Laserfiche WebLink
� � s <br />SECTION 13, TOWNSHIP 28N, RANGE 4E, W. M . <br />GENERAL ROAD & STORM DRAINAGE NOTES: <br />1. ALL WORK AND MATERIALS SHALL CONFORM TO CITY OF EVERETT STANDARDS (JANUARY 2020) AND/OR WSDOT/APWA STANDARD <br />SPECIFICATIONS AS APPLICABLE. <br />2. THE CONTRACTOR SHALL NOTIFY JOSEPH SMEBY PE., THE OWNER AND THE INSPECTOR WHEN CONFLICTS BETWEEN THE PLANS AND <br />EXISTING FIELD CONDITIONS OCCUR, AND SAID CONFLICTS SHALL BE RESOLVED PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />3. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED OR PUT INTO USE UNTIL IT HAS BEEN TESTED, INSPECTED AND <br />ACCEPTED BY THE CITY. <br />4. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN FOR <br />CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY <br />ADDITIONAL UTILITIES NOT IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE <br />PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF <br />"RELATED CONSTRUCTION ON THE PROJECT. <br />5. ALL STORM DRAIN WORK MUST BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. <br />6. ALL CB'S SHALL BE TYPE 1 OR TYPE 1L PER STD. DWG. #402 & #403 UNLESS OTHERWISE SHOWN. <br />7. ALL STORM DRAIN PIPE SHALL BE CORRUGATED HIGH DENSITY POLYETHYLENE PIPE WITH SMOOTH WALL INTERIOR UNLESS OTHERWISE <br />NOTED. <br />8. ALL EXPOSED GROUND MUST BE RE -SEEDED WITHIN 30 DAYS OF THE COMPLETION OF CONSTRUCTION. IF RE -SEEDING IS NOT <br />PRACTICAL DUE TO THE WEATHER OR SEASONAL PROBLEMS, THE GROUND MUST BE COVERED WITH MULCH AS DIRECTED BY THE CITY <br />ENGINEER. <br />9. CITY STREETS ARE TO BE KEPT CLEAR OF DIRT AND DEBRIS AT ALL TIMES DURING CONSTRUCTION. DUST SUPPRESSION AND STREET <br />CLEANING MUST OCCUR AS DIRECTED BY THE PUBLIC WORKS INSPECTOR. <br />10. PARKING IS ALLOWED ONLY IN DESIGNATED PARKING AREAS. <br />11. IF ENCOUNTERED, ANY EXISTING ON -SITE SEWAGE SYSTEMS MUST BE ABANDONED AND FILLED IN ACCORDANCE WITH SNOHOMISH <br />HEALTH DISTRICT STANDARDS. <br />12. PAVEMENT PATCHING SHALL CONFORM TO STD DWG #326. <br />STORM DRAINAGE NOTES: <br />1. NO PART OF THE <br />DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE UNTIL IT HAS BEEN <br />INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT. <br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND CONSTRUCTION STANDARDS <br />AND SPECIFICATIONS AND THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL <br />CONSTRUCTION (CURRENT EDITION). <br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND ARE <br />SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND <br />TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING <br />CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED <br />SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE <br />PROJECT. <br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE STAKED BY SURVEY FOR <br />LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. <br />5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE, DRAINS TO STREAM, LAKE, <br />RIVER, PUGET SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE FOR THE PROJECT <br />6. SHALL COMPLY WITH THE EVERETT MUNICIPAL CODE (EMC), CITY ADOPTED STORMWATER MANAGEMENT <br />MANUAL, POLICIES AND CRITERIA SET FORTH IN THE CITY OF EVERETT'S DESIGN AND CONSTRUCTION <br />STANDARDS & SPECIFICATIONS. <br />�-:PERMEABLE CONCRETE <br />(5"MIN) WEARING COURSE ISEE NOTES LAND: 61. <br />o"o-�a o o aeaeo6000 0 og000 a <br />6„ <br />p n a a o 0 o a o o b a <br />o a°a9000�oo-°�ao-P°000�Q0000a°oa <br />�o- ono -a o a a.o LEVEUNG COURSE.OPTIONAL <br />o-o-n m,A �. o nanoo . <br />u o o Y <br />O y0uo�'ouo. 4 0 q o P o oPp o. <br />(SEE NOTE `A: <br />S <br />/.RESERVOIR COURSE -6"MIN PERMEABLE t,�x <br />BALLAST <br />6NON-WOVEN,GEOTEXTILE:(IF REQUIRED) <br />(SEE NOTE 5) <br />6RUNOFF TREATMENT LAYER'.. X (SEE NOTE 7) <br />NATIVE SUBGRADE (SEE NOTE 8) <br />TREATMENT LAYER NOTES: <br />1. PROJECT GEOTECH TO TEST EXISTING SOIL UNDERLYING PERMEABLE PAVEMENT <br />TO SEE IF IT MEETS THE DOE STANDARDS FOR TREATMENT: <br />-CATION EXCHANGE CAPACITY >= 5 MILLIEQUIVALENTS / 1009 DRY SOIL <br />(ORGANIC CONTENT (ASTM D 2974)) <br />2. IF SOIL DOES NOT MEET TREATMENT STANDARDS, EXISTING SOIL UNDERLYING <br />PERMEABLE PAVEMENT IS TO BE AMENDED TO MEET THE DOE STANDARDS FOR <br />TREATMENT (SEE ABOVE). <br />3. AMENDED SOIL TO BE INSPECTED BY PROJECT GEOTECH AND APPROVED PRIOR <br />TOBACKFILL. CITY INSPECTOR TO OBSERVE AND VERIFY GEOTECH ACCEPTANCE <br />PRIOR TO BACKFILL. <br />NOTE: PERMEABLE PAVEMENT <br />SHALL BE CONSTRUCTED IN <br />ACCORDANCE WITH CITY DCSS <br />SECTION 4-4.3(5) <br />EXISTING GROUND <br />\ DO\,LC <br />A o <br />O <br />°o. <br />°o. <br />o°o;< <br />t30" ° <br />O . o 04 <br />°o. <br />o.° <br />0. <br />o� <br />MIL VISQUEEN CURTAIN <br />L LENGTH OF TRENCH <br />2' WIDE <br />TRENCH <br />. j" WASHED ROCK <br />4" SMOOTH WALLED PERF. <br />PVC PIPE. OUTFALL TO YARD DRAIN <br />CURTAIN DRAIN INSTALLATION DETAIL <br />NOT TO SCALE <br />CURTAIN DRAIN NOTE; <br />THE BOTTOMS OF CURTAIN (CUTOFF) DRAINS SHALL <br />EXTEND AT LEAST 6 INCHES INTO THE DENSE GLACIAL TILL <br />LAYER AND SHALL BE PLACED AT A DEPTH SUITABLE TO <br />INTERCEPT LATERAL FLOW. THE GEOTECHNICAL ENGINEER <br />SHALL BE ONSITE TO VERIFY THE PLACEMENT AND DEPTH <br />OF THE CURTAIN DRAINS DURING CONSTRUCTION. <br />NOTES <br />1, PERMEABLE PAVEM <br />ENT WITHIN CITY RIGHT -Or -WAY <br />.REQUIRES APPROVAL BY THE CITY ENGINEER WHEN PLACED <br />BENEATH ATRAVELED WAY. THESE GUIDEUNES PROVIDE <br />MINIMUM DEPTH FOR THE. HYDROLOGIC PERFORMANCE OF <br />THE PERMEABLE PAVEMENT. THE STRUCTURAL CAPACITY OF <br />PAVEMENT SECTIONS, WHEN SUBJECTTO-VEHICULAR LOADS <br />DEPENDS ON SEVERAL FACTORS AND MUST BE DESIGNED BY <br />A LICENSED PROFESSIONAL: ENGINEER. <br />2. LONGITUDINAL SLOPE, DTO5% MAX. FOR PERMEABLE <br />ASPHALT BY. MAX FOR PERMEABLE CONCRETE. <br />3: USE CHECK DAM OR OTHER METHODS TO MAXIMIZE <br />PONDINGINTHE SUBSURFACE FOR LONGITUONALSLOPES <br />"EXCEEDING 2%. SEE STANDARD DRAWING 431. <br />C LEVELING COURSE MATERIALS: 1.5 `TO U.S, NO. 8. <br />-UNIFORMLY GRADED, CRUSHED (ANGULAR), THOROUGHLY <br />WASHED STONE. <br />5, GEOTEXTILE-SHALL BE PROMUED BETWEEN RUNOFF <br />TREATMENT LAYER OR NATIVE SOIL AND PERMEABLE <br />BALLAST WHEN RECOMMENDED BY GEOTECHNICAL <br />PROFESSIONAL OR PAVEMENT DESIGNER. GEQTEXTILE SHALL <br />BE PROVIDED. WHEN FINES IN NATIVE SUBGRADE EXCEED 7% <br />ONJTHE 0200 SIEVE. GEOTEXTILESHALL BE PLACED BETWEEN <br />PERMEABLE. BALLAST AND TREATMENT LAYER IF A <br />TREATMENT LAYER IS USED. GEOTIXTILESHALL BE <br />GEOTEXTILE FOR SEPARATION PER WSDOT/APWA. <br />STANDARD SPECIFICATION.9-33.2, NONWOVEN, TABLE 3. <br />6. PERMEABLE -CONCRETE: MUST BE INSTALLED. BY A CERTIFIED <br />PERMEABLE CONCRETE INSTALLER PERMEABLE ASPHALT <br />MUST BE INSTALLED BY AN EXPERIENCED PERMEABLE <br />ASPHALT INSTALLER. ... <br />7. RUNOFF TREATMENT LAYER SHALL BE REQUIRED FOR <br />PAVEMENT WHICH IS SUBJECT TO VEHICULAR TRAFFIC OR <br />OTHER POLLUTANTS WHERE NATIVE SOILS DO NOT MEET <br />THE REQUIREMENTS FOR TREATMENT. SEE THE <br />STORMWATER MANAGEMENT MANUAL <br />81 SUBGRADE SHALL BE COMPACTED TO A FIRM AND UN- <br />YIELDING CONDITION INACCORDANCE WITH THE PROJECT <br />PAVEMENT DESIGN. DO NOT OVER COMPACT SUBGRADE <br />HEAVY TRUCK AND CONSTRUCTION EQUIPMENT SHALL BE <br />PROHIBITED FROM DRIVING ON THE SUBGRADE THROUGH <br />OUT CONSTRUCTION. <br />CITY OF EVERETT <br />PUBLIC WORKS DEPARTMENT <br />PERMEABLE ASPHALT OR E"" <br />NCRETE PAVEMENT SEGTIONI 430 <br />OPTION: STOCKPILE EXISTING TOPSOIL <br />STOCKPILE EXISTING TOPSOIL DURING GRADING, STOCKPILE AND COVER SOIL <br />WITH WEED BARRIER MATERIAL THAT SHEDS MOISTURE YET ALLOWS AIR <br />TRANSMISSION, IN APPROVED LOCATION, PRIOR TO GRADING. REPLACE <br />STOCKPILED TOPSOIL PRIOR TO PLANTING. STOCKPILED TOPSOIL SHALL BE ' <br />TESTED AND AMENDED IF NEEDED TO MEET THE ORGANIC MATTER OR 3"4"(SETiLED)ARBORIST % <br />E OR / GRASS SEED OR SOD <br />DEPTH REQUIREMENTSAASDISTHER ATURBED <br />PREAPPROVEDCOMPACTED <br />�, �� <br />WOOD CHIP MULCH / <br />RATE. ALL SOIL AREAS DISTURBED OR COMPACTED DURING CONSTRUCTION, <br />D <br />DURING CONSTRUCTION, <br />AND NOT COVERED BY BUILDINGS OR PAVEMENT, SHALL BE AMENDED WITH �/ a° <br />COMPOST AS DESCRIBED BELOW. <br />3" OF COMPOST 1.75" OF COMPOST <br />1. SCARIFICATION: IF PLACED TOPSOIL PLUS COMPOST OR OTHER INCORPORATEDINTO INCORPORATED INTO <br />ORGANIC MATERIAL WILL AMOUNT TO LESS THAN 12 INCHES, SCARIFY S" OF SITE SOIL (TOTAL 6.25"OF SITE SOIL <br />OR TILL SUBGRADE TO DEPTH NEEDED TO ACHIEVE 12 INCHES OF AMENDED DEPTH OF (TOTALAMENDED <br />LOOSENED SOIL AFTER TOPSOIL AND AMENDMENT ARE PLACED. 95% FOR A SETTLED DEPTH OF 95, FOR A <br />ENTIRE SURFACE SHOULD BE DISTURBED BY SCARIFICATION. DO NOT DEPTH OF 8") SETTLED DEPTH OF 8") <br />SCARIFY WITHIN DRIP LINE OF EXITING TREES TO BE RETAINED. S. <br />SUBSOIL SCARIFIED 4" �� /,iceAVA- ��� ; �� SUBSOIL SCARIFIED 4" <br />2. SETBACKS: TO PREVENT UNEVEN SETTLING, DO NOT .' <br />�� <br />/;AA <br />COMPOST -AMEND SOILS WITHIN 3 FEET ON CENTER OF UTILITY BELOW COMPOST !, A✓ BELOW COMPOST <br />INFRASTRUCTURE (POLES, VAULTS, METERS ETC.). WITHIN ONE FOOT AMENDED LAYER (12" / ��/,`, ��i ��/ V�/ i ��\ 5: AMENDED LAYER (12" <br />OF PAVEMENT EDGE, CURBS AND SIDEWALKS; SOIL SHOULD BE BELOW SOIL SURFACE) /, /A //.y�� BELOW SOIL SURFACE) <br />COMPACTED TO APPROXIMATELY 90%MAX. MODIFIED PROCTOR - <br />DENSITY (ASTM D15S7) TO ENSURE A FIRM SURFACE. DO NOT <br />COMPACT WFFHIN TREE PROTECTION ZONE. - <br />PLANTING BEDS TURF (LAWN) AREAS <br />1.. PREAPPROVED RATE: PLACE 3INCHES OF - 1. PREAPPROVED RATE: PLACE 1.75 INCHES OF <br />COMPOSTED MATERIAL AND ROTOTILL INTO 5 COMPOSTED MATERIAL AND ROTOTILL INTO 6.2S <br />OPTION: AMEND EXISTING TOPSOIL INCHES OF EXISTING SITE SOILS (A TOTAL INCHES OF EXISTING SITE SOILS (A TOTAL <br />AMENDED DEPTH OF ABOUT 9.5 INCHES, FOR A AMENDED DEPTH OF ABOUT 9.S INCHES, FORA <br />AMEND EXISTING SITE TOPSOIL, OR SUBSOIL, EITHER AT PREAPPROVED RATE SETTLED DEPTH OF 8 INCHES). SETTLED DEPTH OF 8INCHES). <br />OR AT CALCULATED RATE BASED ON TESTS OF THE SOIL AND AMENDMENTS. <br />ALL SOVEIL REASDISTUDINGSRBED DURING 2. CALCULATED RATE: PLACE CALCULATED 2. CALCULATED RATE: PLACE CALCULATED <br />BE AMENDED WITHON <br />NOT COVERED BY BUILDINGS OR PAVEMENT, SHALL BE AMENDED WITH AMOUNT OF COMPOSTED MATERIAL OR AMOUNT OF COMPOSTED MATERIAL OR <br />OR <br />COMPOST AS DESCRIBED BELOW. APPROVED ORGANIC MATERIAL AND ROTOTILL APPROVED ORGANIC MATERIAL AND ROTOTILL <br />o <br />INTO DEPTH OF SOIL NEEDED TO ACHIEVE 8 INTO DEPTH OF SOIL NEEDED TO ACHIEVE 8 <br />° <br />1. SCARIFICATION: SCARIFY OR TILL SUBGRADE TO 8 INCHES DEPTH (OR INCHES OF SETTLED SOIL AT IO%ORGANIC INCHES OF SETTLED SOIL AT 5%ORGANIC <br />5 <br />TO DEPTH NEEDED TO ACHIEVE A TOTAL DEPTH OF 12 INCHES OF CONTENT. CONTENT. <br />i <br />UNCOMPACTED SOIL