Laserfiche WebLink
PE E P <br />SECTION 13, TOWNSHIP 28N, RANGE 4E, W.M. <br />PERMANENT SEEDING <br />" \\ PERMANENT COVER BMP (HYDROSEEDING GENERAL NOTES) <br />�x 1. CONSTRUCTION ACCEPTANCE: WILL BE SUBJECT TO A <br />i It \ WELL ESTABLISHED GROUND COVER THAT FULFILLS THE <br />i� REQUIREMENT OF THE APPROVED CONSTRUCTION PLANS. <br />S <br />2. ALL DISTURBED AREAS SUCH AS DETENTION FACILITIES, <br />`'6ROADWAY BACK -SLOPES, ETC. SHALL BE SEEDED WITH A <br />I J' PERENNIAL GROUND COVER GRASS TO MINIMIZE EROSION. <br />/ GRASS SEEDING WILL BE DONE USING AN APPROVED <br />HYDROSEEDER OR AS OTHERWISE APPROVED BY THE CITY <br />OF EVERETT. <br />3. PREPARATION OF SURFACE: ALL AREAS TO BE <br />�\ SEEDED SHALL BE CULTIVATED TO THE SATISFACTION OF <br />_ THE CITY INSPECTOR. THIS MAY BE ACCOMPLISHED BY <br />i x2 j DISCING, RAKING, HARROWING OR OTHER ACCEPTABLE <br />?a" MEANS. <br />t S 4. IMMEDIATELY FOLLOWING FINISH GRADING, PERMANENT <br />1 DO•� \ VEGETATION (CONSISTING OF RAPID, PERSISTENT AND <br />( 1 LEGUME) WILL BE APPPLIED. (MINIMUM 80# PER ACRE). <br />INSTALL SILT FENCE THIS IS TO INCLUDE THE FOLLOWING: 20% ANNUAL, <br />1 COE STD. DET. 214 PERENNIAL OR HYBRID RYE GRASS, 40% CREEPING RED <br />BMP C233 FESCUE, 40% WHITE CLOVER. HYDROSEED REQUIRED. <br />t <br />PROTECT BIORETENTION AREAS 5. FERTILIZER: SHALL BE APPLIED AT 400# PER ACRE <br />FROM COMPACTION USING OF 10-20-20 (10 LB. PER 1,100 SQUARE FEET) OR <br />HIGH VISIBILITY FENCE (TYP.) <br />EQUIVALENT. <br />so' (BMP C103) <br />28' <br />CONSTRUCTION SEQUENCE <br />� � 1 <br />1. PRIOR TO ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR <br />SHALL SCHEDULE AND ATTEND A PRE -CONSTRUCTION <br />CONFERENCE WITH THE CITY OF EVERETT INSPECTOR. (SEE <br />�6Y Lid. Jc��+:..,:.%as°.74 PERMIT FOR INSPECTION SCHEDULING INSTRUCTIONS.) <br />{ <br />3 � \ t1 ?7* / off 57a76(NW PVC) ) 2. INSTALL ORANGE PLASTIC CLEARING LIMIT FENCING AS <br />J `a4 J / E=575.44(SFa;nucINDICATED. <br />FOUND 141NON <br />20 x i s � PIPE DOWN 0.13' 3. INSTALL ALL SILT FENCE AND INLET PROTECTION. <br />WSI?ED 11--2-2021 <br />4. CLEAR FOR AND CONSTRUCT THE TEMPORARY CONSTRUCTION <br />1e" 1 _r ( /` -: �� ACCESS. <br />a1" _ <br />CLEARING LIMITS 1r 'N I 15' ESM'T / <br />I ! ~� i 5. REMOVE EXISTING STRUCTURES, CLEAR, GRUB, AND GRADE FOR <br />MARK W/ORANGE i G I TO MWWD / <br />AF#202110060383 & / SsMH=584.?s UTILITY CORRIDORS. <br />FLAGGING (53.661 SF) -588--. ( V 1 / 1E=571.45(W8-PVC) <br />TING PERIMETER VEGETATION AND ADD BMP C103 ' 20220303157 <br />f1 1 �so' -~ p. /a / tE=S71.33!WE8° Vc� 6. MAINTAIN EXIS <br />ADDITIONAL ROW OF SILT FENCING WHERE NECESSARY. <br />7. CONSTRUCT