Laserfiche WebLink
RECORD DRAWING MAY 2024 <br />A PORTION OF SECTION 18, TOWNSHIP 28 NORTH, RANGE 05 EAST, W.M. <br />UNDERGROUND UTILITIES NOTES: <br />V) <br />a) <br />O <br />z <br />C <br />O <br />U <br />V) <br />C <br />O <br />J <br />Q <br />J <br />i <br />N <br />(D <br />n <br />i <br />O <br />O <br />O <br />n <br />V) <br />(D <br />E <br />O <br />(D <br />Y <br />U <br />U <br />0 <br />LEGEND <br />- - - <br />Boundary Line <br />- - - <br />Design Right -of -Way Line <br />Existing Right -of -Way Line <br />Design Major Contour Line <br />Existing Major Contour Line <br />Design Minor Contour Line <br />Existing Minor Contour Line <br />Phase Line <br />Design Tract Line <br />Design Lot line <br />Existing Lot Line <br />- - <br />Design Easement Line <br />Existing Easement Line <br />- <br />Design Road Centerline <br />Existing Road Centerline <br />Site Benchmark <br />Existing Benchmark <br />Design Edge of Asphalt <br />Existing Edge of Asphalt <br />Design Sidewalk <br />Existing Sidewalk <br />Design Driveway Line/Hatch <br />-------- <br />Existing Path <br />Design Building <br />- - <br />- - - <br />Existing Building <br />------------ <br />Design Building Setback Line <br />Design Storm Drainage Line <br />_SD_ <br />SD I I I SDI E <br />Existing Storm Drainage Line <br />❑❑ <br />❑ <br />Design/Existing Type 1 Catch Basin <br />00 <br />Design/Existing Type 2 Catch Basin <br />• <br />0 <br />Design/Existing Storm Drain Clean -out <br />YD <br />Design Yard Drain Line <br />❑❑ <br />❑ <br />Design Yard Drain Catch Basin <br />• <br />O <br />Design Yard Drain Clean -out <br />Imo° Pao <br />f S <br />S S <br />Design Shed Dispersion <br />f f <br />f f <br />Design Drainage Basin <br />- <br />- - <br />Design Swale Line <br />- <br />Existing Ditch line <br />ss <br />Design Sanitary Sewer Line <br />-- ss - <br />Existing Sanitary Sewer Line <br />00 <br />Design/Existing Sanitary Sewer Manhole <br />• <br />0 <br />Design/Existing Sanitary Sewer Clean -out <br />ss <br />Design Sanitary Side Sewer <br />UNDERGROUND UTILITY NOTE <br />Underground utility locations shown hereon are based <br />upon surface indicators. No underground location <br />service was utilized for their location. The use of this <br />map for their exact location is not warranted. Prior to <br />construction user should call the utility location service <br />at 1-800-424-5555 48 hours before construction. <br />Design Path <br />Design Filter Strip <br />W <br />Design Water Line <br />Design Area of Disturbance <br />I <br />-- W--- W- <br />Existing Water Line <br />X <br />Design Temporary Silt Fence <br />A -O <br />Design/Existing Water Hydrants <br />° <br />Temporary Construction Entrance <br />19 ® <br />Design/Existing Water Fittings <br />O ### <br />Existing Soil Log <br />X - <br />Design Fence <br />### <br />BMP Designations <br />X - <br />Existing Fence <br />- - <br />Existing Wetland Line/Hatch <br />Designed Bioretention Cell <br />/Rain Garden <br />- - <br />Design Buffer Line/Hatch <br />- - <br />Existing Buffer Line/Hatch <br />v <br />7-2.7-Z D <br />- <br />Existing Section Line <br />Existing Section Symbol <br />`� <br />Dispersion Trench / Level Spreader <br />--OHP---OHI <br />Existing Power Line <br />1 <br />Existing Power Symbol <br />' <br />- -T - - -T - <br />Existing Telephone Line <br />Existing Telephone Symbol <br />Ql Q2 3Q <br />NGPA signs <br />-- G - -- G- <br />Existing Gas Line <br />Existing Gas Symbol <br />Existing Flow Path <br />Existing Tree Drip Line <br />RECORD DRAWING <br />This Record Drawing has been prepared, in part, based on <br />information gathered during construction and historical <br />documents. Although the information and this drawing are <br />based on the best available information, no presumption <br />s a regarding the drawing's accuracy. <br />gned By Date <br />TYLER FOSTER, P.E. <br />Print Name and Title <br />1. The WSDOT/ APWA Standard Specification shall apply unless otherwise stated below. <br />2. When trenching through existing pavement, the open cut shall be a neat line made by either saw cutting orjackhammering <br />a continuous line. Saw cutting will be required unless the cut is made prior toe reconstruciton or an overlay. <br />3. Temporary pavement patch shall be accomplished by using cold mix (MC 250), ATB or steel plates. <br />4. Permanent pavement patch shall be as specified on Standard Drawing 326. <br />5. Where trench excavation equals or exceeds a depth of 4 feet, the developer/contractor shall privide, construct, maintain <br />and remove as required, safety systems that meet the requirements of the Washington Industrial Safety and Health Act, RCW <br />49.17, including WAC 296-155. The trench safety systems shall be designed by a qualified person and meet accepted <br />engineering requirements (see WAC 296-155-660). <br />6. The developer/contractor shall furnish, inntall, and operate all necessary equipment to keep excavations above the <br />foundation level free from water during construction, and shall dewater and dispose of the water so as not to cause injury to <br />public or private property or nuisance to the public. Sufficient pumping equipment in good working condition shall be <br />available at all times for all emergencies, including power outage, and shall have available at all times competent workmen <br />for the operation of the pumping equipment. Water pumped from the trench shall be disposed of using best management <br />practices and shall not be pumped into streams nor to storm drains near streams. <br />7. Compaction tests will be required to ensure adequate compaction on all lifts. All compaction tests shall be considered by a <br />licensed testing laboratory at the expense of the developer/contractor. <br />8. Reference to the City Engineer below means the city's representative on site. <br />9. Water setting of backfill in trenches is not permitted. <br />STORM DRAINAGE NOTES: <br />1. No part of the drainage system shall be covered, concealed, or put into use until it has been inspected, tested, and <br />accepted by the City of Everett. <br />2. All work and material shall conform to the City of Everett Design and Construction Standards and Specifications and the <br />WSDOT/SPWA Standard Specifications for Road, Bridge, and Municipal Construction (Current Edition). <br />3. Approximate locations of existing utilities have been obtained from available records and are shown for conveyance. The <br />contractor shall be responsible for verification of locations and to avoid damage to any additional utilities shown. If conflicts <br />with existing utilities arise during construction, the contractor shall notify the Public Works Inspector and any changes required <br />shall be approved by the City Engineer prior to commencement of related construction on the project. <br />4. All storm systems within the public right-of-way or in easements must be staked by survey for line and grade prior to starting <br />construction. <br />5. All catch basin grates must be stenciled or stamped "Dump no Waste, Drains to Stream, Lake, River, Puget Sound, or <br />Wetland." Choose appropriate feature for the project. <br />6. Design shall comply with the Everett Municipal Code (EMC), City adopted Stormwater Management Manual, policies and <br />criteria set forth in the City of Everett's Design and Construction Standards and Specifications. <br />EROSION/SEDIMENTATION CONTROL NOTES: <br />1. Approval of this erosion/sedimentation control (ESC) plan does not constitute an approval of permanent road or drainage <br />design (e.g. size and location of roads, pipes, restrictors, channels, retention facilities, utilities). <br />2. The implementation of these ESC plans and the construction, maintenance, replacement, and upgrading of these ESC <br />facilities is the responsibility of the applicant/contractor until all construction is completed and approved and <br />vegetation/landscaping is established. <br />3. The boundaries of the clearing limits shown on this plan shall be clearly flagged in the field prior to construction. During the <br />construction period, no disturbance beyond the flagged clearing limits shall be permitted. The flagging shall be maintained <br />by the applicant/contractor for the duration of construction. <br />4. The ESC facilities shown on this plan must be constructed in conjunction with all clearing and grading activities, and in such a <br />manner as to ensure that sediment and sediment laden water do not enter the drainage system, roadways, or violate <br />applicable water quality standards. <br />5. The ESC facilities shown on this plan are the minimum requirements for anticipated site conditions. During the construction <br />period, these ESC facilities shall be upgraded as needed for unexpected storm events and to ensure that sediment -laden <br />water do not leave the site. <br />6. The ESC facilities shall be inspected routinely and maintained bye the applicant/ contractor to ensure their continued <br />functioning, especially after storm events. <br />7. The ESC facilities on inactive site shall be inspected and maintained a minimum of once a month or within the 48 hours <br />following a major storm event. <br />8. At no time shall more that one foot of sediment be allowed to accumulate within a trapped catch basin. All catch basins <br />and conveyance lines shall be cleaned prior to paving. The cleaning operation shall not flush sediment -laden water into the <br />downstream system. <br />9. Stabilized construction entrances shall be installed at the beginning of construction and maintained for the duration of the <br />project. Additional measures may be required to ensure that