Laserfiche WebLink
NOTES <br />A. <br />ROMAC, FORD, OR MUELLER SERVICE SADDLE WITH C.C. THREAD TO BE USED ON ALL MAINS 4" DIA. AND <br />LARGER. ALL NEW TAPS ON EXISTING WATER MAINS SHALL BE DONE BY THE CITY OF EVERETT UTILITIES <br />DEPARTMENT AT THE DEVELOPERS OR CONTRACTORS EXPENSE <br />B. <br />CORPORATION STOP: <br />3/4" OR 1" - FORD FB600, OR CITY APPROVED EQUAL <br />1 <br />C. <br />FORD SERIES LAO-2-33S NL FOR 3/4" OR LA02-44S-NL FOR 1" BEND FITTING (1/8 OR 1/4) FOR FLARE x FLARE <br />COPPER. PHYSICAL BENDS IN POLYETHYLENE PIPE ARE NOT ALLOWED. USE APPROPRIATE 1/4 OR 1/8 BENDS PER <br />rl rK <br />NOTE B ABOVE. <br />D. <br />USE MUELLER H-15073 N INSTA-TITE FITTING OR CITY APPROVED EQUAL FOR IPS-PE PLASTIC PIPE X FEMALE <br />COPPER FLARE THREAD. <br />z ¢ <br />E. <br />RESIDENTIAL SERVICE: <br />�2 <br />> <br />1. <br />PROVIDE 3/4" OR 1" POLYETHYLENE TUBING MEETING THE FOLLOWING REQUIREMENTS: <br />o <br />a. AWWA C901. <br />w z <br />b. ASTM D2239, SIDR 7, FOR ID IRON PIPE SIZE (IPS). <br />Og <br />c. ASTM 3350 - PE3608 OR PE4710. <br />z <br />^� <br />2. <br />PROVIDE A #10 AWG, SINGLE STRAND COPPER WIRE WITH BLUE TYPE OF OR USE COATING SUITABLE FOR <br />DIRECT BURY. <br />C <br />H i <br />a. WRAP WIRE AROUND TUBING, ONE WRAP PER FT, ITS ENTIRE LENGTH. <br />U <br />b. SECURE ONE END AROUND THE SADDLE BOLT BETWEEN TWO NUTS AND EXPOSE A MINIMUM OF 18" OF THE <br />OTHER END IN THE METER BOX. <br />- <br />F. <br />NON-RESIDENTIAL SERVICE: <br />A <br />1. <br />PROVIDE 3/4" OR 1" TYPE K COPPER TUBING MEETING ASTM B88, ANSI/NSF 61 & APPLICABLE IAPMO <br />STANDARDS. <br />G. <br />USE 1/4 OR 1/8 BEND BRASS ST BEND WITH MUELLER H-15426 N INSTA-TITE FITTING OR CITY APPROVED EQUAL <br />LU <br />E F G U <br />FOR IPS-PE PLASTIC PIPE X MALE IRON PIPE THREAD. <br />m <br />D a <br />H. <br />3/4" METER SETTER SHALL BE "A.Y. MCDONALD" 62-212WWDD33-15 OR APPROVED EQUAL. <br />1" METER SETTER SHALL BE "A.Y. MCDONALD" 62-415WWDD44-15 OR CITY APPROVED EQUAL. <br />B <br />o <br />I. <br />METERS SHALL BE SUPPLIED AND INSTALLED BY CITY UTILITIES DEPARTMENT AT THE DEVELOPERS OR <br />N <br />CONTRACTOR EXPENSE. <br />0 <br />J. <br />PROVIDE METER BOX BODY MANUFACTURED BY "RAVEN PRODUCTS, FOR A 3/4" USE MODEL RMB-11-18-12, <br />3 <br />3/4" OR 1" METERED WATER SERVICE <br />FOR A 1" USE MODEL RMB-15-27-12", MOUSEHOLES CUT, WITH AASTHO H-20 RATED DI FLUSH SOLID COVER <br />Z <br />LID OR EQUAL. <br />° <br />0 <br />0 <br />K. <br />PLACE SAWDUST IN METER BOX AROUND PIPE TO TOP OF METER TO PREVENT FREEZING. <br />0 <br />Z <br />0 <br />CITY OF EVERETT <br />EVERETT PUBLIC WORKS DEPARTMENT <br />d <br />0 0 <br />City Engineer alter ger Current Rev Date <br />RYAN SASS SR'.