Laserfiche WebLink
RECORD DRAWING MAY 2024 <br />A PORTION OF SECTION 18, TOWNSHIP 28 NORTH, RANGE 05 EAST, W.M. <br />CONSTRUCTION SWPPP <br />EROSION/SEDIMENTATION CONTROL NOTES: <br />LEGEND <br />BoundaryL/ne <br />• • • • - <br />Existing Section Line <br />Exis1117gRigl7lO/Way Line <br />Ex/st/ngLotL/ne <br />- - - - - - <br />Ex/st/ngEasementL/ne <br />- <br />Existing Road Centellne <br />'-'-'-'-'-'-'-'- - <br />r-- a <br />Existing Edge o1Aspha/t <br />I In I <br />L I <br />Existing SIdewalk <br />- - - - - <br />- - - - - - - <br />ExistingMajorContourLine <br />Existing 1WI17of Con to ur Line <br />- - SD - - - SD - - <br />Existing Storm Drainage Line <br />-�-�- <br />Existing Ditchline <br />- - ss - - - ss - - <br />Existing ScMlcly SewerLine <br />-- w--- w-- <br />Ex/st/ngWaterL/ne <br />X <br />Existing fel7Ce <br />- - oHP - - - oHP - - <br />Existing PowerLine <br />Existing Te%phone Line <br />- - G - - - G - - <br />Existing Gas Line <br />- -, , - , / - - -t> <br />ExistingF/owPath <br />Area o/D/sturbance <br />/C/earingUmits/ <br />_� E __ <br />Existing Section Symbol <br />® <br />Ex/st/ngMonument <br />D0) <br />Existing Type I Catch Basin <br />SQ <br />Existing Scn11qy SowerManhote <br />Y <br />Existing WaterHydrants <br />Ell <br />Existing WaterMeters <br />WV <br />X <br />Existing WaterF/IlIngs <br />-0- <br />Existing PowerSymbo/ <br />Existing Telephone Symbol <br />Gv <br />X <br />Existing Gas Symbol <br />O # # # <br />Existing Soil Log <br />U <br />Existing Sign <br />0 <br />Existing zigbt <br />® <br />Ex/st/ngMcllbox <br />EXISTING WETLAND <br />EXISTING BUFFER <br />BMP'S (to be aoolied as worooriate <br />ELEMENT #1: PRESERVE VEGETATION/MARK CLEARING LIMITS <br />ELEMENT #6: PROTECT SOILS <br />• <br />C101 <br />Preserving Natural Vegetation <br />• <br />C120 Temporary and Permanent Seeding <br />• <br />C102 <br />Buffer Zones <br />• <br />C130 Surface Roughening <br />• <br />C103 <br />High Visibility Fence <br />• <br />C131 Gradient Terraces <br />• <br />C200 Interceptor Dike and Swale <br />ELEMENT #2: ESTABLISH CONSTRUCTION ACCESS <br />0 <br />C201 Grass -Lined Channels <br />• <br />C105 <br />Stabilized Construction Entrance/Exit <br />0 <br />C203 Water Bars <br />• <br />C106 <br />Wheel Wash <br />• <br />C204 Pipe Slope Drains <br />• <br />C107 <br />Construction Road/Parking Area Stabilization <br />• <br />C205 Subsurface Drains <br />• <br />C206 Level Spreader <br />ELEMENT #3: CONTROL FLOW RATES <br />C207 Check Dams <br />• <br />C203 <br />Water Bars <br />• <br />C208 Triangular Silt Dike (Geotextile-Encased <br />• <br />C240 <br />Sediment Trap <br />Check Dam) <br />• <br />C241 <br />Temporary Sediment Pond <br />• <br />Not Applicable to This Example <br />• <br />Not Applicable to My Project <br />ELEMENT #7: <br />PROTECT DRAIN INLETS <br />ELEMENT #4: INSTALL <br />SEDIMENT CONTROLS <br />0 <br />C220 Storm Drain Inlet Protection <br />• <br />C231 <br />Brush Barrier <br />• <br />C232 <br />Gravel Filter Berm <br />ELEMENT #8: STABILIZED CHANNELS AND OUTLETS <br />• <br />C233 <br />Silt Fence <br />• <br />C202 Channel Lining <br />• <br />C234 <br />Vegetated Strip <br />• <br />C209 Outlet Protection <br />• <br />C235 <br />Wattles <br />• <br />Not Applicable to My Project <br />• <br />C240 <br />Sediment Trap <br />• <br />C241 <br />Temporary Sediment Pond <br />ELEMENT #9: <br />CONTROL POLLUTANTS <br />• <br />C151 Concrete Handling <br />ELEMENT #5: <br />STABILIZE SOILS <br />C152 Sawcutting and Surfacing Pollution <br />• <br />C120 <br />Temporary and Permanent Seeding <br />Prevention <br />• <br />C121 <br />Mulching <br />• <br />C153 Material Delivery, Storage