Laserfiche WebLink
1 <br />2 <br />3 4 <br />5 <br />6 <br />Call before you <br />Dgg.8-1-1 <br />® <br />SURVEYORS <br />CERTIFICATION <br />or 1-800-424-5555 <br />UNDERGROUND <br />RECORD DRAWING <br />SHOWN HEREON AREEPT TRUE MBERAND CORRECT TO <br />/ HEREBY CERRYY THAT THE AS -BUILT BELIEF <br />THE BEST Of MY KNDWLfDCE AND BELIEF AS SURl2TED IN THE f1fLD SfPTEMBER, 707J. <br />SERVICE (USA) <br />O ZO ZO 40 <br />� ° <br />CIF' <br />SCALE 1 „=20' <br />..\dykeman-Header-Standard-23614708.tif <br />This Record Drawing has been prepared, in part, <br />SIGNED. <br />based on "As -Built" information provided by <br />MICHAEL R. MERRITfr P.L.S. <br />LEGEND <br />others. Though the as -built information and this <br />PROPERTY LINE N793306'E-468P <br />\ <br />drawing are based on the best available°°°`` <br />V ` <br />° �e48 69000 ° <br />o <br />SANITARYSEWER IM SS s <br />E <br />_ _ <br />information, no presumption should be made <br />I <br />X _ / <br />� �� � <br />���������� ����������CONSULTANT: <br />GREASE WASTE GW-GW- <br />E <br />x <br />�, <br />v <br />_ <br />�&n x <br />y <br />f l� � • • <br />SANITARY MH/CO O <br />/ <br />regarding the drawing's accuracy. <br />I/`/ X/l <br />12"DIW <br />WATER MAIN 12'D1W W_W� <br />1 / <br />x <br />Jim Knappert 01/08/2024 <br />I <br />/ \ <br />�� <br />I <br />FH/FDC/PIV/VALVE FN�FDC�P1Va WV, FHA DP1V NWV <br />FCWATER VAULT/METER <br />Plaxc i <br />� <br />o <br />29� D <br />Permit Inspector x <br />x <br />u� o I <br />..WCE Logo Stacked_FC.tif <br />r <br />I <br />\ <br />SEE SHEET CS.00 FOR CITY OF EVERETT SANITARY SEWER NOTES <br />x <br />H= <br />IE N 8 YC OW 569.12 <br />IE E 6601E 594.27 <br />� / <br />I`� \ / <br />IE S 010C 589.12 <br />SUMP 588.1 <br />x <br />r,P'.1ffCNC <br />DIRT <br />• <br />SPORTS <br />I/CH <br />LI` P <br />I <br />MELD <br />,/ <br />GAS SERVICE <br />1. CONTRACTOR TO EXCAVATE <br />TRENCH. PSE TO INSPECT TRENCH, <br />INSTALLATION NOTES <br />TRENCH, PROVIDE BEDDING MATERIAL AND GAS PIPING CONDUIT, AND BACKFILL <br />BEDDING AND PIPING PRIOR TO BACKFILL. COORDINATE WITH PSE <br />BEFORE BEGINNING CONSTRUCTION. <br />>c ETPAICBMLEC <br />PLAY <br />AREA <br />X <br />X / <br />X -X / <br />Z <br />\I <br />` <br />I �I <br />2. INSTALLATION PROCEDURES SHALL BE PER PSE GAS SERVICE HANDBOOK (CURRENT EDITION). <br />3. DIG GAS SERVICE TRENCH A MINIMUM OF 12-INCHES WIDE. <br />X <br />\ <br />- - - - - <br />/ <br />4. GAS SERVICE PIPING TO HAVE <br />A MINIMUM OF 36-INCHES OF COVER. <br />D <br />PROJECT IDENTIFICATION: <br />1R`-0 G__.E) 2952 D 90 <br />LINK FENCE o E N 6'C� 5 <br />I \ <br />4 " ` <br />5. INSTALL 4" SCHEDULE 40 PVC CONDUIT CARRIER PIPE WITH 3/8" MINIMUM DIAMETER PULL ROPE FOR GAS <br />SERVICE PIPE. <br />CHALLENGER <br />ADJUST VALVE x ( <br />_ - - - - - SUMP 591.9 <br />�TETHERBALL <br />\ I�1 <br />6 BEDDING SHALL BE <br />TRENCH. <br />3" SAND WITH 6" SAND AS COVER OVER CONDUIT PRIOR