�AEFTI �PAULWILHELM WRB 09/18/2017 <br />T11 <br />am <br />0 0 <br />ST <br />METERED WATER SERVICES gNDARDDPAWING No. <br />E a <br />3/4" & 1" 501 <br />(�_] 1VIE'TERED WATER SER VICES 314" & 4" <br />�62 N. T. S. (CITY OF EVERETT STD. 501) <br />Know what's below. <br />Call before you dig. <br />UTILITY CONFLICT NOTE:• <br />CAUTION.• <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, <br />DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE <br />PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL <br />AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE <br />CALLING UTILITY LOCATE ® 1-800-424-5555 POTHOLING ALL OF THE EXISTING <br />UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY <br />WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN <br />ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND <br />ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR <br />SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL <br />PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />E7 <br />0 <br />0 <br />0 <br />3 <br />0 <br />0 <br />0 <br />w <br />z <br />0 <br />z <br />I <br />o � <br />0 <br />y <br />�a <br />wm <br />os <br />a <br />E Q ry <br />1/2 CU YD WASHED ROCK <br />1-1/2" DRAIN ROCK <br />Xll <br />SW 1/4, NE 1/4, SEC. 23, T.28 N., RAE., W.M. <br />CITY OFEVERETT, WASHINGTON <br />MAX RAKE, 1/4" PER FT <br />FROM GROUND LEVEL <br />TRAFFIC SAFETY VALVE BOX AND EXTENSION PER <br />FEATURE BREAK -OFF STANDARD DRAWING 505 <br />FLANGE, BREAK OFF <br />NUTS AND BOLTS <br />DUCTILE IRON TEE <br />RETAINER (MJxMJxFL) OR <br />GLANDS TAPPING TEE (FL) <br />K <br />12"x12"x4" <br />CONIC BLOCK <br />6 MIL PLASTIC SHEETING WRAP <br />UNDISTURBED EARTH <br />GATE VALVE <br />(MJ x FL) <br />2 FIREIIYDRANT INSTALLATION <br />�62 N.T.S. (CITY OF EVERETT STD. 507) <br />PARTS <br />A. HYDRANTS AND ALL MATERIALS SHALL CONFORM TO <br />AWWA STANDARDS AND SHALL BE OF STANDARD <br />MANUFACTURE (MUELLER SUPER CENTURION #250, <br />WATEROUS PACER #WB67, OR CITY APPROVED <br />EQUAL). <br />B. 5-1/4" VALVE MINIMUM. <br />C. 1-1/4" OPERATING NUT AND CAP NUT FOR 2-1/2" <br />PORTS. <br />D. NATIONAL STANDARD THREAD ON 2-1/2" PORTS. <br />E. 5" STORZ FITTING WITH NATIONAL STANDARD THREAD <br />ON THE 4-1/2" PORT. <br />F. IF HYDRANT RISES THROUGH CONCRETE, USE <br />EXPANSION STRIP AROUND HYDRANT BARREL, PER STD <br />PLAN 509. IN ADDITION, INSTALLATION OF THE <br />HYDRANT ON PRIVATE PROPERTY SHALL EQUAL OR <br />EXCEED THE STANDARDS FOR INSTALLATION OF <br />PUBLIC FIRE HYDRANTS IN THE CITY OF EVERETT. <br />G. PROVIDE FOR VEHICULAR TRAFFIC PROTECTION WHEN <br />NECESSARY PER STANDARD DRAWING 508. <br />H. STEAMER PORT