and Containment <br />• <br />C122 <br />Nets and Blankets <br />• <br />C154 Concrete Washout Area <br />• <br />C123 <br />Plastic Covering <br />• <br />C250 Construction Stormwater Chemical <br />• <br />C124 <br />Sodding <br />Treatment <br />• <br />C125 <br />Topsoiling/Composting <br />• <br />C251 Construction Stormwater Filtration <br />• <br />C126 <br />Polyacrylamide for Soil Erosion Protection <br />• <br />C252 High PH Neutralization Using CO2 <br />• <br />C130 <br />Surface Roughening <br />• <br />C253 PH Control for High PH Water <br />• <br />C131 <br />Gradient Terraces <br />• <br />Not Applicable to My Project <br />• <br />C140 <br />Dust Control <br />ELEMENT #10: <br />CONTROL DEWATERING <br />• <br />C236 Vegetated Filtration <br />• <br />Not Applicable to My Project <br />ELEMENT #11: MAINTAIN BMPS <br />• C150 <br />Materials on Hand <br />• C160 <br />Certified Erosion and Sediment Control Lead <br />ELEMENT #12: MANAGE THE PROJECT <br />• C150 <br />Materials on Hand <br />• C160 <br />Certified Erosion and Sediment <br />• C162 <br />Scheduling <br />ELEMENT #13: PROTECT LOW IMPACT DEVELOPMENT <br />• C102 <br />Buffer Zones <br />• C103 <br />High Visibility Plastic or Metal Fence <br />• C200 <br />Interceptor Dike and Swale <br />• C207 <br />Check Dams <br />• C208 <br />Triangular Silt Dike <br />• C231 <br />Brush Barrier <br />• C233 <br />Silt Fence <br />• C234 <br />Vegetated Strip <br />RECORD DRAWING <br />This Record Drawing has been prepared, in part, <br />based on "As -Built" information provided by <br />others. Though the as -built information and this <br />drawing are based on the best available <br />information, no presumption should be made <br />regarding the drawing's accuracy. <br />Jim Knappert 05/16/2024 <br />Permit Inspector <br />\ \ ` � � I I � I I ( I I--- --- i j ---I --�' --- =- o -- - _ \ � - - i I I �/ <br />I I I �- I J% I i c i i J I I °� ; i I /� / I <br />I I\ I O h-, _Oo I O� O I r_I 00 k� 0 I �� O I I Op O I r--$-- I I r O o O I \O � r� Q z ��I �c _ �_ __1I L <br />O y0 O O I \ - <br />/ QQa� I op c�N I I ���� I b��Q I I h pU396 I h S, I I �� I r� Sao I O_ I o O J�q, �_ - <br />I �, I I O Oe- I p r ��- r�°� o 1 <br />0o I h` h �o I SIN h o I - <br />aa°� /1 ``� ono. I I O ��°` �.� O I �� I e� o O� �,.a,I I a c J�IIN II N <br />/ I I 1 , O�QQ I Op ��Q I I OI cQ I I o'C CQ I I o Q I - icy Q�I-� � �°� i I y / o. I p ��oo• I o <br />\-------- I c O� o o o c I <br />I O c I � I I \O I I O Q)� I "` � I 0��� I I O I�� I o��Q II \ ` �v <br />O O I I l I �� �I�o���Y.\'� I �� I I � 1'll OO § I <br />I ' I I I a 4Zzi I I I I I �� I I I ����. I I I I %� I/go��. r �� I I I \ --- r- <br />1I O o� Y. I i\ I I \O N. I I Q Z1 I O c k I I O �'�o °�o,�• I J� / I O ca <br />OII433-000-OS9100 c.% I o e m I "� ;� I °� �, ` o �° ly I I 11 a O I o �. I i I <br />I h) o ` I h°ts I o O I I ��o O (� 0 1 0 II Imo• 0� I I c �h I "� L`V m � �� c`�O �o"` II N_ <br />J(J �I Arno/dPBorre�e-, o f �I 10 h' I o �O �i, I I( o a�i ail I---�_ 01 �i, I i I�r �' o O 0 I �` �I a, I I o o �' // �52 <br />• I 1 I I- 1 9' R��& I - v I O C � I I 1 I \ 1 I b-6 i i Z` I p Q�' c' I �' I o I �- _ <br />( I - - J <br />� _ I - -I ( r \ `1=°�► n . I L / � I / ° �' I ISO � � I I o �o Z �' I I = `L� I <br />1 � E I e ---- --- --- � h - = `I - - I` •h I `L <br />/ I 1 I+-- P d 1(0 ik I -- 1 I - _natural Sege tiara ----� I --- � �' I __ r <br />--- �-J-y------ -___-� �_ - _ T I --,c I I ,---1_Preser�Ying <br />J - - r 1 ( � C 101 / Ex. BoardFence 497 1 ' S890 4 ' 41 "E C 1 O 1 � x. - Fence Li W _t --_ ton /\ l <br />•-------- � C�,,, <br />//� 1I I I / - �--, - I�77-�- I I C233 C2 C1Q1i_-I , _ <br />,-� \ I 1 OII376-ODO-004-Od .ilt Fence �'- ` -r -� I <br />i I I Net Vanthoroth I ,L -� � _ Silt F nce o e m ved) - - - 4. Silt Fen e � \ \ <br />I rl \ I I .9' Existing Upstream drainage through site to _�- - \ - ` � <br />(I I I NgetSamanthb&- am I r '- `-b be maintained through construction until - . -� -� <br />J ( I I y 94213rdA�e �, I b pass system is fully functional. This may IExr //ngParkr�i9 & �-c -� -.