TO BACKFILLING <br />ELEMENTARY <br />STEMS AND LIDS TO <br />PROPOSED GRADES I <br />I XX (TYP.) X X X <br />X X X X X X <br />� <br />7. CONTRACTOR TO DIG (2) WORK <br />PITS (4'x4'), ONE AT EACH END, FOR PSE ACCESS AND INSTALL CONDUITS TO <br />SCHOOL <br />f I <br />STAIRS W/ <br />HAND <br />... <br />\ k <br />v ,`(I <br />\ <br />PIT OPENINGS. CONDUIT SHALL STOP 4' FROM EXISTING GAS MAIN THAT NEW SERVICE WILL TIE INTO. <br />COORDINATE WITH PSE. <br />FOR <br />R <br />8' CHAIN <br />LINK FENCE <br />J <br />2719 0 ce <br />E 011C9Z40 <br />IEE6PVC587.72 <br />I \/\ <br />I <br />8. CAP CONDUIT ENDS AND MARK <br />LOCATIONS WITH A CONDUIT OR 2x4 MARKED "GAS". COORDINATE WITH PSE. <br />MUKILTEO SCHOOL <br />X X X X X X X <br />5 <br />X <br />`' IE S 121CMP 587.72 <br />� <br />I( <br />X <br />X <br />• NEWET POLE <br />�4I <br />'a PER El(EC'L W W15 587.92 <br />\\ <br />DISTRICT <br />(TYP) <br />:.: I <br />• ;, SD SD SD SD <br />SD <br />65 <br />UTILITY CROSSING <br />" <br />a p. B TYPE I' a. <br />p p IAISTACLADAANDHEEL ELBOW <br />p W/ DOW.45- <br />2 <br />s <br />,. <br />7�DaCB <br />SS (GREASE) IE 590.78 <br />6" SS LOOR DRAIN) TOP 590.29 <br />-NPED <br />IM 593.45'PROOF COMPLIANT GRATEy, p <br />"3 <br />AT <br />AS A <br />M34 <br />M N 8'CPEP 587.93 <br />/ <br />' O a Ira590.04o6"(OASW. ' <br />HALT ",ss <br />W W W 8 DUCTILE IRON W <br />W <br />/ 19 <br />W E I1 W W ASPHALT <br />E E ePVc 58793 <br />567.93 <br />SUMIE IIIP 5977 <br />�/ / <br />` <br />/y� <br />° ELBOW n ay. . FLOOR D�tAIN UNIAR . <br />6 45E 589.74 a 'a � p e p . a.COVERED PLAY AREA <br />6 SEEBETAIL 5 <br />9600 HOLLY DRIVE <br />EVERETT WA 98204 <br />D e" <br />SD T, <br />---- - - ---- <br />UC ; IRO E / <br />D SD _ ` <br />-- <br />I �%� ` %� �I <br />1 (\ / <br />\ ' \ <br />" a <br />37 LF 6 <br />SS • 2.0% <br />.. $1F yN- b`' 6" SSCO <br />° . v C� RIM T GRADE° . <br />° <br />' •' <br />E / \ <br />�� <br />I x x <br />6" SSCO <br />a a I E 59�%00 v <br />�- <br />` a ' �'' " • <br />: . • '�'� .. •. .',. <br />w <br />I <br />I \� <br />h nn <br />RIM TO GRADE <br />IE590.33 <br />a a SEED (TYPd' <br />° ` '' p.. <br />CONFORMED <br />r E E <br />h <br />- - <br />. . <br />d.....,.... ...: ' <br />• • . .''� �v/OOWTORIiEDE190H� <br />i`. <br />�•: a I <br />\ / <br />/ � N \ Y` <br />% <br />10 GALLON GREASE <br />� <br />�' p� 4"x�" CCENFRIC � ;a.... � . <br />'REDO ER,� �_-- ° <br />�T0 �G �G' <br />DOCUMENTS <br />• a <br />I <br />a - FT'G <br />08/05/2022 <br />SD SD SD <br />SD <br />SD <br />3117 D CO 6 EE82..]"a <br />°00��( <br />�• •.. .. '0 .[F=: qIN MON.. F '(� <br />, ; °..4. •.: s �E]AI .�. <br />;" / <br />. i.: • <br />1 <br />\ / <br />\ 3 <br />INTERCEPTOR 0 <br />IE 590.29 6"(IN)N <br />p 1 .-'�. p <br />- <br />C <br />3118 D CB <br />NM 59273 <br />RN 59266 37LF8 <br />ssmz.w <br />i` <br />•.: � 1 M COGppDE. •`1 •,.''