TO BE FACING STREET OR ROADWAY <br />FOR FIRE ENGINE ACCESS. <br />I. BREAK -OFF FLANGE TO BE 2"-4" ABOVE GROUND <br />LEVEL. <br />J. INSTALL CONCRETE PAD AROUND HYDRANT IN <br />UNPAVED, SOD AND ASPHALT AREAS PER STANDARD <br />DRAWING 508. <br />K. HYDRANT CONNECTION PIPE TO BE DUCTILE IRON <br />CLASS 52, ANY INTERMEDIATE JOINTS TO BE MJ WITH <br />RETAINER GLANDS, OR FIELD LOCK GASKETS. <br />L. FIRE HYDRANTS SHALL BE PAINTED WITH TWO COATS <br />OF HIGH GLOSS CATERPILLAR YELLOW, LUXLITE <br />#6100-516 OR "RUST-OLEUM" #7448 OR APPROVED <br />EQUAL. THE PORT CAPS WILL BE PAINTED BLACK. <br />M. PROVIDE FOR A MINIMUM OF T CLEAR ZONE AROUND <br />HYDRANT. <br />4 CITY OF EVERETT <br />:77 PUBLIC WORKS DEPARTMENT <br />clty Engineer Section Manager CAp Manager prawn By Current Rev Date <br />RYA SASS R HEFTI PAUL WILHELM WRB 5/9/2018 <br />TITLE <br />FIRE HYDRANT <br />INSTALLATION 507 <br />WATER MAIN SYSTEM GENERAL NOTES: <br />ALL CONSTRUCTION OF WATER MAINS AND RELATED APPURTENANCES SHALL <br />CONFORM TO THESE STANDARDS, APPLICABLE AMERICAN WATER WORKS ASSOCIATION <br />(AWWA) SPECIFICATIONS AND APPLICABLE SECTIONS OF DIVISION 7 OF THE <br />WSDOT/APWA STANDARD SPECIFICATIONS. THE GENERAL REQUIREMENTS OF AWWA <br />AND THE WSDOT/APWA STANDARD SPECIFICATIONS SHALL APPLY UNLESS THEY ARE <br />INCONSISTENT WITH ANY OF THE PROVISIONS OF THIS PARTICULAR SECTION. <br />SHOULD INCONSISTENCIES OCCUR, THESE STANDARDS SHALL HAVE PRECEDENCE. <br />ALL REFERENCE TO STANDARD SPECIFICATIONS SUCH AS AWWA OR WSDOT/APWA <br />SHALL REQUIRE THE USE OF THE LATEST EDITION. <br />ANY PUBLIC WATER SYSTEM OR ANY PLUMBING IN A RESIDENTIAL OR <br />NONRESIDENTIAL FACILITY PROVIDING WATER FOR HUMAN CONSUMPTION WHICH IS <br />CONNECTED TO A PUBLIC WATER SYSTEM SHALL BE LEAD FREE. WITH RESPECT TO <br />SOLDERS AND FLUX, "LEAD FREE" SHALL MEAN NO MORE THAN 0.2% LEAD. WITH <br />RESPECT TO PIPES AND PIPE FITTINGS, "LEAD FREE" SHALL MEAN NO MORE THAN <br />8q LEAD. <br />WATER MAIN EXTENSIONS WILL BE REQUIRED WHEN THE PROPERTY DOES NOT <br />FRONT ON A WATER MAIN OR WHEN THE EXISTING WATER MAIN IS NOT ADEQUATE <br />TO MEET THE MINIMUM FIRE FLOW REQUIREMENT. THE NEW WATER MAIN EXTENSION <br />SHALL EXTENDED ACROSS THE PROPOSALS FULL FRONTAGE AND SHALL BE <br />EXTENDED THROUGH AND TO THE LIMITS OF THE PROPERTY BEING DEVELOPED FOR <br />SYSTEM CIRCULATION OR FUTURE DEVELOPMENT AS DETERMINED BY THE PUBLIC <br />WORKS DEPARTMENT. THE MINIMUM SIZE WATER MAIN SHALL BE DETERMINED BY <br />THE PUBLIC WORKS DEPARTMENT AND SHALL BE AT LEAST 8" INCHES IN DIAMETER <br />UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS DIRECTOR OR HIS DESIGNEE. <br />WATER MAIN EXTENSIONS OR REPLACEMENTS AND/OR