� - T <br />\ I Everett, WAI 9�208 ° ° ° Orrvewayl ' c <br />J \ I I ) I 0 1 ° ° ° .0 require retention of existing pipe and \ s° N. o � �) � \ "520� <br />\ , I(to be remo ed) I ! <br />V �' p 280 003-0. 0, 0 - - <br />\ I / � \ 4�_-_---_-_I ° remov I c bypass system is on <br />�° ° e ` �\ a- _ I .r Ever een Contracting <br />\ �� - - - }Q� i s° . - p 3 � y �, (b Ur�nown Addresses , - <br />f-L---------- I ` � \ � / - - _ � �, o � !'Everett, WA-98208 s/� <br />\ J '/ r 1 I 1 DII376-000-OD,5�r00 ( l / ExistingL I ° ° CQr7crete r / ` _ - ,� 520-2 _ J <br />III I r H�y�Soohea& ChhorGr�C'b.�ear�g Barrier/ / to be remov d � `s � - � <br />PW233rdAveSE V0 to be rem ed / � ° ° � ,/ X%_ _! 7777 _ _ ' / <br />( I I , Everett, WA 98208 I \ a 11 \ �/ / / � � - 14 rn f r SI <br />The 13 elements that are part of a Construction SWPPP are as follows: <br />1. Mark Clearing Limits: Prior to clearing or disturbing the limits must be marked. This <br />element is part of most normal construction plans as one of the first steps. <br />2. Establish Construction Access: All erosion control plans shall install a stabilized <br />construction entrance (or other method of preventing sediment transport onto the <br />roads). If a standard gravel construction entrance is proposed, use geo-textile fabric <br />under the rock. Note: a wheel wash is required for plans that propose winter grading. <br />3. Detain Flows: Based on a downstream analysis it may be necessary to detain runoff from <br />a site under construction. It may be necessary to construct and use a detention pond to <br />control flows during construction. <br />4. Install Sediment Controls: If there is runoff from the construction site, sediment shall be <br />removed from the water. Note that the water quality standards must be met. <br />5. Stabilize Soils: All exposed and non -worked soil shall be stabilized by use of BMP's. Note <br />there are time periods of allowed exposure that depend on the season. Groundcover <br />both temporary and permanent need to be part of the construction plans. <br />6. Protect Slopes: Cut and fill slopes need to be protected from erosive flows and <br />concentrated flows until permanent cover and drainage conveyance systems are in <br />place. <br />7. Protect Drain Inlets: All storm drain inlets require protection from sediment and silt laden <br />water. <br />8. Stabilize Channels and Outlets: Temporary and permanent conveyance systems shall be <br />stabilized to prevent erosion during and after construction. Culvert outlets require <br />protection. <br />9. Control Pollutants: The plan shall show how all pollutants, including waste materials and <br />demolition debris, will be handled. This includes maintenance of construction <br />equipment, fertilizers, application of chemicals, and water treatment systems. <br />10. Control De -Watering: The water from de -watering systems for trenches, vaults and <br />foundations shall be discharged into a controlled system. <br />11. Maintain BMPs: The plan shall provide for inspection and maintenance of the planned <br />and installed construction BMPs as well as their removal at the end of the project. <br />12. Manage the Project: The plan shall outline how the site shall be managed for erosion <br />control and identify the management team. It