. ° `I <br />y <br />6' �1 <br />/ <br />\ N <br />/ <br />9 . _ <br />I IE5 0046"OUT _ <br />_ _ <br />. <br />This drawing is: <br />C <br />d E 12'04P 590.43 <br />IE S 4" 04P 591.38 <br />M N 8'CMP 589J39 <br />RIM OG <br />IE E 12'CMP 589.50 I E58Q33 <br />H S � 591(� <br />a • �: '• sSEIVIAIL 7I >! ' <br />• R.. • .. • ' <br />r <br />-- r • ' •. a. <br />�� , <br />i` <br />/ <br />;\ / \ I / I <br />i �I (\ <br />----- <br />SEED 101E �- <br />- - - - -ETA- - - - - - <br />e <br />---- <br />- -- ---- - - <br />W I . GREASE ASTE <br />p POINT OF C NNECTION <br />1. Copyright 2020 Dykeman, Inc. <br />y <br />2. The Architect's Instrument of Professional Service. <br />ff W 12' CUP 59068 <br />- - - - - - - LIL112'g1P 51! 50 <br />r -p 5B8 7 r - - - - - - - - p <br />SUMP 586,3 <br />FT : - <br />° : + / <br />i� F ASPHALT / <br />�\ - jl <br />� <br />J d i c� <br />v IE 591.05 <br />i SEE PLUMBING PLANS <br />3. For use on this project only. Obtain Architect's <br />written permission for any other use or reproduction. <br />- • <br />- - - - - - ¢ v � CN <br />Al I- - - - - - -- - " ar i FOR CONTI UATION <br />- - - - - i I/ \ �Ck Iltll 6 SSCO 12 LF 6" I m v .. <br />F/F=593.71 Gn <br />"®, v' NO PAR ING INK I�EN CE RIM TO GRADE SS Q 2.0% °I 8.6'1 4" SANITAR SEWER <br />F/F=593.69 <br />F=593.72 <br />F/F=593.73 W� 9LF6• <br />)` .'•. 1 I <br />V <br />IE 590.01 I <br />p. IE 589.60 <br />RIM TO GRADE 5603.0% <br />IE590.01 <br />!. . <br />1. � <br />Z <br />\ , 1 <br />TI <br />(2) 3" VENT PIPES PER <br />a ° I / SEE PLUMB NG PLANS <br />2020-009 <br />I 6•uE 9B.T6 <br />I <br />6•A6•EL60W <br />`' <br />FFE 593.72 �. <br />Gr--- <br />`� \/ <br />`\ <br />�_ <br />MECHANICAL PLANS - <br />-a FOR CONTI UATION <br />°EMM <br />I <br />s„y a' IE6 M I <br />F/F=593.72 <br />F PROTECT EX ELE <br />i a TRANSFORMER TO <br />^ n <br />"j j' `j j` <br />��� <br />1�C,/ <br />` y <br />\/ �/� <br />6"45" ELBOW <br />IE 589.78 <br />`n as II °REVISIONS: <br />. 6 45 ELBOW <br />a.. cj�t��o. 010. <br />1v,' :.. <br />REMAIN <br />If II <br />/l� � <br />p 1E589.48 <br />ti', <br />PROTECT EX BUILDING TO REMAIN <br />CONNECTION/ <br />IE 569.39 <br />I <br />� •.. <br />>< I <br />•5 :. <br />I/ /\ � <br />��� <br />6"x4" WYE <br />V <br />VV <br />p <br />MARK DATE DESCRIPTION <br />L <br />.: •, <br />° <br />J <br />0. (1j T�rvausr L6 ocRl <br />/ <br />IE5ss.5o <br />a p. F/F=593.72 <br />2.5'�WA� <br />- -•( <br />- DOMESTIC WATER SYSTEM -FiGi <br />'SEE NLARGEMENT 'A' RIGHT i �.� <br />/ / <br />I(X <br />6" WYE <br />2 F/F=593.71 <br />F/F=593.72 25' WAIER <br />SERVICE <br />F/F=593.72 <br />,... , TO BE INTER -CONNECTED TO <br />•:; EXISTING BUILDING SYSTEM. I D CS <br />0. CONNECTTOIXLSTNG <br />/ \ <br />�T�\ . / <br />CONNECTION <br />IE 589.34 <br />SEE <br />.'( .,+ '' ' •. <br />MECH'L PLANS. 