NEW FIRE HYDRANT <br />INSTALLATIONS MAY ALSO BE REQUIRED PER THE REQUIREMENTS OF THE CITY FIRE <br />MARSHAL. FIRE HYDRANT INSTALLATIONS ARE NOT ALLOWED ON WATER MAINS THAT <br />DO NOT MEET THE MINIMUM FIRE FLOW REQUIREMENTS OF THE AREA. IN A SINGLE <br />FAMILY / DUPLEX NEIGHBORHOOD, THE FIRE FLOW IN THE MAIN MUST BE A <br />MINIMUM OF 1000 GPM BEFORE THE INSTALLATION OF A FIRE HYDRANT IS <br />ALLOWED. <br />A FIRE HYDRANT IS REQUIRED WITHIN 350 FEET OF EVERY STRUCTURE FOR SINGLE <br />FAMILY HOMES AND DUPLEXES AS WELL AS NEW SUBDIVISIONS AND SHORT <br />SUBDIVISION FOR SINGLE FAMILY HOMES AND DUPLEXES. <br />FOR ALL OTHER BUILDINGS FROM TRIPLEXES TO COMMERCIAL USES, A FIRE <br />HYDRANT IS REQUIRED WITHIN 200 FEET, BUT NOT CLOSER THAN 50 FEET TO ANY <br />STRUCTURE (MEASURED DISTANCE TO BE ALONG ROUTE TO BE TRAVELED BY FIRE <br />EQUIPMENT). <br />WATER METERS ARE REQUIRED FOR ALL NEW SERVICES INCLUDING DOMESTIC, <br />IRRIGATION AND FIRE SERVICES. <br />AFTER THE INSTALLATION OF ANY WATER SERVICE BY THE PUBLIC WORKS <br />DEPARTMENT, THE PROPERTY OWNER SHALL BE HELD RESPONSIBLE FOR, AND MAY <br />BE CHARGED FOR, ANY AND ALL DAMAGES TO THE SERVICE LINE, METER SETTER, <br />METER AND METER BOXES/VAULT OR ANY OTHER APPURTENANCES UNTIL <br />COMPLETION OF CONSTRUCTION AND/OR THE STRUCTURE IS APPROVED FOR <br />OCCUPANCY. <br />ALL WATER MAINS ON PRIVATE PROPERTY THAT ARE LOOPED BACK TO THE PUBLIC <br />RIGHT-OF-WAY OR ARE OPEN TO THE GENERAL PUBLIC SYSTEM SHALL BE <br />INSTALLED IN EASEMENTS, GRANTED TO THE CITY, AND SHALL BE MAINTAINED BY <br />THE CITY. (SEE SECTION 5-8.6 FOR MAIN LOOPING REQUIREMENTS.) <br />THE MINIMUM WATER MAIN EASEMENT WIDTH SHALL BE 15 FEET, 5 FEET ON ONE <br />SIDE AND 10 FEET ON THE OTHER SIDE AND SHALL BE EXCLUSIVE FOR THE WATER <br />MAIN AND APPURTENANCES. THE LEGAL DESCRIPTION SHALL BE PREPARED BY A <br />SURVEYOR LICENSED TO PRACTICE IN THE STATE OF WASHINGTON. THE EASEMENT <br />SHALL BE REVIEWED AND APPROVED BY THE PUBLIC WORKS DIRECTOR OR HIS <br />DESIGNEE PRIOR TO ACCEPTANCE. <br />DUE TO THE COMPLEXITIES OF MANY WATER MAINS AND THEIR INTERFACE WITH <br />OTHER UNDERGROUND STRUCTURES, ALL WATER MAIN CONSTRUCTION SHALL BE <br />STAKED TO ENSURE PLACEMENT WITHIN DESIGNATED EASEMENTS. ANY DEVIATION <br />FROM THIS REQUIREMENT MUST BE APPROVED BY THE PUBLIC WORKS DIRECTOR OR <br />HIS DESIGNEE. <br />UPON COMPLETION OF THE INSTALLATION OF THE WATER SYSTEM, THE ORIGINAL <br />SIGNED DRAWING OF THE WATER CONSTRUCTION PLAN MUST BE EDITED TO REFLECT <br />ACTUAL CONSTRUCTED CONDITIONS (RECORD DRAWINGS) BY THE <br />DEVELOPER/CONTRACTOR, CERTIFIED AS SUCH BY HIM AND TURNED INTO THE CITY. <br />A RECORD DRAWING PRINT SHALL BE SUBMITTED