needs to cover phasing, training, <br />pre -construction conference, coordination with utilities and contractors, monitoring and <br />reporting. It shall provide for notice of problems, revisions during construction and <br />contingency planning. One of the most important elements in the management of the <br />project is planning for contingencies based on the risk of exposure during phases of the <br />development. It is essential that planning is ongoing throughout the life of the project. <br />13. Protect on -Site stormwater management BMPs for runoff from roofs and other hard surfaces. On -site <br />g <br />Stormwater Management BMPs shall be protected at all times during the construction <br />process. This may mean that stormwater management BMPs will be installed towards the end of <br />the construction process to avoid siltation and compaction. <br />LAND DISTURBING AREA <br />Total Site Area <br />Land Disturbing Activity <br />Conceptual Area of <br />Disturbance <br />295,064 sf (6.77 ac) <br />263,574 sf (6.05 ac) <br />AQUIFER RECHARGE/ <br />WELL HEAD PROTECTION <br />Low, Over 100 <br />SOILS <br />1. Approval of this erosion/sedimentation control (ESC) plan does not constitute an <br />approval of permanent road or drainage design (e.g. size and location of roads, pipes, <br />restrictors, channels, retention facilities, utilities). <br />2. The implementation of these ESC plans and the construction, maintenance, <br />replacement, and upgrading of these ESC facilities is the responsibility of the <br />applicant/contractor until all construction is completed and approved and <br />vegetation/landscaping is established. <br />3. The boundaries of the clearing limits shown on this plan shall be clearly flagged in the <br />field prior to construction. During the construction period, no disturbance beyond the <br />flagged clearing limits shall be permitted. The flagging shall be maintained by the <br />applicant/contractor for the duration of construction. <br />4. The ESC facilities shown on this plan must be constructed in conjunction with all clearing <br />and grading activities, and in such a manner as to ensure that sediment and sediment <br />laden water do not enter the drainage system, roadways, or violate applicable water <br />quality standards. <br />5. The ESC facilities shown on this plan are the minimum requirements for anticipated site <br />conditions. During the construction period, these ESC facilities shall be upgraded as <br />needed for unexpected storm events and to ensure that sediment -laden water do not <br />leave the site. <br />6. The ESC facilities shall be inspected routinely and maintained by the applicant/ <br />contractor to ensure their continued functioning, especially after storm events. <br />7. The ESC facilities on inactive site shall be inspected and maintained a minimum of once <br />a month or within the 48 hours following a major storm event. <br />8. At no time shall more that one foot of sediment be allowed to accumulate within a <br />trapped catch basin. All catch basins and conveyance lines shall be cleaned prior to <br />paving. The cleaning operation shall not flush sediment -laden water into the <br />downstream system. <br />9. Stabilized construction entrances shall be installed at the beginning of construction and <br />maintained for the duration of the project. Additional measures may be required to <br />ensure that all paved areas are dept clean for the duration of the project. <br />10. The Contractor shall provide periodic street cleaning to remove debris and sediment <br />tracked off the site. <br />11. Appropriate measures shall be taken to stop sediment from entering