AFTER CALCULATED AMOUNT OF AMENDMENT IS <br />3. RAKE BEDS TO SMOOTH AND REMOVE SURFACE 3. WATER OR ROLL TO COMPACT T085%OF <br />ADDED). ENTIRE SURFACE SHOULDULDBE DISTURBED <br />DI SCARIFICATION <br />€ <br />- <br />DO BE RETAIN. <br />DO NOT SCARIFY WITHIN DRIP LINE Of EXISTING TREES TO BE RETAINED .ROCKS LARGER THAN .2INCHES DIAMETER. MAXIMUM DRY DENSITY: RAKE TO LEVEL AND <br />TREES <br />q <br />OR WHERE SCARIFICATION WOULD DAMAGE TREE ROOTS OR AS MULCH PLANTING BEDS WITH 3"4" OF ORGANIC REMOVE SURFACE ROCKS LARGER THAN 11NCH <br />DETERMINED BY THE ENGINEER, MULCH OR STOCKPILED DUFF. DIAMETER. <br />2 <br />2. SETBACKS: TO PREVENT UNEVEN SETTLING, DO NOTCOMPOST-AMEND <br />SOILS WITHIN 3 FEETON CENTER OF UTILITY INFRASTRUCTURE (POLES, <br />„£ <br />VAULTS, METERS ETC.). WITHIN ONE FOOT OF PAVEMENT EDGE, BOB <br />3 <br />CURBS AND SIDEWALKS; SOIL SHOULD BE COMPACTED TO PUBLIC WORKS <br />EVERETT <br />z <br />® <br />APPROXIMATELY 90%MAX. MODIFIED PROCTOR DENSITY (ASTM WASHINGTON DEPARTMENT <br />w„ <br />D1557) TO ENSURE A FIRM SURFACE. DO NOT COMPACT WITHIN TREE <br />Bm <br />_ <br />PROTECTION ZONE. vx sass xuxEnewvrnvaw wweur °"""eso - 01/04/2021 <br />" ° <br />POST- CONSTRUCTION SOIL <br />QUALITY AND DEPTH 203 <br />-- - - - <br />- ---- - - ---- - - - <br />I <br />3"-4" (SETTLED) <br />/��� I <br />ARBORIST // GRASS SEED <br />WOOD CHIP ✓✓ / ✓i✓ OR SOD <br />MULCH �; �: ✓ - <br />0„ <br />6" IMPORTED 6" IMPORTED a, <br />TOPSOIL MIX TOPSOILMIX 3"-4" <br />(COMPACTED (COMPACTED <br />DEPTH) DEPTH) AR ORIST GRASS <br />` 6' WOODCHIP ✓ ���j �� <br />t---"` MULCH <br />\%\/%' <br />SUBSOILIS �✓ ,\ SUBSOIL IS <br />SCARIFIED / ' �/ A '< / i �/ �F/ �✓ / A / i <br />6" SCARIFIED 6" <br />�j<<\t✓j A \�/ <br />BELOW BELOW / /� ,/ /� A , <br />IMPORTED a A c IMPORTED <br />�X xf✓ i / VAS ✓ <br />TOPSOIL MIX VA/iA / �� � /A ��/v� TOPSOIL MIX ✓�/ <br />'�/ <br />UNDISTURBED ��/✓' �i. i �i �// UNDISTURBED <br />NATIVE SOIL NATIVE SOIL <br />PLANTING BEDS TURF(LAWN) AREAS i S✓/-/ �/ ).��� '� <br />/ /�V <br />1. USE IMPORTED TOPSOIL MIX 1. USE IMPORTED TOPSOIL MIX <br />CONTAINING 10% ORGANIC <br />CONTAINING 5%ORGANIC MATTER <br />�j�/�/✓ /� <br />MATTER (TYPICALLY AROUND 40% _ (TYPICALLY AROUND 25% yv VAv ��� <br />��C �- //\ �„ <br />COMPOST). SOIL PORTION MUST BE COMPOST). SOIL PORTION MUST BE ,/ ✓ VAi <br />SAND OR SANDY LOAM AS DEFINED SAND OR SANDY LOAM AS DEFINED <br />BY THE USDA. PLACE 3INCHES OF BY THE USDA. PLACE 3INCHES OF <br />LAWN PLANTING BEDS TURF IMPORTED TOPSOIL MIX ON IMPORTED TOPSOIL MIX ON (LAWN) AREAS <br />SURFACE AND TILL INTO INCHES SURFACE AND TILL INTO 2 INCHES <br />OF SOIL. PLACE SECOND LIFT OF 3 OF SOIL. PLACE SECOND LIFT OF 3 <br />c <br />INCHES TOPSOIL