UTILITIES, AND CURB AND GUTTER PER APPROVED <br />X J/ 27/ ) / / / s / / DESIGN PLANS. <br />t L / <br />2.6'-- �� r �+ l' c f // i / 8. APPLY MULCH TO UNCOVERED AREAS IN ACCORDANCE WITH <br />THE MULCH DETAIL THIS SHEET. <br />STOCKPJL.E 9. EXCAVATE TO SUBGRADE OF PERMEABLE ASPHALT SECTION <br />IfR ' / r ccCC�� NO; E / / O� / ' / AND INSTALL PERMEABLE ASPHALT PER NOTE ON SHEET 3 OF <br />f r`t�ADi.T 1 y ..-' BMP 0220 A m"x / -k 6. <br />tj <br />OPSOIL <br />1 �f ATE NOTE ft f / r � �� % / ,p 60, PROTECT PERMEABLE ASPHALT. <br />' 10. INSTALL SILT FENCE AT BACK OF CURB ALONG FRONTAGE TO <br />I 1 / ' % <br />l <br />11. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS <br />„ ` r MUST BE STABILIZED IN ACCORDANCE WITH THESE PLANS AND <br />i 22 xz - ® /� f ✓ / APPLICABLE BMP'S REMOVED. <br />A <br />W W <br />�- X X-- -�- <br />20' WATER EASEMENT CONST. ENS 1 <br />AND VACATED 961H STREET SW L^- COE 1L" <br />AFN 9603070450 D.I; WATER MAIN -COE STD. DET. 201'ti, <br />: f BMP C105 <br />EX CB- 71 5¢3 74 _... <br />1F=56t.s0(s?2 ccNcj � ,� <br />EX: CD-ir=563.14 �s ! y <br />iE=560.06(NE127Di) <br />:E=58G.24(SW72 Dt) . s <br />/ 0 <br />/ <br />GRADING QUANTITIES: <br />CUT = 1,000 C.Y. <br />FILL = 1,200 C.Y. <br />GRADING QUANTITIES CALCULATED <br />USING AUTOCAD GRID SUBTRACTION <br />METHOD COMPARING EXISTING GRADE <br />TO FINISHED GRADE. <br />TOPSOIL/STOCKPILE NOTE: <br />PILES ARE TO BE COVERED W/ PLASTIC <br />SHEETING WITHIN 24 HOURS. <br />CONTRACTOR TO INSTALL SILT FENCING <br />WHERE NECESSARY ALONG PERIMETER IF <br />VEGETATIVE BUFFER DOES NOT PROVIDE <br />ADEQUATE PROTECTION. <br />/y //.,,• .,. EX. <br />FH <br />LEGEND <br />CLEARING LIMITS <br />X SILT FENCE <br />O INLET PROTECTION <br />® CONSTRUCTION ENTRANCE <br />TREE TO BE REMOVED <br />EX, <br />/ FH <br />EX. CB- T?=5617? <br />CB INLET <br />PROTECTION <br />COE STD. DET. 210 <br />BMP C123 (TYP.) <br />=5st ?6jW6 �Vcl <br />E=�au.93(sWr2 r��) <br />N <br />"" 60 I <br />HORIZONTAL SCALE <br />• <br />• o <br />Know what's below. <br />Call two business <br />days before you dig. <br />MULCH <br />PER CITY OF EVERETT STORM WATER <br />MANUAL 2-2.2 BMP E1.15 <br />PER SWMMWW <br />BMP C121 <br />EROSION & SEDIMENTATION CONTROL NOTES <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT <br />CONS 777UTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E..C.. SIZE <br />AND LOCA770N OF ROADS, PIPES, RES7RICTORS, CHANNELS RETENTION FACILITIES, <br />UTILITIES). <br />2. THE IMPLEMENM77ON OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, <br />REPLACEMENT, AND UPGRADING OF THESE ESC FACIL177ES IS THE RESPONSIBIUTY OF <br />THE