surface water <br />bodies if the proposed BMP's fail. If BMP's fail and sediment -laden water is leaving the <br />site, immediately notify your Public Works Inspector. <br />12. Bare and/or disturbed soils shall remain uncovered and/or unstabilized for no more than <br />2 days from October 1 through April 30, and for no more than 7 days from May 1 <br />through September30. <br />13. Notify the City Public Works Inspector at least 24 hours prior to dewatering activites. <br />Handle highly turbid or otherwise contaminated de -watering water separately from <br />stormwater. <br />14. The approved project Public Works permit and SWPPP shall be retained on site or <br />readily available to the contractor throughout the duration of the construction project. <br />15. Design, install, implement, and maintain effective pollution prevention measures to <br />minimize the discharge of pollutants. <br />16. Protect all LID BMP's from sedimentation through installation and maintenance of <br />erosion and sediment control BMP's on portions of the site that drain into the LID BMPs. <br />I ( I -------___I / �-i \ I P ° °° �" - - \ \ / / /� / �/_� I\\ \\ Q ly i\\ /� Alderwood-Urban Land Complex; <br />I I- I r SD - - SD - - SD - - - SD - SD - - - . - -f _ _ _ i �. I / Hydrologic Soil Group: B <br />1'I f - _,C \ \ Tem orary Am�ndec# Ir� \ / I I g \ �s / �/ Compact Fill Area to 95% Modified Proctor RECORD DRAWING <br />II �� i� / I xistin Pon \ p <br />•-----------/-l/ I I S ils Stockpil�ATa° ,, l \ / I I I t be remove �\ \ i __ I /6� <br />0 1 __ i <br />I 1 I I ) -- - - - - � - - This Record Drawing has been prepared, in part, based on <br />=I�\ � � ` I I376-000-006-6o �I II r I r \ � _\ o / I I \ 1 r - information gathered during construction and historical <br />II Ihamrorr Bin Da -ll %/ f f r = I / \- SD (- documents. Although the information and this drawing are <br />0 �` <br />N / I 19SOI�3idAveSE I // r ( r o . I 7 / / I �- - - - - - - - - �\ i i based the best available information, no presumption <br />I J I <br />b e regarding the drawing's accuracy. <br />: I I I ( I Everett, A 982D8 I / / / ... � o / / \ � I o " w r - -p,�07 0 <br />1 I / I� I 5. Plastic Covering 1 I �/ � ( / I I I r l N I I I 0�5/013/2024 <br />0 % I I _ _ _ I I / / : , ri ' \ Vane saPena SancY�ez/ <br />=_7------- I I I I / <br />1 �,`� N v, \ � / I ( , I I I Caro/inaPena/f�R gned By Date <br />--•••��-• II - o `'\ ) � � `SI4� , i�o I ) II S13PSthCIS,F I TYLER FOSTER, P.E. <br />I I -------- 1. P��s�r�irn <br />II / g / �/ � I� _ 1 � I Everell, WA 98244 <br />1 / ( k I Natural Vkdetat+n / I / 1� -+ " I I_____ <br />0 I 1 ° - - - -----J Print Name and Title <br />I DI/�376-000-007-00 I I I I Silt Fence 7- r �� �y : � I �� - <br />/ _ <br />Au c�A apit& KaurKu/ �� . , / ° ° / r` I I " A �_ I O/u/s & 0 I <br />rr�� ,�} o II / I <br />S D - -,-1 �D _I � � 9.S033rdA ve SE l' 71 C 1 p 233 I r : ' ° I ° \ I � / Ex. IS Drainage E Bement <br />• / � i � I E Brett, WA 98208 1 I II I I I r) V � a.. I \ � , ( I I AdS09 9 th CtSE1 e Solo ra \ . <br />�� - J erAFN201308 90632 Y � 11 �r I r NQ_� # I <br />o I I r , • • 1 ( J r. \ r- I o I ) cn I - _Everett, WA 98'OI / � \ \ \ / / __ � / 1 ✓ � I h <br />Co N a � I <br />__�l <br />I <br />I I ` i \ II u�>Lr) `n �5� I I / ,� \ I I I I O 1 = ----- mob/ /- -_� \ _ \ _r ��._L 1 <br />W = �` - l / r \ \ ° I '� o I � OI0706-000-012-D -1 4 c � 1 ` SSMH-EX6 <br />Cot E ii Concrete a i\ c I <br />I I --------- L I�I I I I' ; . be remov ) a ° 1 rr �. I I Lac iie/Kim/So,00��hy� aik \ / � / / � 'Manho% <br />� I �I 1 I I '...' °1 r / I°°° I o ` II SOS9SthCtSEI -----/--- , 1 <br />I I 11 - - - II 1 I V I I o I �Gverett, WA�820I I �s _ w