MIX ON SURFACE. INCHES TOPSOIL MIX ON SURFACE. OPTION: NO DISTURBANCE <br />- 2. RAKE OTH 2. WATER OR ROLL O COMPACT TO <br />EMOBEDSSURFACE LEAVE NATIVE VEGETATION AND SOIL UNDISTURBED AND PROTECT FROM COMPACTION DURING <br />REMOVE SURFACE ROCKSLARGER <br />ROCKS LARGER MAXIMUM <br />MAXIMUM DRY DENSITY. <br />2 MULCH RAKE T CONSTRUCTION.. IDENTIFY AREAS OF THE SITE THAT WILL NOT BE STRIPPED, LOGGED, GRADED OR <br />LOCKSLEVEL <br />THAOVEN <br />PLATINGN DRIVEN ON AND FENCE OFF THOSE AREAS TO PREVENT IMPACTS DURING CONSTRUCTION. IF <br />PLANTING BEDS WITH <br />BEES WITH 3" 4 SURFACE <br />OF SURFACE ROCKS LARGER THAN 1 <br />LARGER <br />o <br />TOO NEITHER SOILS NOR VEGETATION ARE DISTURBED, THESE AREAS DO NOT REQUIRE AMENDMENT. <br />ORGANIC MULCH OR STOCKPILED INCH DIAMETER. <br />DUFF. <br />OPTION: IMPORTED TOPSOIL <br />z <br />e <br />IMPORT TOPSOIL MIX OF SUFFICIENT ORGANIC CONTENT AND DEPTH TO MEETTHE <br />REQUIREMENTS. ALL SOIL AREAS DISTURBED OR COMPACTED DURING CONSTRUCTION AND NOT <br />COVERED BY BUILDINGS OR PAVEMENT, SHALL BE RESTORED AS DESCRIBED BELOW.. <br />n <br />s <br />1. SCARIFICATION: SCARIFY OR TILL SUBGRADE IN TWO DIRECTION TO 6 INCHES DEPTH. <br />ENTIRE SURFACE SHALL BE DISTURBED BY SCARIFICATION. DO NOT SCARIFY WITHIN DRIP <br />o <br />LINE OF EXISTING TREES TO BE RETAINED. ( EVERETT PUBLIC WORKS <br />2. SETBACKS: TO PREVENT UNEVEN SETTLING, DO NOT COMPOSTAMEND SOILS WITHIN 3 WM WASHINGTON DEPARTMENT <br />FEETON CENTER OF UTILITY INFRASTRUCTURE _ 1 ASTRUCTURE POLES VAULTS METER ET <br />C.). WITHIN ONE <br />"'"'"eco <br />os <br />FOOT OF PAVEMENT EDGE, CURBS AND SIDEWALKS; SOIL SHOULD BE COMPACTED TO nvaxsus xwiis"ncx nx eauiwiweLN <br />A Ol/04/2021 <br />s^ <br />APPROXIMATELY 90%MAX. MODIFIED PROCTOR DENSITY (ASTM D1557) TO ENSURE A FIRM POST -CONSTRUCTION SOIL <br />15 <br />SURFACE. DO NOT COMPACT WITHIN TREE PROTECTION ZONE. <br />. 202LILL <br />QUALITY AND DEPTH <br />• e <br />Know what's below. <br />Call two business <br />days before you dig. <br />Z <br />O <br />a <br />it <br />0 <br />Tn <br />W <br />0 <br />w <br />Q <br />w <br />O <br />H <br />_J <br />W Q <br />OW <br />Z 0 <br />W <br />iN0000� <br />Q DO <br />O��N <br />to Ln <br />~ (N C'4 <br />W � J x- <br />W <br />O L>U <br />N <br />0. O <br />U <br />N <br />W N <br />V <br />Z <br />z <br />Z <br />Wrz <br />W <br />E W <br />Z <br />O Z <br />W <br />Z <br />0 ° <br />V � <br />Z <br />O q <br />3 1W <br />z"T <br />F O W <br />W U z <br />W <br />>LL <br />o� <br />LU <br />LL O z <br />H <br />0 <br />O 00 <br />N <br />a <br />U <br />F NO J. NO. pSN. BY: <br />22-0104 EJT <br />DATE: <br />8/11 /2022 <br />SCALE: <br />N.T.S. <br />DRAWMG NO. <br />6OF9 <br />