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR <br />THE DURATION OF THE PROJECT. <br />10. THE CONTRACTOR SHALL BE PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS <br />FAIL. IF BMPS FAIL AND SEDIMENT -LADEN WATER IS LEAVING THE SITE, IMMEDIATELY NOTIFY YOUR PUBLIC WORKS INSPECTOR. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 <br />THROUGH APRI L 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH SEP TEMBER 30. <br />13. NOTIFY THE CITY PUBLIC WORKS INSPECTOR AT LEAST 24 HOURS PRIOR TO DEWATERING ACTIVITIES. HANDLE HIGHLY TURBID OR <br />OTHERWISE CONTAMINATED DEWA TERING WATER SEPARATELY FROM STORMWA TER. <br />14. THE APPROVED PROJECT PUBLIC WORKS PERMIT AND SWPPP SHALL BE RETAINED ON SITE OR READILY AVAILABLE TO THE <br />CONTRACTOR THROUGHOUT THE DURATION OF THE CONSTRUCTION PROJECT. <br />15. DESIGN, INSTALL, IMPLEMENT, AND MAINTAIN EFFECTIVE POLLUTION PREVENTION MEASURES TO MINIMIZE THE DISCHARGE OF <br />POLLUTANTS. <br />16. PROTECT ALL LID BMPS FROM SEDIMENTATION THROUGH INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENT CONTROL BMPS <br />ON PORTIONS OF THE SITE THAT DRAIN INTO THE LID BMPS. <br />STORM DRAINAGE <br />1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED OR PUT INTO USE UNTIL IT HAS BEEN INSPECTED, TESTED, <br />AND ACCEPTED BY THE CITY OF EVERETT. <br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS <br />AND THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION). <br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN FOR <br />CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY <br />ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY <br />THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO <br />COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. <br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND GRADE <br />PRIOR TO STARTING CONSTRUCTION. <br />5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE, DRAINS TO STREAM, LAKE, RIVER, PUGET SOUND, OR <br />WETLAND." CHOOSE APPROPRIATE FEATURE FOR THE PROJECT. <br />6. DESIGN SHALL COMPLY WITH THE EVERETT MUNICIPAL CODE (EMC), CITY ADOPTED STORMWATER MANAGEMENT MANUAL, POLICIES, <br />AND CRITERIA SET FORTH IN THE CITY OF EVERETT'S DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS. <br />WATER <br />A. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY MEANS OF AN APPROVED BACKFLOW PREVENTION DEVICE <br />PRIOR TO SATISFACTORY FLUSHING, TESTING, DISINFECTION, AND RECEIPT OF SATISFACTORY BACTERIOLOGICAL TEST RESULTS <br />B. CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE CITY UTILITIES DEPARTMENT AT THE DEVELOPER'S EXPENSE. <br />THE CITY UTILITIES DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUSINESS DAYS NOTICE FOR EACH CONNECTION. THE CITY UTILITIES <br />DEPARTMENT SHALL THEREAFTER DETERMINE THE DATE AND TIME AT WHICH THE CONNECTION SHALL BE MADE. <br />C. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT STANDARDS. <br />D. A PRE -CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE START OF CONSTRUCTION. THE CITY OF EVERETT <br />ENGINEERING DEPARTMENT CONSTRUCTION DIVISION MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO COMMENCEMENT OF <br />CONSTRUCTION. <br />E. THE DEVELOPER OR THE DEVELOPER'S AUTHORIZED AGENT SHALL NOTIFY THE CITY OF UTILITIES DEPARTMENT OF A PERSON WHO <br />CAN BE CONTACTED REGARDING PROBLEMS DURING CONSTRUCTION ON A 24 HOUR BASIS. <br />F. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL SEPARATION BETWEEN POTABLE AND NON -POTABLE <br />CONVEYANCE SYSTEMS. <br />G. ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY CITY UTILITIES DEPARTMENT PERSONNEL ONLY. ALL VALVES, NEW AND <br />EXISTING, SHALL BE ACCESSIBLE AT ALL TIMES. <br />SANITARY SEWER <br />A. ALL WORK AND MATERIALS SHALL CONFORM TO THE CITY OF EVERETT STANDARDS AND WSDOT/APWA STANDARD SPECIFICATIONS. <br />B. NO PART OF THE SANITARY SEWER SYSTEM SHALL BE COVERED, CONCEALED OR PUT INTO USE UNTIL IT HAS BEEN TESTED, <br />INSPECTED, AND APPROVED BY THE CITY INSPECTOR. <br />C. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN FOR <br />CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY <br />ADDITIONAL UTILITIES NOT SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL <br />NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO <br />COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. <br />D. ALL SEWER MAIN EXTENSIONS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND <br />GRADE PRIOR TO STARTING CONSTRUCTION. <br />G. AT A MINIMUM, EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE MAINTAINED MONTHLY, OR FOLLOWING EACH <br />RUNOFF -PRODUCING STORM, TO ENSURE PROPER OPERATION OF ALL EROSION AND SEDIMENT CONTROL FACILITIES. <br />H. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN, SIZE, NOR LOCATION OF PERMANENT <br />PIPES, RESTRICTORS, OR DETENTION FACILITIES, BUT IS AN APPROVAL OF EROSION AND SEDIMENT CONTROL BMP'S <br />ONL Y. <br />I. THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN. TRACKING OF MUD AND DEBRIS FROM THE SITE WILL NOT BE <br />ALLOWED. FAILURE TO COMPLY WITH THIS CONDITION WILL RESULT IN ALL WORK ON THE SITE BEING STOPPED. <br />J. THE WASHINGTON STATE CLEAN AIR ACT REQUIRES THE USE OF ALL KNOWN, AVAILABLE, AND REASONABLE MEANS OF <br />CONTROLLING AIR POLLUTION, INCLUDING DUST. DUST CAN BE CONTROLLED BY WETTING EXPOSED SOILS, WASHING <br />TRUCK WHEELS BEFORE THEY LEAVE THE SITE, AND INSTALLING AND MAINTAINING ROCK CONSTRUCTION ENTRANCES. <br />CONSTRUCTION VEHICLE TRACKOUT IS A MAJOR SOURCE OF DUST AND ANY EVIDENCE OF TRACK -OUT CAN TRIGGER <br />FINES FROM THE DEPARTMENT OF ECOLOGY OR THE PUGET SOUND AIR POLLUTION CONTROL AGENCY. <br />K. EVERY EFFORT SHALL BE MADE TO CLOSE UTILITY LINES BY THE END OF THE DAY AND MATERIAL EXCAVATED DURING <br />UNDERGROUND UTILITY CONSTRUCTION SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES (WHERE CONSISTENT WITH <br />SAFETY AND SPACE CONSIDERATIONS). <br />Copyright © 2023 CPH Consultants, LLC. All Rights Reserved. <br />} o 0 <br />m 2 2 <br />W <br />0 <br />a <br />z <br />0 <br />� <br />� <br />U <br />Q <br />� <br />w <br />� <br />m <br />a <br />o <br />LU <br />H <br />M <br />N <br />N <br />M <br />N <br />N <br />z <br />C� �J wLY`��� <br />4JVAL <br />�01 <br />54944 <br />THE AS -BUILT INFORMATION <br />SHOWN ON THIS PLAN IS PER <br />A FIELD SURVEY PERFORMED <br />BY MEAD GILMAN ASSOCIATES <br />AND/OR RECORD DATA <br />PROVIDED BY THE <br />CONTRACTOR. <br />LU)LI <br />O <br />J <br />Q <br />� <br />0 <br />Wz <br />z <br />o <br />L1 <br />O <br />U..1 <br />� <br />� <br />z <br />Q <br />z <br />� <br />- <br />� <br />z <br />O <br />W <br />O <br />� <br />Q <br />`L I <br />z <br />m <br />O <br />O <br />m <br />U <br />- <br />v <br />0 <br />z <br />L1 <br />J <br />O <br />W <br />CLu <br />J <br />Lu <br />w <br />w <br />CLIENT <br />PACIFIC RIDGE HOMES <br />17921 BOTHELL-EVERETT HWY <br />SUITE 100 <br />BOTHELL, WA 98012 <br />C P III <br />CONSULTANTS <br />Site Planning • Civil Engineering <br />Landscape Architecture • Land Use Consulting <br />11321-13 NE 120th Street <br />Kirkland, WA 98034 - (425) 285-2390 <br />101 South Wenatchee Avenue, Suite C3 <br />Wenatchee, WA 98801 - (509) 293-7731 <br />www.cphconsuItants.com <br />PROJECT NO. <br />0132-21-023 <br />DRAWING <br />CO-01 <br />SHEET 2 OF 36 <br />