591. PRIVATE WATER SHOT TAP) <br />P <br />1 CMP <br />\ <br />IKxyy <br />_ <br />- - - O <br />ssozov6s <br />' ..: �. a, • CONTRACTOR TO <br />PROTECT EX ROOF <br />M W ADAPTOR I 1) <br />'1 '' ; S 18'CMP (178'ADAPIOR (FIX Lil <br />SEE ENLARGEMENT 'B' RIG 1 AS W/THRI,6�6LGGNING <br />r - - - - - a IE W 6PVC <br />SUMP <br />u \ <br />K" >t <br />° <br />M <br />O <br />O <br />�' BETWEEN EX BUILDINGS <br />.•• <br />} <br />>c/ ,x\�yV� <br />a <br />r� M AM M <br />j I 1 10 0 <br />AA <br />0 0 <br />M Al <br />0 <br />'' �' <br />1 A 1798 D CB <br />I y RIM 5M91 <br />\ <br />I�(x\ / <br />ENGLARGEMENT 'A' <br />--------------------- <br />\ <br />O5 <br />"'rI PROTECT EX 2-1/2" <br />'.. I'. ER <br />1 <br />SUMP 5652 <br />\ / / <br />K \ \ P <br />SCALE. ? -10' <br />I <br />RIMT581311 <br />�° AERVICE <br />S MH TO REMAIN <br />:I .: •:' TO <br />F/F=593.7 <br />a <br />I � • <br />NO PAR ING <br />\� <br />I � <br />I <br />E E <br />486J D C8 <br />RMI 593. <br />i I. q RM <br />• . IE E E' 58Z91 <br />/ 3 <br />I .' ® <br />• " <br />✓ � � < <br />1 /I <br />L 1 E E '� <br />®E� <br />RMI 5932 <br />E N 6PVC <br />d SW PVC 587.7I <br />'• a , ., 15' WAIER=593.71 <br />pp <br />a.w FtG- <br />' A <br />_� SL) •' • I <br />1/x <br />�v \ \ / <br />\ <br />6 FIRE DEPARTMENT FI DEPART NT <br />" i �p N ION (F WI <br />J <br />19LF6' <br />N: S 12'CMP 21 ss®z.Dw <br />- <br />•' •1 r . P ggH(E <br />N` CCf <br />(.7._ <br />: \ 5 e olasz <br />IP <br />\ / <br />r \ I <br />CONNECTION 1 1. K X CAP P G # 34 <br />IE 590.21 1 <br />B <br />• <br />PROJECT <br />SUMP 58834 F=593.70 I W/THFUS B OCNNG i'� / P COE FI DE STDS <br />- r � 30 LF 6'01 3 F ,p <br />- 0 C \ / SEE MECH'L PLANS LL <br />I 1 \ I1 SBA <br />4962 D CB <br />PA 593.18 <br />/ °� <br />1i'•E6 <br />5 <br />PROTECT EX <br />SEWER TO REMAIN <br />6'2 D(N97 R �/-�A�1y <br />I B " / <br />II N vl 6 C O 0 52 <br />I <br />1 x I /I <br />FOR CONTINUATION i 1 D IP VALV NS LED AT <br />1 ' PIPE IN ER W/ IM 6 CU. <br />F N 4'ADS 5K48 <br />E S 1Y'CMP 590,35 <br />\11J/J <br />1 <br />v <br />PROTE T EX PLAZA AS <br />I\ <br />• c� w <br />EX 1 .*89.8 v ASPHALT \ <br />°•. �� I <br />/ <br />\ / �� <br />UTILITY CROSSIf G <br />SH D OC INS LLED BE W <br />LL CRUV. <br />PRINCIPAL IN CHARGE: I JAJ <br />PROJECT MANAGER: I JAJ <br />IE W 4'ADS 59082 <br />I F <br />J <br />REQUI ED UNLESS <br />NOTE OTHER <br />\ CONNECT TO EX <br />7 <br />,� P 5B69 <br />/F=593.70 �I <br />\ X <br />/ �\ <br />j <br />WATER IE 589. 6 <br />1 U ILI C SING <br />UTILITY CROSSING <br />PROJECT ARCHITECT: <br />JOB CAPTAIN: I <br />I <br />� <br />�� <br />(TYP <br />IE 587.81 <br />RECHANNEL EX MANHOLE <br />__ .: � c� GATE <br />�I I \ <br />I <br />/\ <br />ELEC L TOP 589. 5 <br />i a LEI'' 590.0t <br />ELEC L IE 590.52 1 <br />P 1 . _ <br />E OP 589. <br />[n b \ 4964 D CB TO ACCOMODATE NEW " ' "� II �� / / \ I WATER TOP 589.88 a. <br />I v 6" FIRE SERVICE:h...;.::.::.:.:..::..:t.':::;:`;;;; <br />RC59272 <br />I I <br />4960DCB <br />g q E 6 PYC 59052 v <br />INLET PIPE <br />i +''•''. o • <br />f/ <br />l <br />\��I <br />IE 590.21 I <br />31;i::G : I, :Ji..