FOR CHECKING BY THE CITY <br />INSPECTOR AND PUBLIC WORKS DEPARTMENT PRIOR TO SUBMITTING THE REVISED <br />ORIGINALS. THE WATER RECORD DRAWING SHALL BE SUBMITTED WITHIN 14 DAYS OF <br />THE PUBLIC WATER MAIN BECOMING LIVE. <br />THE INSTALLATION OF ALL WATER MAINS AND APPURTENANCES SHALL BE IN <br />ACCORDANCE WITH THE CONSTRUCTION PLANS AS APPROVED BY THE PUBLIC WORKS <br />DIRECTOR OR HIS DESIGNEE FOR THE PROJECT. ANY DEVIATIONS OR CHANGES ARE <br />TO BE APPROVED BY PUBLIC WORKS DIRECTOR OR HIS DESIGNEE BEFORE THE <br />CHANGES ARE INCORPORATED INTO THE WORK. <br />ALL MATERIALS SHALL BE NEW AND UNDAMAGED. UNLESS OTHERWISE APPROVED BY <br />THE PUBLIC WORKS DIRECTOR OR HIS DESIGNEE, THE SAME MANUFACTURER OF <br />EACH ITEM SHALL BE USED THROUGHOUT THE WORK. CONTRACTORS SHALL FURNISH <br />A WATER TIGHT PLUG OF THE APPROPRIATE SIZE WHICH SHALL BE INSTALLED IN <br />THE END OF THE WATER MAIN ANYTIME WORK IS DELAYED OR STOPPED. <br />WATER MAIN SYSTEM CONSTRUCTION PLAN NOTES: <br />A. WATER PLANS ARE TO BE SEPARATE FROM OTHERS AND SHALL HAVE WATER MAINS <br />HIGHLIGHTED AND INDICATE LOCATIONS OF OTHER UTILITIES. <br />B. PLANS MUST SHOW EASEMENTS WHERE MAINS ARE ON PRIVATE PROPERTY AND ALL <br />HYDRANTS, METERS, AND OTHER APPURTENANCES MUST BE WITHIN THE EASEMENTS. <br />EASEMENTS MUST MEET THE REQUIREMENTS OF SECTION 5-1. <br />C. EASEMENTS MUST BE EXECUTED AT COMPLETION OF CONSTRUCTION. EASEMENTS FOR <br />WATER MAINS MUST BE 15 FEET WIDE WITH THE CENTER OF THE WATER MAIN 5 FEET <br />FROM ONE OF THE SIDES LEAVING 10 FEET ON THE OTHER. ACCESS TO EASEMENTS <br />FOR MAINTENANCE MUST REMAIN OPEN. STRUCTURES, FENCES, AND SHRUBS ARE NOT <br />TO BE PLANTED ON EASEMENTS. <br />D. SHOW ELEVATIONS OF SEWER MAINS, WATER MAINS AND STORM DRAINS WHERE THEY <br />CROSS EACH OTHER. <br />E. POTABLE WATER MAINS SHALL MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL CLEARANCE <br />AND 18 INCHES VERTICAL SEPARATION ABOVE NON -POTABLE UTILITIES (INCLUDING <br />SEWER, STORM DRAINAGE AND IRRIGATION) WHENEVER POSSIBLE. IF SITE CONDITIONS DO <br />NOT ALLOW SUCH MINIMUM SEPARATIONS, PIPELINES MAY BE LOCATED CLOSER TO EACH <br />OTHER PROVIDED ADDITIONAL PRECAUTIONS ARE IDENTIFIED AND INSTITUTED TO ASSURE <br />PROTECTION OF THE POTABLE LINE. NO OTHER UTILITIES, POTABLE OR NON -POTABLE, <br />SHALL BE WITHIN 5 FEET HORIZONTAL AND 12 INCHES VERTICAL FROM THE WATER MAIN. <br />F. ALL INSTALLED HYDRANTS MUST BE COVERED BY A BURLAP BAG OR OTHER SUITABLE <br />COVERING UNTIL ACCEPTED BY THE PUBLIC WORKS DIRECTOR OR HIS DESIGNEE AND <br />PLACED IN SERVICE. <br />G A WASHINGTON STATE APPROVED BACKFLOW PREVENTION DEVICE IS REQUIRED FOR ALL <br />IRRIGATION SYSTEMS. <br />H. ALL ENVIRONMENTAL