all paved areas are dept clean for the duration of the project. <br />10. The Contractor shall provide periodic street cleaning to remove debris and sediment tracked off the site. <br />11. Appropriate measures shall be taken to stop sediment from entering surface water bodies if the proposed BMP's fail. If BMP's <br />fail and sediment -laden water is leaving the site, immediately notify your Public Works Inspector. <br />12. Bare and/or disturbed soils shall remain uncovered and/or unstabilized for no more than 2 days from October 1 through April <br />30, and for no more than 7 days from May 1 through September 30. <br />13. Notify the City Public Works Inspector at least 24 hours prior to dewatering activites. Handle highly turbid or otherwise <br />contaminated de -watering water separately from stormwater. <br />14. The approved project Public Works permit and SWPPP shall be retained on site or readily available to the contractor <br />throughout the duration of the construction project. <br />15. Design, install, implement, and maintain effective pollution prevention measures to minimize the discharge of pollutants. <br />16. Protect all LID BMP's from sedimentation through installation and maintenance of erosion and sediment control BMP's on <br />portions of the site that drain into the LID BMP's. <br />WATER DISTRIBUTION NOTES: <br />1. No connection to the existing mains will be allowed except by means of an approved backflow prevention device prior to <br />satisfactory flushing, testing, disinfection, and receipt of satisfactory bacteriological test results. <br />2. Connections to and taps on existing mains will be made by the Public Works Department at the developer's expense. The <br />Public Works Department shall be given at least 5 business days notice for each connection. The Public Works Department <br />shall thereafter determine the date and time at which the connection shall be made. <br />3. All work and materials must conform to City of Everett Standards. <br />4. A pre -construction meeting shall be held with the City prior to the start of construction. The City of Everett Public Works <br />Construction Division must be notified at least 24 hours prior to commencement of construction. <br />5. The developer or the developer's authorized agent shall notify the Public Works Department of a person who can be <br />contacted regarding problems during construction on a 24 hour basis. <br />6. Maintain a minimum of 10 feet horizontal and 18 inches vertical separation between potable and non -potable conveyance <br />systems. <br />7. All City of Everett valves shall be operated by Public Works Department personnel only. All valves, new and existing, shall be <br />accessible at all times. <br />SANITARY SEWER NOTES: <br />1. All work and materials shall conform to the City of Everett Standards and WSDOT/APWA Standard Specifications. <br />2. No part of the sanitary sewer system shall be covered, concealed or put into use until it has been tested, inspected, and <br />approved by the city inspector. <br />3. Approximate locations of existing utilities have been obtained from available records and are shown for convenience. The <br />contractor shall be responsible for verification of locations and to avoid damage to any additional utilities not shown. If <br />conflicts with existing utilities arise during construction, the contractor shall notify the public works inspector and any changes <br />required shall be approved by the City Engineer prior to commencement of related construction on the project. <br />4. All sewer main extensions within the public right-of-way or in easements must be staked by survey for line and grade prior to <br />starting construction. <br />0) <br />UJ <br />s <br />UJ <br />2 <br />i r <br />uJ <br />Z cY) <br />N <br />CN <br />�C,N <br />Q o. <br />> > i <br />Q >, L0 <br />7C) � <br />O <br />~ C'7 <br />O <br />N00 <br />N <br />0 <br />N <br />,Y) <br />01 <br />01 <br />Q <br />o <br />U <br />0 <br />� - � ill► <br />� <br />� <br />l <br />����•�p\\�"IIIIII„dIIIIL„111111„�����aiip�,,, <br />53726 /1Z <br />REGISTERED ��� <br />Fss/oN A� ��G <br />O <br />N <br />O <br />L Q w <br />w <br />Q z Q <br />O <br />LUo° � 0 o O <br />U LU z Q z CL <br />LUU w O - <br />U Q cn Q <br />0 = LU � CL � w co <br />p <br />w 0 0 0 cn w Q <br />i <br />il <br />F_ <br />Cl) <br />¢ <br />w <br />L0 <br />0 <br />w <br />z <br />00 o ¢ <br />N <br />00 = <br />o, F_ <br />Q rr <br />3� 0 <br />} z <br />N 00 <br />N n <br />w = <br />w Cl) <br />V z <br />> O <br />Q F- <br />-C 00 <br />%T <br />O 0 <br />o F- <br />U <br />w <br />ILL <br />z <br />0 <br />F_ <br />M <br />a_ <br />LU <br />O <br />Z <br />Z <br />O <br />U <br />ry <br />V) <br />z <br />O <br />U <br />J <br />m <br />V) <br />Q <br />SHEET <br />C2 of C27 <br />24x36 <br />REV1122-047 <br />P W 2303-015 <br />