•..,.. <br />�L2 <br />ItM15912CPEP 589.45 <br />N <br />IE SE 4 ADS 591.39 <br />I �^ <br />I I 1 <br />I / / \ \r <br />SEE MECH'L PLANS I <br />.... <br />1It <br />E E 12'CMPP 589.37 <br />I E S 6PVC 589.83 <br />� 5 � <br />I: S IfCW 590.32 <br />SUMP588,54 <br />4965 D CB I <br />c <br />L.a \ <br />/ <br />\ <br />/ � <br />FOR CONTINUATION <br />- FTG' FfG FTG <br />. <br />w <br />I IE 6 PVC 589.95 <br />1 � SUMP 588.12 <br />RIM 592eo I <br />H: N 12'CMP 589.12 I <br />1 - - <br />RM1590.93 <br />M" N 18'CMP 585.33 1 � <br />< <br />- v <br />F 593 71 F7 - FfG <br />a p . <br />p SD D <br />E ... °�•• ':�.',�:�'��: <br />/ \ <br />O <br />F SE OVC 589.55 I <br />E S 18'CPEP 585.28 I D <br />E' ° `��;���'�;�' <br />I <br />� <br />RM1593.21 <br />IE SW 12'CMP 589.05 I <br />EX F YDRA T <br />w BPVC 56663 I <br />NO P ING <br />iC <br />% <br />� I' <br />�� <br />�%.............:.....::. <br />slNm s67so PROTECT EX BUILDING <br />I <br />W6P1C WILL i 1764 D MH ASPHALT G) <br />%` <br />° <br />45 BEND (MJ) a <br />a v p. Iki7.(; fiX: <br />' vp <br />I E <br />I S <br />Mai 4'• <br />f 12'(NIP 588 <br />al <br />TO REMAIN <br />5KJ <br />I I I: N 12014v� m <br />E S a0' <br />I \ <br />F6 <br />THRUST BLOCKING <br />p 11 <br />/ RMf-59hP1� <br />IE N 12'CMP 5B&OB <br />'ME 1 <br />I F/F=593.73 <br />\ ! <br />/ <br />L - <br />v <br />I 1787 D CII <br />✓ <br />\ \ iC <br />\ \ / <br />\ <br />/ <br />L'i <br />NEW GAS METER <br />( ) 6" 2 " B D (MJ) <br />w II T ST LOCKIN <br />I I <br />E <br />- - - I�SE 12'CMP 587.76 <br />11 _� --- ------------- <br />� O q: S 4'ADS 5B&56 <br />g L IE W 4 ADS 588,41 <br />------ <br />I <br />_ <br />RN 590.59 <br />IEN1eau584Ji0 <br />I F SE 18'CPEP 5BA80 <br />\ / <br />\ 'jam <br />I \ x� I <br />�� <br />LOCATION (SIZE TBD BY I <br />PSE). COORDINATEW/ <br />PSE. SEE MECH'L PLANS I <br />7 LF 6" C <br />w p <br />a p � PIV R CO c <br />0 M �(Me58757 <br />M <br />M M <br />SUMP 1 <br />1 �\ \ / I <br />FOR CONTINUATION I <br />a I I IR :PTSTD <br />\L� / <br />5390 D AN <br />IiUPoED <br />O r- � 1765 0 MN STOP/� <br />\ <br />I <br />F=593.70 <br />p I C N TO EX G <br />DRAWING <br />/1 <br />1 <br />I IEN40001F583.48 I- <br />O_ �4W \ <br />I /\ x I <br />�(- <br />ER EPIPIN YP <br />LFGAS RV <br />A <br />- - �- - - <br />MATCHLINE - SEE SHEET CS.02 <br />- - <br />-" <br />I a ., <br />�I <br />u, p I FINALSI TB BYPSE. <br />a <br />A <br />(NOT INCLUDED) <br />�. p <br />e II SEE I ALLATIO <br />v <br />UTILITY PLAN <br />Q <br />a I I NO S T S SHEET <br />SERVICE YARD ENCLOSURE o° I <br />aDII <br />FOR SOLID WAST I <br />DISPOSAL (GARBAGE, <br />8° <br />.8 <br />RECYCLING, COMPOST) I <br />PER ARCH' PLANS I <br />DRAWING <br />II GENERATOR � <br />SEE El EC'L PLANS MECH'L YARD EN LOSU E <br />I� <br />GENERATOR PER NRCH' PLANS <br />ENLARGEMENT 'B' <br />C5001 <br />SCALE: 1 "=10' <br />1 <br />2 <br />3 4 <br />5 <br />6 <br />