SENSITIVE AREAS SHALL BE SHOWN ON THE WATER SYSTEM <br />CONSTRUCTION PLANS. <br />I. PLANS MUST SHOW REQUIRED THRUST RESTRAINT PER SECTION 5-13 OF THESE <br />STANDARDS. <br />J. ALL WATER CONSTRUCTION PLANS SHALL BE PREPARED, STAMPED AND SIGNED BY AN <br />ENGINEER REGISTERED IN THE STATE OF WASHINGTON. <br />WASTEWATER SYSTEM INSTALLATION NOTES: <br />1. PRIOR TO ANY CONSTRUCTION ACTIVITY, THE DEVELOPER SHALL ARRANGE A <br />PRE -CONSTRUCTION CONFERENCE WITH THE MUKILTEO WATER AND WASTEWATER DISTRICT. <br />THE DEVELOPER, CONTRACTOR AND PROPOSED ON -SITE SUPERVISOR SHALL ATTEND. <br />2. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST REVISION, <br />INCLUDING ADDENDA AND UPDATES, OF THE MUKILTEO WATER AND WASTEWATER DISTRICT <br />DEVELOPER STANDARDS. CONTRACTOR TO HAVE MUKILTEO WATER AND WASTEWATER <br />DISTRICT STANDARDS ON JOB SITE AT ALL TIMES WHILE CONSTRUCTION IS IN PROGRESS. <br />J. A DISTRICT APPROVED SIGNED COPY OF THE PLANS MUST BE ON THE JOB SITE <br />WHENEVER CONSTRUCTION IS IN PROGRESS. <br />4. ALL WORK AND MATERIAL SHALL BE IN ACCORDANCE WITH THE APPLICABLE STANDARDS <br />AND SPECIFICATIONS OF THE DISTRICT, THE PROJECT SPECIFICATIONS, AND THE MOST <br />RECENT EDITION OF THE APWA STANDARDS AND SPECIFICATIONS. <br />5. WORK SHALL NOT COMMENCE UNTIL APPROVAL IS RECEIVED FROM THE STATE <br />DEPARTMENT OF ECOLOGY, UNLESS THE REVIEW AND APPROVAL IS WAIVED BY ECOLOGY. <br />6. FRONT PROPERTY CORNERS SHALL BE SET BY ALAND SURVEYOR LICENSED IN THE STATE <br />OF WASHINGTON PRIOR TO THE START OF CONSTRUCTION. <br />7. NOTIFY THE DISTRICT 72 HOURS (3 WORKING DAYS) PRIOR TO BEGINNING CONSTRUCTION <br />AND FOR ANY RESTARTS OF WORK. <br />8. FOR AID IN UTILITY LOCATION, CALL 1-800-424-555, A MINIMUM OF 48 HOURS (2 <br />WORKING DAYS) PRIOR TO BEGINNING OF CONSTRUCTION. EXISTING UTILITIES, WHETHER <br />SHOWN OR NOT, SHALL BE LOCATED PRIOR TO CONSTRUCTION, SO AS TO AVOID DAMAGE <br />OR DISTURBANCE, AND THE DEVELOPER SHALL ASSUME ALL RESPONSIBILITY AND COSTS <br />CONNECTED THEREWITH TO PROTECT, MAINTAIN AND REPAIR, WHERE NECESSARY. <br />9. PIPE LENGTHS, MANHOLE DEPTHS, ETC., AS SHOWN ARE APPROXIMATE. DEVELOPER IS <br />RESPONSIBLE FOR SUPPLYING PROPER QUANTITIES OF MATERIALS. <br />10. PROVIDE THE DISTRICT'S INSPECTOR WITH A COPY OF ALL CUT SHEETS PRIOR TO <br />CONSTRUCTION. <br />11. PERMANENT ACCESS FOR DISTRICT SERVICE VEHICLES SHALL BE PROVIDED AT ALL <br />MANHOLES. MANHOLES SHALL BE CONSTRUCTED AS PER DISTRICT STANDARD DETAILS, <br />INCLUDING CONSTRUCTION OF CHANNELS. WHERE INDICATED, PROVIDE KNOCK -OUTS AND <br />CHANNELIZATION FOR SIDE SEWER OR FUTURE MAINLINE EXTENSIONS; AND FOR PVC PIPE, <br />PROVIDE A WATERTIGHT FLEXIBLE RUBBER