APPLICANT/CONTRACTOR UNTIL ALL CONS77?UC77ON IS COMPLETED AND <br />APPROVED, AND VEGEM7701VAAIVDSCAPING IS ESTABLISHED. <br />J. THE BOUNDARIES OF 7HE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE <br />CLEARLY FLAGGED IN THE FIELD PRIOR TO CONS7RUC77ON. DURING THE <br />COVSTRUC77ON PERIOD, NO D157URBANCE BEYOND 7HE FLAGGED CLEARING LIM17S <br />SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE <br />APPLICANT/CONTRACTOR FOR THE DURA77ON OF CONSTRU077ON. <br />4. THE ESC FACIL177ES SHOWN ON THIS PLAN MUST BE CONSTRUCTED 1N CON✓UNC77ON <br />WITH ALL CLEARING AND GRADING AC771477ES, AND IN SUCH A MANNER AS TO <br />ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER 7HE DRAINAGE <br />SYS7EM, ROADWAYS, OR 140LAIF APPLICABLE WATER QUALITY STANDARDS <br />5 THE ESC FACIL177ES SHOWN ON 7HIS PLAN ARE THE MINIMUM REQUIREMENTS FOR <br />AIV77CIPA7ED SITE CONDITIONS. DURING THE COV57RUC77ON PERIOD, THESE ESC <br />FACIL177ES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND <br />TO ENSURE THAT SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE <br />6. THE ESC FACIL177ES SHALL BE INSPECTED ROU77NELY AND MAINTAINED BY THE <br />APPLICANT/CONTRACTOR TO ENSURE 7HEIR CON77NUED FUNCTIONING, ESPECIALLY <br />AFTER STORM EVENTS <br />7. 77-IE ESC FACIL177ES ON INA077VE S17ES SHALL BE INSPECTED AND MAINTAINED A <br />MINIMUM OF ONCE A MONTH OR WI7H11V THE 48 HOURS FOLLOWING A MAJOR STORM <br />EVENT. <br />8. AT NO 77ME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO <br />ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND <br />CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERA770VV <br />SHALL NOT FLUSH SEDIMENT LADEN WA7ER INTO THE DOWNS7REAM SY37EM <br />9. STABILIZED CON57RUC7701V ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF <br />CONS7RUC770N AND MAINTAINED FOR THE DURA7701V OF 7HE PROJECT. ADD177ONAL <br />MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN <br />FOR THE DURATION OF THE PROJECT. <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC S7REET CLEANING TO REMOVE DEBRIS <br />AND SEDIMENT 7RACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING <br />SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL. IF SUPS FAIL AND <br />SEDIMENT -LADEN WATER IS LEAVING THE SITE, 1MMEDIA7ELY NO77FY YOUR PUBLIC <br />WORKS INSPECTOR. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED <br />FOR NO MORE THAN 2 DAYS FROM OCTOBER I THROUGH APRIL 30, AND FOR NO <br />MORE 7HAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br />13. N077FY THE CITY PUBLIC WORKS INSPECTOR AT LEAST 24 HOURS PRIOR TO <br />DEWA7ERING AC771477ES. HANDLE HIGHLY TURBID OR 07HERWISE CONTAMINATED <br />DEWA lER1NG WA TER SEPARATEL Y FROM STORMWATER. <br />14. THE APPROVED PROJECT PUBLIC WORKS PERMIT AND SWPPP SHALL 8E RETAINED ON <br />S17E OR READILY AVAILABLE TO THE CONTRACTOR THROUGHOUT THE DURA77ON OF <br />THE COIVSTRUC77ON PROJECT. <br />15. DESIGN, INSTALL, IMPLEMENT, AND MAINTAIN EFFE077VE POLLU7701V PREVEN770N <br />MEASURES TO MINIMIZE THE DISCHARGE OF POLLUTANTS <br />16. PROTECT ALL LID BMPS FROM SEDIMENTATION THROUGH INSTALLATION AND <br />MAINTENANCE OF EROSION AND SEDIMENT CONTROL BMPS ON POR7I01VS OF THE <br />SITE THAT DRAIN INTO THE LID BMPS. <br />APPLICATION RATES AND QUALITY STANDARDS FOR MULCH MATERIALS <br />MULCH MATERIALS QUALITY PRODUCTS APPLICATION RATES <br />STRAW <br />AIR-DRIED; FREE FROM UNDESIRABLE <br />2"-3" THICK; <br />SEED AND COARSE MATERIAL <br />5 BALES PER 1000 SF <br />OR 2-3 TONS PER ACRE <br />WOOD FIBER CELLULOSE <br />NO GROWTH INHIBITING FACTORS <br />APPROX. 35-45 LBS <br />PER 1000 SF, OR <br />1500-2000 LBS PER ACRE <br />COMPOST <br />NO VISIBLE WATER OR DUST DURING <br />2" THICK, MIN.; (APPROX. 100 <br />HANDLING. MUST BE PURCHASED <br />TONS PER ACRE APPROX. 750 <br />FROM SUPPLIER WITH SOLID WASTE <br />LBS PER CUBIC YARD) <br />HANDLING PERMIT <br />-71 <br />C <br />Qcov- <br />rn <br />�rn ON <br />Lo <br />C'4 N <br />w W r <br />w <br />o W <br />N <br />Z <br />a <br />U <br />M <br />z <br />�� <br />O <br />Q <br />'�^ <br />I <br />v) <br />r <br />C <br />w <br />IN <br />W <br />F <br />0 <br />WN <br />W�Q <br />APPLICATION: MULCH MAY BE APPLIED: ON <br />LL <br />Uj <br />DISTURBED SURFACES THAT WILL REMAIN <br />W <br />> <br />W <br />LL <br />O <br />2 <br />UNWORKED FOR MORE THAN 7 DAYS (2 DAYS IN <br />W <br />W <br />THE WET SEASON). ON DISTURBED AREAS THAT <br />n <br />�y <br />p <br />NEED COVER MEASURES FOR LESS THAN 30 DAYS. <br />LJ... <br />O <br />Z <br />AS A COVER FOR SEED DURING THE WET SEASON <br />00 <br />04 <br />AND DURING THE HOT SUMMER MONTHS. DURING <br />I_ <br />a <br />THE WET SEASON, ON DISTURBED SLOPES <br />U <br />STEEPER THAN 3H:1V WITH MORE THAN 10 FEET <br />OF VERTICAL RELIEF. <br />MAINTENANCE: MULCH MUST BE INSPECTED <br />REGULARLY AND MORE MULCH ADDED AS <br />PR01 NO <br />22-0104 <br />DSN BY <br />EJT <br />NEEDED TO MAINTAIN THE SUGGESTED <br />APPLICATION RATE. ALL RIPS OR TEARS IN <br />DATE: <br />PLASTIC SHEETING SHALL BE REPAIRED. <br />SHEETING SHALL BE CHECKED TO ENSURE IT IS <br />8/11/2022 <br />PROPERLY OVERLAPPED AND WEIGHTED IN <br />PLACE; SHEETING SHALL BE RE -LAPPED AND <br />GAS. <br />1" = 30' <br />WEIGHTS REPLACED AS NEEDED. <br />DRAWINGNO. <br />2 <br />9 <br />PFN: <br />G <br />