w--- w--- w--- w--- w--- `wc�-- w--- w--�w--- vy�-�� vyv��-fi�rr --- w--- w--- w--- w,/-- w--- w--- w--- w--- w--- w--- w--- w -- w-- w-t , - <br />4 1 011376000008D I I .. r I 14. Silt Fence \ II y.1C (.T ►J� / <br />r <br />4�9�7SonPhi&Doan Bap \ 1 �r �° \ I I I I 1�-��_---- 6 c J �� I 0 <br />\ ( \ 9SOS3rdA ve S I ( - / ° I � I = J - _- - �_ w � -t - J I i ` - <br />�' ( \ `' \ ° i� \ istin P rki & C233 -I I �- - - t 1 / 0 102 00 <br />M I I Everett, WA 98'0 I I I � \ 1 I g q w I C 1 1 010706-000-013--ADD -�-- � I 1 <br />( I 1 \ � xr i Parkin & ° ° Dave ayl \ \ O I 1 <br />I I I 1 g 7 °\ I Davro'EPetersdn � _ __ / \ ____ � _ ___ __ __ r -L <br />1 \I-_-�--------I IJ I I d . <br />` ewa / . \ I I I / \ - r------ -- - - 0 i <br />- - y \I SI0PSthC/S I /J \ r- - � I r6J� I �O i rD O I r OIL �, r ---i r � �I <br />\ � ( ) \ 1\ 1° / I O _ I I OWN O O I O OI I <br />O I `�I ��N <br />to emoved /° / \\�11 \ \ o I I = I I I O- o O - low O �c O I I O� 1 00 �� <br />IN I 1. Prelservin Everett, WA I o o I I w ��'`� I -5� I --3 -J I L`3& I I 41 ��N I ' X-4N /1 <br />r-----------1 � / °/ / °° \ / I I Natural Vegeta' on I----------� _ \ �� 1 \ I o I I O 1� � oo. I I p Q�i °� I V a I I V o. I I N oo. 1 I N `ate oao.I I 1 \ <br />\ �I I T ( \�° 4\ I °° I I n_ < / / I I 0 Q I Q I I i V I Q I O' I O I O C Q I 1 <br />1 I= I I \ / \ •• � , -- -I - ----- =--- ,T Wig- -- ---�-I I o, v I I O c Q I o Q I i o I I v Q I I I o a Q I ,�1116, <br />• I I I t I / ° E�1'/St//i� / r/ Ex/St/� �i 1\ 1 I I I \ I O 0 Q I I o C I I o C� � 1 I O O C I I o0 0� 1 o <br />1 I I I c °/ ° °\ Concre I I 1 I Na�uralVegetation I / ) �� - I Op�� h, I I cQ�� I I �ao�. I I oQ . I I o chi I I aeih�l I / I <br />I OII376-ODO-009-Od l I I , / Concretes g ° ° I A I- /OI07�6- 00-0 4-00 OI0706-000-OIS-001 ( I u L- I a�� I I I o o. I I I o�� i \- o O� I I I O a i 1 I I `o , o. I I 1 �° c °' I v- I O I <br />'-I I I c �` a b� removed °° to °be°rem ved m II I I i <br />-� P t I o �• I I r, �, 1 I ` I ��, ` I I O N I o c op �, I I O c� a, I I <br />/ ( �'orr%areay & Sophea/fin I o ° / ° ° ° a ° I ,� \ I Fransiscus FSo ian I <br />Anolstasia� Atexande�A - - 0 °o I I O ' ` e O I o I I o O O I os II SI29SthCt - - I Natural Vegetation I b O\I I O I I � Ito;\ Lt4 1 I o V �I I I o I I �° I 1 <br />I 9S073rdA ve SE I I I °/ s ; I \ I "` �1�rT��i <br />(516 SI4 9,fth CtSE <br />J c 1 I g ° I I T i I - '� I o �' � 1\ I O O �' 1 I o �' I I O I I `J I I O �o �I 1 I o n �I I l I - o <br />/ I I Everett, WA 9820 I I I r\ FvP./Pff,�_OL-E6�r61ttr - -- -- -- -- ------I------ _I <br />v rr 5.' Dus ' ontronii \° ° ° I I Ex. Boar Fen /407. 890 �_ � _ �-_ I <br />c <br />� I I L----------i111 I I :� <br />I y I I 45' 41 "A I C 101 x.�oardFen / ( I I <br />1 � / \ \ /I I I , t r 1 1 /12. Materials \ ° a ° ss I - - - 2 2 - ' I P <br />° ° __ <br />( I L ': \ r on Hand C140 C� 33 \ - I - I - °`� <br />°� ,' I �� i <br />S ---SD- �--- SD-� <br />i--------�-�I I I C233 �- - I wP 1 <br />• r0 0< (Silt ence = 11 NP i I o <br />l� I I / ( I � � a . i 9. Concrete �O N C P Fence Preservin Q I - , <br />/� ° /r � o I--------------1 <br />\ II I \ y C151 Silt Fence g <br />/ \ I I \ I OII37 \40-O�C�00 I \ y Handling s ° 0 I v) <br />�° \ ,r g °\ ° s � P� N tural Vegetatio 1 I I II I I 0 / -II-- _ <br />\ / \ ° \ \ ° s i C233 1 <br />I ` VanKimhoe,& n �n I '\ ° / Discha rom c st n area, q I 1 <br />I ( I IE g 9 _ s N u l e io 1 Ol � 1 Il 11. Preserving I I I 11 I/ <br />\ \ I 950�3rq'Av SE I' I \ \ ,� �I ° s a\ sediment ra shall be monitored / 4. Silt Fence - 1 Natural Vegetation 1 I 1 ° <br />I Ever , WA 208 I Potential location of Existing \ �\ \i \ � ^ for pH pri eleasing to buffer, Cl 1 I I 280SI8-003-042-00 I I_. 