BOOT OR HEAVY DUTY SAND COLLAR. PROVIDE <br />WATER TIGHT LOCKING LIDS FOR MANHOLE COVERS. <br />12. CONNECTION TO EXISTING MAIN SHALL BE DONE SO AS TO PREVENTANY FOREIGN <br />MATERIALS FROM ENTERING EXISTING SEWERS. EXISTING PIPE IN SADDLE MANHOLE <br />INSTALLATIONS SHALL NOT BE CUT OR REMOVED UNTIL INSTRUCTED TO DO SO BY THE <br />DISTRICT. <br />13. CONNECTION TO EXISTING MANHOLES SHALL BE MADE BY UTILIZATION OF A CONCRETE <br />CORE- DRILLING MACHINE OF ADEQUATE DIAMETER TO GROUT IN PLACE AN ADAPTER IF <br />PVC SEWER LINES ARE INSTALLED. ALIGN CORE -DRILLING MACHINE TO PROVIDE MINIMUM <br />OF 0. 10-FOOT DROP ACROSS THE MANHOLE. <br />14. PVC PIPE SHALL BE SD4-35 ASTM D3034 FURNISHED IN 13-FOOT MAXIMUM LENGTHS <br />AND SHALL BE FULLY ENCASED IN PEA GRAVEL (OR CRUSHED ROCK, BASE COURSE, IF <br />INSTALLED WITHIN THE CITY LIMITS OF EVERETT) EXTENDING FROM 4 INCHES BELOW TO <br />12 INCHES ABOVE PIPE BARREL. <br />15. DI SANITARY SEWER PIPE SHALL CONFORM TO AWWA C151 AND SHALL BE POLYETHYLENE <br />OR EPDXY LINED, RESTRAINED JOINT. THE DI PIPE SHALL BE CLASS 52, UNLESS <br />OTHERWISE APPROVED. <br />16. SEWERS TO BE LOCATED BELOW POTABLE WATER LINES, WITH 18-INCHES VERTICAL <br />SEPARATION AND WITH A MINIMUM OF 10 FOOT HORIZONTAL SEPARATION FROM PARALLEL <br />WATER LINES. CROSSING ANGLES SHALL BE 45 DEG. OR GREATER. UNUSUAL OR SPECIAL <br />CONDITIONS ARE ADDRESSED IN ACCORDANCE WITH THE DEPARTMENT ECOLOGY AND <br />DEPARTMENT OF HEALTH CRITERIA. <br />17. SIDE SEWER SHALL BE A MINIMUM OF 6 INCHES IN DIAMETER AND SHALL HAVE A <br />MINIMUM SLOPE OF 27.. SIDE SEWER SHALL INCLUDE TWO 6-INCH TEES AT THE <br />PROPERTY LINE; ONE WITHIN THE PUBLIC RIGHT-OF-WAY AND ONE WITHIN THE PRIVATE <br />PROPERTY. SEE DETAIL. <br />18. ALL SEWER LINES SHALL BE CLEANED AND TESTED IN ACCORDANCE WITH DISTRICT <br />STANDARDS AND SPECIFICATIONS. <br />19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING AND/OR REPAIRING ASPHALT <br />AND GRAVEL SURFACE DISTURBED AS A RESULT OF THIS CONSTRUCTION UNTIL THEY AR <br />ACCEPTED BY THE PUBLIC WORKS DEPARTMENT OF THE CITY AND/OR COUNTY. <br />20.COMPACTION: ALL TRENCH BACKFILL AND ROADWAY EMBANKMENT SHALL BE COMPACTED <br />TO 957. OF MODIFIED PROCTOR DRY MAXIMUM DENSITY IN ACCORDANCE WITH ASTM <br />D 1557, EXCEPT THE TOP 6 INCHES IN PAVED AREAS WHICH SHALL BE 1009. <br />21. MANHOLE COVERS LOCATED IN ASPHALT AREAS SHALL BE ADJUSTED TO FINISH GRADE <br />PRIOR TO PAVING. <br />22. NO UTILITY FACILITIES WILL BE ACCEPTED BY THE DISTRICT IF PROPER INSPECTIONSHAVE <br />NOT BEEN COMPLETED. <br />24. SEWER SERVICE IS AVAILABLE ONLY AFTER TRANSFER OF OWNERSHIP TO THE DISTRICT <br />AND AFTER PAYMENT OF ALL CURRENT APPLICABLE FEES. <br />