10 00 0 1 <br />r I I '\ / \ ° Existing Church w \ ° C24 s -- / B f e / I I <br />wetland, sociated stream. / 0 I� I SSMHC17b <br />= J I I I Rockery Wall Drain (typ) \ Temporary Amended '� \ (to be removed) i ° \ 9 �� +, \ I VerizonNorthwestInc I 1 „ <br />1i <br />° ° <br />/ I_------ � �I� J- / ,r \�• r; _�, 3/4.Temporary I _ / _ I I 9SO47thAveSE I q . /1 D_ Manho% <br />/ { J l \ - - \ Soils Stockpile Area '� \ \ \ <br />I / \� /� % Sediment nd C6 <br />1� \ � (�r� I Everett, WA 98208 I � ' / I o <br />\ \ r � ��� . Ex/sl/ng� e � o � ``' � 'J Discharge from ns ion area I I � I I <br />\ • (� / - � _� �-. - � .. ) istingkckery ° ,� / <br />\ / I � - � � � \ ° - \ s Service , / g I I (�' 1 I �- <br />to be r m e 1. e o e p r I 1 <br />• , \ I i I \ \ sediment trap sha onitored S I I � , 1 <br />X I I \ \ I = ice\ / / ss 4/13. •It en \ . for pH pnor to e in to buffer, _ ���-------- / I 1 ' ,� <br />- ,S I I \ <br />I I ( r I I I ' ' \ \ 526� � J / / �O \ /tin Wate�ne \ ° 4 etlgnd, and ss�ci�ted stream. o o , 5Nb r I , o I A I <br />I I I I \ b / t be removed � �\• . _ � 00 � y1 � � � ' 1 I I <br />\ I ( I \ ,52 Ex/st/ngCon�iete /k ( ) �. W r P i Ee _ Asa 7. Storm r in I I '� I I <br />• al I 0 137610 I I \ 5. Plastic (to be removed)/ 11 �� \ � - gyp- - sp _ _ s- _ - - _ - - - - - _ g Ex. IS'Sew rEaser�zerrf Inlet Prot n I I 1 I i \ �\ a e e u l e y A xistin � I 1 <br />V. I �i \ g �.� \ w - - - - - �w - \ - _ _ _ _ sD - sD _ _ - _ - - SD - - C233 meat o el N81 S-12S009 gs ' Z; I � o <br />J I Covering \ / i I - w, - - _ - - w w - - w \ - - - - - - - _ _ _ _ I 1 I I I <br />�r, <br />g p 1. Preservin 1 ` <br />l!��in�known \ \ y I - - w - - w - - - w - r - w - - - - - - _ _ _ - _ - hlaurr LVegetr�tiori A I <br />� I Everett ` °- -I - \ - - - - - w - - - - - - w - - 220 1 I <br />II \ \ I 1 <br />• X I I \ \ \° �° �sfingLOW' � � .... - - - - - - - - ss - ss -- --- s -- -- -- ss - --- r - s s - - ss - I I SSMH--EX. 1 <br />\ r- 0 o ((I \ ,` �\ � a, (to be rembve r - :. a I �v) I A �8"Manho% <br />/ LO o � \ °� f O Existing ChurchAccess _€xis Pavement- Buffer A"dition - - - -11I I I I <br />CT 1 / LO III S. . _ \ � a, \ v, w \ \ - - width varies ExistingSewerUne SSMH-Ex. 2 �, I I I 1 <br />3 0 1 I vl � _/ \ � � �s I `Jo \ - _ - _ - Access - - o per Mit,�gation Plan 48"Manho% IR I I ; I I 1 <br />__� a a_ _�� �_a_���_�_ ��a_a=�_ - - - EX/st/n Liht asp-�=a tea_ _ _ _ <br />4. Silt Fence � -_ _ _ a_ t - - - o I � Temporary <br />I \ / - G� - - G - - G EX 10 Uti/' Ease - - -�-� �-�- �- �_ a N. 4- G - � -,_ ar, � xistin Lf ht V - - - - - - - F 1 I <br />0 1 1 ° p I y <br />I- \ - _ 1 _ _ - 5 \ Ex. BoardFe e - - g r I60I ° an I - i - ,- o I <br />o I 1 -- II 4: i t e e \ ( tin I�diant/ yTT i o � f�-�� I _ �Construction <br />0 --- J((II-�C233 22-- - /\ \ - -(#obe lo�a 4--� _ __ en A 001020046 1 Ic <br />� 1 P ti - J - - - C233 ----- _ - - --- - - p° - - 1 I \ I 0 Entrance <br />- I I / Ifl� 52p-_----_ --- --_- --__ ---- -iii We \ 1 I --- --- - - - _�----_�-_�- -_-__ - - _ _ I N �I =F�l <br />1 i�--w---w--- rstingHdrant - S18 ---- ----- ----- �0 -- - 1036 P--'��:��-�R.S� - -- - - - - - ---- I I /1 I ��I <br />__ _ C233 <br />----___-_ -- � Ng 5� - �� - - oHP•---o�P-=�� -� -� - -� -� - -� -N -•�� -� �-s� -� - - - - - - - 8° 53' 41 "W 1 6 - - - - - - - - - - - = - _ - OH - - I- ° I ,I I 1 OH O P OHP OHP -p <br />C sa I 1 1.Preserving - - c e - -� -e _-� - -N-m i44 cW � 10 / / -- -- _- __ - ---- - --- - ° = P---X _ +�LP <br />I 1 Natural Vegetation - - 1 -� 6mai i -� -� -� -.� -.� - ° - - HPI - P _ <br />o 1 1 - - tiY = _ - - = Tem ora Construction Entrance. Existin As halt < r Zlsl/ng oncre% \ _ _ 0- e ' , I ' o <br />\ i -1 re�ervi n Temporary g p I '� � w Power Vau// _ _ �pt�x' Cente�ne o/U/i%ty C 101 I I �1 P <br />1 I I g - / Ex. Vertica/Curb ° ° <br />J 0 1 / Existin H Brant road may be maintained through bulk grading of C105 1 Natural e et t'or1 1 Easement e .4�FtV200312020979 =° IT I ^ I 1 oyP <br />sa ( g y Natural Vegetation g I % P I° I , I^ <br />I site. Majority of site grading occurs within bulk of site. � �, -� -1 %1' Preserving I I I I <br />_ onstruction <br />N - w - -- w - -- w - -- w - -- w -- /w - -- w - -- w - -- w--- w-J- w--- w--- w--- w--- w- -_ 280518003- 40-00 <br />_ � \ I I •• • � 1 A .Stabilized <br />D �I I /1 - w-� w--- w--- w--- w-- 1 � � I� � / �-�cess&Uti/itiesEasement Natural I 11� <br />� _ 2805�8-003-04I-00 - w - �80,fJ&09, Q�& 011- w II l % I perAFN870824032d Vegetation I �' I <br />Sq - T / i Tagel7--0337 \ I GreentreePlazaIBLLC � Stabilised Cori�sfluc olwi 1 h�N. r r N A'ineProperties,Inc J r I 1 I I E trance/Exit <br />SOSSEEverellMa//Wa Entrance/Exit 1 \ '' i % /60 xrw/Power Vau/t h�i I I I I° <br />y �a vo 07SEEverettMa//Way i 9 �j, <br />Q I i- r 40SSEEver�ttMa//Way I Everett, WA 98208 3 1 h L- Everett, WA 98208 ,/ Ex. Dempster I I o I Al 11 <br />Everett, W 98208 r Enc%sure \ I I <br />I <br />--------------- i ' - - I Cr220 ' Al I <br />/------------ r / I <br />1-1 <br />---------------- I ,�) <br />v I i I \ I�-�/_---- � I -- <br />aD I ( I / <br />- SD; - SD - - SD - - SD I -� O <br />o i' I \ I I / I\ A II 11 V o o I--------- --------------------- / <br />I / I 11 I 1 � r----------,------- 7. Storm ldin 0 <br />i I 1 I I ✓ \ I I I , I I o I o I I / <br />1 I ( I I / I I � 1 �( I I I I I I � 1 Inlet Prot ctaon 1 1 <br />Q I �r I i / I �/� \ ; 1 I� / 1 I I I I 99 ; 00 I <br />o N v I I ��� ---. I I I I 0 1 I \ 1 1 I p <br />AS -BUILT CLEARING & TESC PLAN <br />NOTE: The project site is tributary to a 303d impaired 0 40 80 <br />water body. Discharges from the project site require <br />E pH monitoring in accordance with the guidelines set Scale: 1 "-40' <br />: UNDERGROUND UTILITY NOTE by Ecology. Line Table <br />(D Underground utility locations shown hereon are based <br />CT <br />a / ® upon surface indicators. No underground location Line # Length Direction <br />Y service was utilized for their location. The use of this <br />Z_ map for their exact location is not warranted. Prior to Ll 50.52 S00o 18' 08"W <br />0 construction user should call the utility location service <br />° at 1-800-424-5555 48 hours before construction. <br />UJ <br />Z Co <br />N <br />D4`N <br />a) Q o. <br />' > I <br />Q >, LO <br />0 O "O <br />Z -I.-CD <br />CD <br />�__ � MO <br />N •" <br />00 Q <br />00 <br />i as <br />I <br />N <br />0 <br />N <br />01 <br />01 <br />Q <br />0 <br />U <br />0 <br />M <br />i <br />V 53726 �� <br />=GISTERE1 ��� <br />S'�ON A� ��G <br />0�5/0-3/2024 <br />N <br />O <br />O <br />n` <br />I I I I <br />, Q w <br />L Q <br />.. �� � Q J - <br />C\ LLJ <br />� <br />J o° � O 0 o O <br />I o° ~ w z � <br />,U � z U CL O CL <br />U Q Q � <br />co <br />0 LU �CLwQ=� V) <br />1Z U C) Q cn w Q <br />i <br />il <br />F_ <br />Cl) <br />w <br />L0 <br />0 <br />w <br />z <br />00 Q <br />V) 0 M <br />� 00 <br />o, = <br />Q O <br />I z <br />} <br />N a- <br />u w = <br />w uCl) <br />V) z <br />V) > O <br />Q . <br />00 <br />T <br />U 0 <br />o <br />U <br />w <br />Cl) <br />LL <br />0 <br />0 <br />M <br />U <br />Q <br />N <br />U00 <br />I Q <br />1 <br />= N <br />I� O <br />co <br />0 6 <br />0 <br />0 <br />1 <br />3 <br />} <br />0:� N <br />U ' <br />w <br />N <br />Um <br />IL� <br />Z <br />Q <br />IL <br />U <br />LU <br />W <br />V <br />Z <br />0:� <br />Q <br />LU <br />U <br />I <br />m <br />V) <br />Q <br />SHEET <br />C4 of C27 <br />24x36 <br />REV1122-047 <br />P W 2303-015 <br />